CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 179     Entry time: Fri Apr 3 14:18:15 2020
Author: Andrey Starodumov 
Category: Reception test 
Subject: RT of M1651 on April 2 
Due to damaged module adapter the first Reception test failed and after MoreWeb analysis graded C.
After second Reception test (with proper connected cable) the grade is A.
To keep grade A instead of C in the MoreWeb summary table I removed the directory of the first Reception:
:~/L1_DATA/M1651_Reception_2020-04-02_16h09m_1585836596 (but the .tar file is still there), run python Controller.py -d (and remove raw with C grade from GlobalFinalResult) and rerun python Controller.py -m M1651
ELOG V3.1.3-7933898