CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 88     Entry time: Mon Feb 24 14:01:29 2020
Author: Urs Langenegger 
Category: Module assembly 
Subject: Cap gluing in W8 
In week 8 the following modules were glued and tested:

M1581
M1582
M1583
M1584
M1585
M1586
M1587
M1588
M1589
M1591

M1590 was not glued last week because it had one HV bond broken (Silvan fixed this on Monday, 20/02/24).

M1586 initially had problems with the readout after gluing, but this was fixed by porperly closing the MOLEX connector. In the reception test, M1586 was graded 'B'.

All other modules were graded 'A' in the reception test.

Overall the double-gluing setup works very well. The modules above were glued basically in one day.
ELOG V3.1.3-7933898