CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 85     Entry time: Fri Feb 14 14:05:16 2020
Author: Dinko Ferencek 
Category: Module assembly 
Subject: Production yield so far 
Of 41 modules produced and tested so far (1536-1576), 6 modules were found to be bad before or during the reception test, 5 were graded C after the full qualification (one of which is possibly C*) and the remaining 30 modules were graded B (of which 4 were manually regraded from C to B).

The overall yield for good modules (A+B/Total) produced so far is (30/41)=73%