Activities on 27. 9. 2019.
Today Silvan wire bonded TBMs to the first batch of 8 new HDIs which were then tested. 5 out of 8 HDIs received a passing grade. Of the 3 failing HDIs, 2 had a spark occurring. The final testing results can be found in
https://github.com/mroguljic/HDI_L1/blob/bb78cddaacc7488910aa26bbf609fcff3618c597/HDIresults.csv
. Andrey and Danek performed a visual inspection of the 2 HDIs that sparked but could not find clear indications of locations where the sparking occurred. For one of the HDIs (V7.1-3-018) there was a possible indication of sparking on one of the TBM wire bonds but for the other module (V7.1-12-036) there was no such indication.
Updated HDI testing instructions and added a note about the SDA2,3 signal polarities being opposite to those of SDA0,1
Matej's latest updates to the automatization.py script were pushed to GitHub (
https://github.com/mroguljic/HDI_L1/commit/82b5cbb9e39e7ce7dc146bfa3bab0de75840d30e
)
Delimiters in the CSV file containing HDI testing results were changed from commas to semi-colons (
https://github.com/mroguljic/HDI_L1/commit/82b5cbb9e39e7ce7dc146bfa3bab0de75840d30e
) to allow for the use of commas in the comment column
Added reminder to the automatization.py script to check signal output on both A1- and A1+ (
https://github.com/mroguljic/HDI_L1/commit/79b46eec08ad7d705b70f38191555cdf79c44f5e
)
Pushed CSV files containing HDI testing results to GitHub (
https://github.com/mroguljic/HDI_L1/commit/bb78cddaacc7488910aa26bbf609fcff3618c597
)
Reception tests were run for M1522 after cap gluing (see