CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 301     Entry time: Wed Sep 2 16:09:24 2020
Author: Matej Roguljic 
Category: Modules for P 
Subject: M1595 switch with M1558 
Module 1595 was foreseen to go on the inner ladder 5, position -2 (negative two). During the pre-installation test, we saw it had a high leakage current, ~8 microAmps at room temperature. Therefore, we decided to place module 1558 in its place instead of it.
ELOG V3.1.3-7933898