CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 64     Entry time: Tue Feb 4 19:52:22 2020
Author: Dinko Ferencek 
Category: Cold box tests 
Subject: Blue coldbox setup for reception tests commissioned 
Today I continued where Matej left off with commissioning the blue coldbox setup for reception tests. All the necessary software (pXar and elComandante) Matej already installed (just had to add the BB2 section in testParameters.dat). What was a problem in communication with Keithley (Model 2400) which was fixed after changing the BAUD rate in elComandante/keithleyClient/keithleyInterface.py to 19200 (value set in Keithley's communications settings) and changing FLOW-CRTL in Keithley's communication settings to XON-XOFF.

The reception test was successfully run for modules 1545, 1547, 1548, 1549, and 1550 after cap gluing.
ELOG V3.1.3-7933898