CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 159     Entry time: Mon Mar 30 17:40:35 2020
Author: Andrey Starodumov 
Category: HDI test 
Subject: 3+2 HDIs (re-)tested 
For 3 HDIs: 3014, 3017, 6021, HV has been re-measured. In all cases 790V is measured with 800V supplied.
2 HDIs: 1026, 5022 were tested. Both OK.
All 5 HDIs will be used in module assembly.
ELOG V3.1.3-7933898