CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog  Not logged in ELOG logo
Entry  Thu Sep 26 21:48:56 2019, Dinko Ferencek, Module assembly, Cap gluing training 
    Reply  Fri Sep 27 23:22:02 2019, Dinko Ferencek, Module assembly, Cap gluing training M1522_beforeGluing.pngM1522_afterGluing.pngM1522_diff.png
Message ID: 19     Entry time: Fri Sep 27 23:22:02 2019     In reply to: 16
Author: Dinko Ferencek 
Category: Module assembly 
Subject: Cap gluing training 
Attached are the bump bonding threshold maps before and after cap gluing and the (before - after) difference for M1522.
Attachment 1: M1522_beforeGluing.png  96 kB  Uploaded Sat Sep 28 00:23:13 2019  | Show | Show all
Attachment 2: M1522_afterGluing.png  96 kB  Uploaded Sat Sep 28 00:23:21 2019  | Show | Show all
Attachment 3: M1522_diff.png  117 kB  Uploaded Sat Sep 28 00:23:29 2019  | Show | Show all
ELOG V3.1.3-7933898