Message ID: 25
Entry time: Tue Oct 29 16:36:23 2019
|
Author: |
Matej Roguljic |
Category: |
Module assembly |
Subject: |
Assembly lab cap gluing jigs |
|
|
There are two jigs for cap gluing in the assembly lab, circled in red and blue on the photo in the attachment. The one closer to the door (red) we used to build glue Phase 2 HDI to a dummy sensor and four Phase2 ROCs. Before changing the head, the numbers of the alignment screws were noted.
The jig closer to the doors (red): Top two pins - 5.75; Left pin - 5.5
The jig further from the doors (blue): Top two pins - 5.71, Left pin - 3.25 |
|
|