CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 14 of 16  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subjectdown Text Attachments
  38   Thu Nov 28 15:58:20 2019 Matej RoguljicGeneralActivities 26.-29.11.2019.26.11.

Prepared the tools for RD53A digital module
 1-1.jpg1-2.jpg1-3.jpg1-4.jpg 
  15   Thu Sep 26 17:38:07 2019 Matej RoguljicGeneralActivities 25.-26.9.It was planned to test a batch of HDIs these
2 days but the shipment was late. Dinko and
Andrei were shown the HDI testing procedure.
  
  46   Mon Jan 20 18:09:50 2020 Matej RoguljicGeneralActivities 20.-31.01.2020.20.01.

Expanded the HDI testing setup to be able
  
  2   Tue Aug 6 15:15:00 2019 Matej RoguljicGeneralActivities 19.6.-4.7.2019.17.6.-21.6.

Andrei and Matej were at PSI working on the
  
  9   Thu Sep 12 10:32:27 2019 Matej RoguljicGeneralActivities 10.9.-19.9.2019.10.9.
Modules 1504,1505,1520 brought to PSI after
irradiation to 1.2 MGy in Zagreb. All 3 were
  
  13   Thu Sep 19 14:20:07 2019 Matej RoguljicGeneralActivities 10.9.-19.9.2019.[quote="Matej Roguljic"]10.9.
Modules 1504,1505,1520 brought to PSI after
irradiation to 1.2 MGy in Zagreb. All 3 were
  
  268   Tue May 19 13:43:55 2020 Andrey StarodumovModule transfer9 modules shipped to PSIQuick check: Leakage current, set Vana, VthrCompCalDel
and PixelAlive
Module    Current@-150V    Programmable 
  
  80   Wed Feb 12 10:43:04 2020 Dinko FerencekModule transfer9 modules sent to ETH: 1539, 1545, 1547, 1548, 1549, 1550, 1551, 1552, 1553Yesterday the following modules were sent
to ETH:
1539, 1545, 1547, 1548, 1549, 1550, 1551,
  
  277   Thu May 28 14:40:57 2020 Andrey StarodumovModule transfer8 modules shipped to PSIQuick check: Leakage current, set Vana, VthrCompCalDel
and PixelAlive
Module Current@-150V Programmable Readout
  
  267   Mon May 18 14:05:01 2020 Andrey StarodumovModule transfer8 modules shipped to ETHZM1555, M1556, M1557, 
M1558, M1559, M1560,
M1561, M1564
  
  126   Tue Mar 24 15:16:56 2020 Andrey StarodumovHDI test8 HDIs tested on Mar 231014, 1016, 2001, 2003, 
2004, 4013, 4015, 5014
All are good.
  
  189   Mon Apr 6 17:07:23 2020 Andrey StarodumovHDI test8 HDIs testedHDIs
4937 5043 5042 4040
2029 4019 4018 4017
  
  102   Wed Mar 11 17:22:57 2020 Matej RoguljicHDI test8 HDI tests on 11.3.I tested 8 HDIs today: 5029,5030,5031,6034,6036,6035,1031
and 1032
All of them tested fine.
  
  62   Tue Feb 4 19:35:38 2020 Dinko FerencekModule transfer7 modules prepared for transfer to ETH: 1536, 1537, 1538, 1540, 1541, 1542, 1543The following modules have been prepared today
for transport to ETH for x-ray qualification:
1536, 1537, 1538, 1540, 1541, 1542, 1543
  
  145   Thu Mar 26 17:43:06 2020 Andrey StarodumovHDI test6+1 HDI testedHDIs: 6021, 3014, 2005, 2009, 2006 and 2010
are OK
HDI 6024 failed: SDA0 and SDA2 on Ch1 missing
  
  174   Thu Apr 2 17:08:03 2020 Andrey StarodumovHDI test6 HDIs tested3013, 1046, 1047, 1048, 5038, 5039 are tested.
All are OK.
  
  194   Tue Apr 7 17:59:27 2020 Andrey StarodumovHDI test6 HDIs testedHDIs
2030, 2031, 1021, 1022, 1023, 1035 
are tested. All OK.
  
  60   Mon Feb 3 15:53:32 2020 Andrey StarodumovReception test5 modules RT: 1545, 1547, 1548, 1549, 1550[COLOR=blue]Feb 03[/COLOR]
- RT is done and OK for all modules. All
5 modules graded [COLOR=darkgreen]A[/COLOR].
  
  104   Thu Mar 12 12:19:43 2020 Matej RoguljicHDI test5 HDI tests on 12.3.I tested 5 HDIs on 12.3. 1030,1029,1040,1039
and 1038. 1039 failed all the electrical
tests. All the others passed the tests. HDI
  
  138   Wed Mar 25 18:30:23 2020 Andrey StarodumovHDI test4+2 HDI tested2 suspicious HDIs retested and found OK: 5006/5007
5013, 5016, 3017, 3019 are OK.
  
ELOG V3.1.3-7933898