Message ID: 59
Entry time: Mon Feb 3 15:35:09 2020
|
Author: |
Anrey Starodumov |
Category: |
Full test |
Subject: |
4 modules FT: 1539, 1541,1542, 1543 |
|
|
Jan 29
- Reception test for 1539 OK
- Cap gluing
Jan 30
- Reception test for 1541, 1542, 1543 OK
- Cap gluing
- FT:
-- 1539: C/B/B. First -20 is C due to INCOMPLETE TEST: DTB stuck
==> Must be retested at -20C and then files merging
-- 1541: C/C/C. Electrical Test is C due to Trimbit test failure in ROC13. Threshold is reasonable (see attachment)
==> Manually regraded to B
-- 1542: C/C/C. Electrical Test is C due to RelGain of 0.200 instead of <0.1 (too wide Gain distribution).
-- 1543: B/B/B (-20/-20/+10). Electrical Test is B due to mean noise >200e. |
|
|