CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 59     Entry time: Mon Feb 3 15:35:09 2020
Author: Anrey Starodumov 
Category: Full test 
Subject: 4 modules FT: 1539, 1541,1542, 1543 
Jan 29
- Reception test for 1539 OK
- Cap gluing

Jan 30
- Reception test for 1541, 1542, 1543 OK
- Cap gluing
- FT:
-- 1539: C/B/B. First -20 is C due to INCOMPLETE TEST: DTB stuck
==> Must be retested at -20C and then files merging
-- 1541: C/C/C. Electrical Test is C due to Trimbit test failure in ROC13. Threshold is reasonable (see attachment)
==> Manually regraded to B
-- 1542: C/C/C. Electrical Test is C due to RelGain of 0.200 instead of <0.1 (too wide Gain distribution).
-- 1543: B/B/B (-20/-20/+10). Electrical Test is B due to mean noise >200e.
Attachment 1: 1542ROC13-TrThr.pdf  14 kB  | Hide | Hide all
1542ROC13-TrThr.pdf
ELOG V3.1.3-7933898