Entry  Thu Feb 27 10:14:09 2020, danek kotlinski, Module transfer, M1562 to DESY 
M1562 was not qualified during a full test since the test did not complete.
Looking at the module I see that roc 2 has a lot of noise row 79.
I tried to mask all pixels in this row but the masking does not work.
Entry  Wed Mar 4 11:32:42 2020, danek kotlinski, Full test, change the target trim threshodl to vcal=50 
After some discussion we decided to change the target trimming threshold from vcal 40 to 50.
Many ROCs cannot be run with xrays at 40 while all I have seen until now can be run at 50.
45 might be possible for some rocs but will fail for others.
Entry  Wed Mar 25 14:42:55 2020, danek kotlinski, Module transfer, modules 1545 & 1542 back from ETH 
M1545 & M1542 were returned from ETH to PSI for further testing.
Entry  Wed Mar 25 20:17:16 2020, danek kotlinski, Module doctor, The list of modules tested today by Wolfram 
M1542     nothing on sdata3 (12-15), bad output or wire-bond
M1544     ROC15 timing off, can be made to work (roc 15 vdig 11, ..), but probably not usable for the detector
M1545     full readout, ok, upgraded to C*
Entry  Thu Mar 26 10:41:24 2020, danek kotlinski, Module grading, M1606 
I have looked more closely at M1606.
Trimming show problems in ROC2, 8 pixels have 0 threshold and for 61 pixels thr=-1.
Strange because from Scurves the 61 have a high ~62 threshold but no failure.
Entry  Sun Mar 29 18:14:59 2020, danek kotlinski, Other, Modules 1544 & 1563 in gelpack 
The 2 bad modules:
M1544
M1563 
Entry  Tue Mar 31 06:54:12 2020, danek kotlinski, Module grading, M1542 Canvas_1.png
I have tested M1542.
It looks not bad but there is a group of pixels in the lower/left corner of ROC6 which behave different.
One can also see that something is not right in some PH optimisation plots.
Entry  Thu Apr 9 14:19:40 2020, danek kotlinski, Module transfer, Modules moved to gel-pack 
The following good module class A/B have been moved to gel-packs:
1607, 1608, 1609, 1610, 1612, 1613, 1614, 1618, 1619, 1620, 1622, 1624, 1626, 1627, 1628.
    Reply  Thu Apr 9 16:13:51 2020, danek kotlinski, Module transfer, Modules moved to gel-pack 
[quote="danek kotlinski"]The following good module class A/B have been moved to gel-packs:
1607, 1608, 1609, 1610, 1612, 1613, 1614, 1618, 1619, 1620, 1622, 1624, 1626, 1627, 1628.
Entry  Wed Apr 15 08:48:09 2020, danek kotlinski, Module doctor, Wolfram's tests from 14/4/20 
two of are fixed and can be re-tested
M1623   tbm bond
M1657   bond roc 15
Entry  Wed Apr 15 17:14:42 2020, danek kotlinski, Module transfer, move 4 modules to gel-packs 
Moved to gel-apcks:
1629 B
1631 B
    Reply  Wed Apr 15 17:33:53 2020, danek kotlinski, Module transfer, move 4 modules to gel-packs 
[quote="danek kotlinski"]Moved to gel-apcks:
1629 B
1631 B
Entry  Thu Apr 30 15:38:43 2020, danek kotlinski, Module transfer, M1635 & M1671 transferred to gel-pack 
Two bad modules have been placed in gel-packs: 1635 & 1671.
Entry  Fri May 1 19:34:01 2020, danek kotlinski, Module grading, M1582 m1582_roc1_thr.pngm1582_roc1_thr_2d.png
M1582 was classified as C because of 167 pixels failing trimming in ROC1.
I have tested this module.
The attached plots show the 1d & 2d threshold distributions.
Entry  Mon May 11 14:14:05 2020, danek kotlinski, Other, M1606 m1606_roc2_thr_1d.pngm1606_roc2_thr_2d.pngm1606_roc2_ph70.png
On Friday I have tested M1606 at room temperature in the red cold box.
Previously it was reported that trimming does not work for ROC2.
Entry  Mon May 11 14:40:16 2020, danek kotlinski, Other, M1582 m1582_roc1_thr_1d.pngm1582_roc1_thr_2d.pngm1582_roc1_ph70.png
On Friday I have tested the module M1582 at room temperature in the blue box.
The report in MoreWeb says that this module has problems with trimming 190 pixels in ROC1.
Entry  Tue Jun 9 17:19:00 2020, danek kotlinski, Module transfer, gel-pack transfers  
The following modules, which were already X-ray tested and came back from ETHZ, 
have been transferred to gel_packs:
1623
Entry  Tue Jun 16 19:23:37 2020, danek kotlinski, Module transfer, modules from and to ETH, list 3 
The 27 modules from list 2 have been transferred back to PSI.

The following 18 modules have been transferred to ETH:
Entry  Thu Jun 18 20:04:41 2020, danek kotlinski, Module transfer, Modules to ETH, transport #6 
Today Lea has delivered another group of 18 modules to the ETH:
1604
1603
Entry  Thu Jul 2 13:48:20 2020, danek kotlinski, Module transfer, Transport #7 to ETH 
Lea brought the last batch of 8 modules to ETH:
1542
1593