309
|
Mon Jan 25 13:03:22 2021 |
Dinko Ferencek | POS | POS configuration files created | The output POS configuration files has '_Bpix_'
instead of '_BPix_' in their names. The culprit
was identified to be the C3 cell in the 'POS' |
|
308
|
Tue Jan 19 15:12:12 2021 |
Dinko Ferencek | POS | POS configuration files created | M1560 in position bpi_sec1_lyr1_ldr1_mod3
was replaced by M1613.
|
|
307
|
Mon Jan 18 13:53:44 2021 |
Andrey Starodumov | Other | DTB tests | M2217
--->DTB 154 (one of the red cold box setup):
- flat cable (with HV):
|
|
306
|
Tue Nov 10 00:50:47 2020 |
Dinko Ferencek | POS | POS configuration files created | [quote="danek kotlinski "][quote="Dinko Ferencek"]pXar
parameter files were converted to POS configuration
files by executing the following commands |
|
305
|
Fri Nov 6 07:28:42 2020 |
danek kotlinski | POS | POS configuration files created | [quote="Dinko Ferencek"]pXar parameter files
were converted to POS configuration files
by executing the following commands on the |
|
304
|
Fri Oct 23 13:33:04 2020 |
danek kotlinski | Module transfer | L1 & L2 modules to go to P5 | The following modules will be transported
to CERN/P5 as spares.
|
|
303
|
Fri Sep 18 15:45:21 2020 |
Andrey Starodumov | Other | M2211 and M2122 | I made a mistake and instead M2122 used ID
M2211 in the .ini file.
Hence now we do not have entry for M2122 |
|
302
|
Sat Sep 12 23:45:56 2020 |
Dinko Ferencek | POS | POS configuration files created | pXar parameter files were converted to POS
configuration files by executing the following
commands on the lab PC at PSI
|
|
301
|
Wed Sep 2 16:09:24 2020 |
Matej Roguljic | Modules for P | M1595 switch with M1558 | Module 1595 was foreseen to go on the inner
ladder 5, position -2 (negative two). During
the pre-installation test, we saw it had |
|
300
|
Fri Aug 28 14:07:24 2020 |
Andrey Starodumov | PhQualification | M1539 | There is no new PH optimisation for this module?!
To be checked! |
|
299
|
Fri Aug 28 12:02:48 2020 |
Andrey Starodumov | XRay HR tests | M1599 | ROC5 has eff=93.65% and should be graded C.
Somehow efficiency was not taken into account
for HR test grading??? |
|
298
|
Fri Aug 28 11:53:23 2020 |
Andrey Starodumov | PhQualification | M1555 | There is no new PH optimisation for this module?!
To be checked! |
|
297
|
Fri Aug 28 11:13:33 2020 |
Andrey Starodumov | Module grading | M1615 | M1615: one pixel in ROC10 unmaskable hence
should be graded C. Otherwise the module
is of grade A
|
|
296
|
Fri Aug 14 13:47:26 2020 |
Andrey Starodumov | General | new PH optimisation test and Total Overview | New PH optimisation is done at -20C as a FT,
hence the results of this test are added
to "DB" file as the second m20_1 test.
|
|
295
|
Wed Jul 29 17:19:43 2020 |
danek kotlinski | PhQualification | Change configuration for PH qialification | Preparing the new PH optimization I had to
make the following modifications:
|
|
294
|
Fri Jul 10 11:24:37 2020 |
Urs Langenegger | Reception test | proc600V3 modules | This week I tested 12 modules built with proc600v3.
The module numbers are M1722 - M1733.
The results are summarized at the usual place: |
|
293
|
Sun Jul 5 13:20:55 2020 |
Dinko Ferencek | General | Disk cleanup on the lab PC (pc11366.psi.ch) | Home folder was cleaned up by deleting old
pXar output .log and .root files. The full
list is in the attached file. This released |
|
292
|
Thu Jul 2 13:48:20 2020 |
danek kotlinski | Module transfer | Transport #7 to ETH | Lea brought the last batch of 8 modules to
ETH:
1542
|
|
291
|
Thu Jun 18 20:04:41 2020 |
danek kotlinski | Module transfer | Modules to ETH, transport #6 | Today Lea has delivered another group of 18
modules to the ETH:
1604
|
|
290
|
Tue Jun 16 19:23:37 2020 |
danek kotlinski | Module transfer | modules from and to ETH, list 3 | The 27 modules from list 2 have been transferred
back to PSI.
|
|