CMS Pixel Detector
Miscellaneous
Phase 1
Phase 2
Layer 1 Replacement
Layers 2-4
Layer 1 Replacement Elog, Page 1 of 16
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
Error: Attribute "Type" for quick filter not found
303 Entries
Goto page 1,
2
,
3
...
14
,
15
,
16
Next
All
ID
Date
Author
Category
Subject
Text
309
Mon Jan 25 13:03:22 2021
Dinko Ferencek
POS
POS configuration files created
The output POS configuration files has '_Bpix_'
instead of '_BPix_' in their names. The culprit
was identified to be the C3 cell in the 'POS'
308
Tue Jan 19 15:12:12 2021
Dinko Ferencek
POS
POS configuration files created
M1560 in position bpi_sec1_lyr1_ldr1_mod3
was replaced by M1613.
307
Mon Jan 18 13:53:44 2021
Andrey Starodumov
Other
DTB tests
M2217
--->DTB 154 (one of the red cold box setup):
- flat cable (with HV):
306
Tue Nov 10 00:50:47 2020
Dinko Ferencek
POS
POS configuration files created
[quote="danek kotlinski "][quote="Dinko Ferencek"]pXar
parameter files were converted to POS configuration
files by executing the following commands
305
Fri Nov 6 07:28:42 2020
danek kotlinski
POS
POS configuration files created
[quote="Dinko Ferencek"]pXar parameter files
were converted to POS configuration files
by executing the following commands on the
304
Fri Oct 23 13:33:04 2020
danek kotlinski
Module transfer
L1 & L2 modules to go to P5
The following modules will be transported
to CERN/P5 as spares.
303
Fri Sep 18 15:45:21 2020
Andrey Starodumov
Other
M2211 and M2122
I made a mistake and instead M2122 used ID
M2211 in the .ini file.
Hence now we do not have entry for M2122
302
Sat Sep 12 23:45:56 2020
Dinko Ferencek
POS
POS configuration files created
pXar parameter files were converted to POS
configuration files by executing the following
commands on the lab PC at PSI
301
Wed Sep 2 16:09:24 2020
Matej Roguljic
Modules for P
M1595 switch with M1558
Module 1595 was foreseen to go on the inner
ladder 5, position -2 (negative two). During
the pre-installation test, we saw it had
300
Fri Aug 28 14:07:24 2020
Andrey Starodumov
PhQualification
M1539
There is no new PH optimisation for this module?!
To be checked!
299
Fri Aug 28 12:02:48 2020
Andrey Starodumov
XRay HR tests
M1599
ROC5 has eff=93.65% and should be graded C.
Somehow efficiency was not taken into account
for HR test grading???
298
Fri Aug 28 11:53:23 2020
Andrey Starodumov
PhQualification
M1555
There is no new PH optimisation for this module?!
To be checked!
297
Fri Aug 28 11:13:33 2020
Andrey Starodumov
Module grading
M1615
M1615: one pixel in ROC10 unmaskable hence
should be graded C. Otherwise the module
is of grade A
296
Fri Aug 14 13:47:26 2020
Andrey Starodumov
General
new PH optimisation test and Total Overview
New PH optimisation is done at -20C as a FT,
hence the results of this test are added
to "DB" file as the second m20_1 test.
295
Wed Jul 29 17:19:43 2020
danek kotlinski
PhQualification
Change configuration for PH qialification
Preparing the new PH optimization I had to
make the following modifications:
294
Fri Jul 10 11:24:37 2020
Urs Langenegger
Reception test
proc600V3 modules
This week I tested 12 modules built with proc600v3.
The module numbers are M1722 - M1733.
The results are summarized at the usual place:
293
Sun Jul 5 13:20:55 2020
Dinko Ferencek
General
Disk cleanup on the lab PC (pc11366.psi.ch)
Home folder was cleaned up by deleting old
pXar output .log and .root files. The full
list is in the attached file. This released
292
Thu Jul 2 13:48:20 2020
danek kotlinski
Module transfer
Transport #7 to ETH
Lea brought the last batch of 8 modules to
ETH:
1542
291
Thu Jun 18 20:04:41 2020
danek kotlinski
Module transfer
Modules to ETH, transport #6
Today Lea has delivered another group of 18
modules to the ETH:
1604
290
Tue Jun 16 19:23:37 2020
danek kotlinski
Module transfer
modules from and to ETH, list 3
The 27 modules from list 2 have been transferred
back to PSI.
Goto page 1,
2
,
3
...
14
,
15
,
16
Next
All
ELOG V3.1.3-7933898