CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Message ID: 89     Entry time: Tue Feb 25 17:11:18 2020
Author: Urs Langenegger 
Category: Module assembly 
Subject: Modules glued and tested Feb 24/25 
Modules glued and tested Feb 24/25

The letters after the module name indicate the reception test grade.

M1590 A (after Silvan fixed broken HV bond)
M1592 A
M1595 B
M1596 A
M1597 A
M1599 C (leakage current: 16uA)
M1600 A

M1598 had a broken clock wire bond, was diagnosed by Wolfram and fixed by Silvan. Will be processed together with the other modules that had problems after taking them out of the storage box (M1593 and M1594), in case they can be fixed.
ELOG V3.1.3-7933898