CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 285     Entry time: Fri Jun 5 13:47:11 2020
Author: Andrey Starodumov 
Category: Module grading 
Subject: M1613 
FT of this modules has been done twice: March 23 and March 25, in both cases with the final test SW. On March 23 module was graded C due to many trim bit failures. That is why it was retested. But after failure in trimbits were excluded from the grading, FT of Mar 23 looks better then later FT of Mar25. That is why FT of Mar 23 is kept.
ELOG V3.1.3-7933898