CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Entry  Tue Mar 31 18:23:18 2020, Andrey Starodumov, Full test, FT of M1637, M1638, M1639, M1640 
    Reply  Fri Apr 3 14:15:01 2020, Andrey Starodumov, Full test, FT of M1637, M1638, M1639, M1640 
Message ID: 178     Entry time: Fri Apr 3 14:15:01 2020     In reply to: 169
Author: Andrey Starodumov 
Category: Full test 
Subject: FT of M1637, M1638, M1639, M1640 

Andrey Starodumov wrote:
M1637: C. Graded C due to not completed first test at -20C. Urs has reported issues. The second -20C after T-Cycle and test at +10C are graded A.
Tomorrow I'll upgrade this module manually to A
M1638: A
M1639: B Due to B at first -20C test. ROC8 mean noise >200electrons. Second -20C and at +10C both are graded A
M1640: B All three FT are B due to several ROCs mean noise >200electrons


Following procedure of regrading the first -20C test has been manually upgraded to B. The final grade is A since manual upgrade was not taken in to account. I do not know why. So, the module will be graded A.
ELOG V3.1.3-7933898