CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 1 of 16  Not logged in ELOG logo
IDdown Date Author Category Subject Text Attachments
  309   Mon Jan 25 13:03:22 2021 Dinko FerencekPOSPOS configuration files createdThe output POS configuration files has '_Bpix_'
instead of '_BPix_' in their names. The culprit
was identified to be the C3 cell in the 'POS'
  
  308   Tue Jan 19 15:12:12 2021 Dinko FerencekPOSPOS configuration files createdM1560 in position bpi_sec1_lyr1_ldr1_mod3
was replaced by M1613.
  
  307   Mon Jan 18 13:53:44 2021 Andrey StarodumovOtherDTB testsM2217
--->DTB 154 (one of the red cold box setup):
- flat cable (with HV):
  
  306   Tue Nov 10 00:50:47 2020 Dinko FerencekPOSPOS configuration files created[quote="danek kotlinski "][quote="Dinko Ferencek"]pXar
parameter files were converted to POS configuration
files by executing the following commands
  
  305   Fri Nov 6 07:28:42 2020 danek kotlinskiPOSPOS configuration files created[quote="Dinko Ferencek"]pXar parameter files
were converted to POS configuration files
by executing the following commands on the
  
  304   Fri Oct 23 13:33:04 2020 danek kotlinskiModule transferL1 & L2 modules to go to P5The following modules will be transported
to CERN/P5 as spares.
  
  303   Fri Sep 18 15:45:21 2020 Andrey StarodumovOtherM2211 and M2122I made a mistake and instead M2122 used ID
M2211 in the .ini file.
Hence now we do not have entry for M2122
  
  302   Sat Sep 12 23:45:56 2020 Dinko FerencekPOSPOS configuration files createdpXar parameter files were converted to POS
configuration files by executing the following
commands on the lab PC at PSI
  
  301   Wed Sep 2 16:09:24 2020 Matej RoguljicModules for PM1595 switch with M1558Module 1595 was foreseen to go on the inner
ladder 5, position -2 (negative two). During
the pre-installation test, we saw it had
  
  300   Fri Aug 28 14:07:24 2020 Andrey StarodumovPhQualificationM1539There is no new PH optimisation for this module?!
To be checked!
  
  299   Fri Aug 28 12:02:48 2020 Andrey StarodumovXRay HR testsM1599ROC5 has eff=93.65% and should be graded C.
Somehow efficiency was not taken into account
for HR test grading???
  
  298   Fri Aug 28 11:53:23 2020 Andrey StarodumovPhQualificationM1555There is no new PH optimisation for this module?!
To be checked!
  
  297   Fri Aug 28 11:13:33 2020 Andrey StarodumovModule gradingM1615M1615: one pixel in ROC10 unmaskable hence
should be graded C. Otherwise the module
is of grade A
  
  296   Fri Aug 14 13:47:26 2020 Andrey StarodumovGeneralnew PH optimisation test and Total OverviewNew PH optimisation is done at -20C as a FT,
hence the results of this test are added
to "DB" file as the second m20_1 test.
  
  295   Wed Jul 29 17:19:43 2020 danek kotlinskiPhQualificationChange configuration for PH qialificationPreparing the new PH optimization I had to
make the following modifications:
  
  294   Fri Jul 10 11:24:37 2020 Urs LangeneggerReception testproc600V3 modulesThis week I tested 12 modules built with proc600v3.
The module numbers are M1722 - M1733. 
The results are summarized at the usual place:
  
  293   Sun Jul 5 13:20:55 2020 Dinko FerencekGeneralDisk cleanup on the lab PC (pc11366.psi.ch)Home folder was cleaned up by deleting old
pXar output .log and .root files. The full
list is in the attached file. This released
 pxar_junk_home.txt 
  292   Thu Jul 2 13:48:20 2020 danek kotlinskiModule transferTransport #7 to ETHLea brought the last batch of 8 modules to
ETH:
1542
  
  291   Thu Jun 18 20:04:41 2020 danek kotlinskiModule transferModules to ETH, transport #6Today Lea has delivered another group of 18
modules to the ETH:
1604
  
  290   Tue Jun 16 19:23:37 2020 danek kotlinskiModule transfermodules from and to ETH, list 3The 27 modules from list 2 have been transferred
back to PSI.
  
ELOG V3.1.3-7933898