Entry  Mon Jan 18 13:53:44 2021, Andrey Starodumov, Other, DTB tests 
M2217
--->DTB 154 (one of the red cold box setup):
- flat cable (with HV):
Entry  Tue Nov 19 14:10:10 2019, Andrey , Cold box tests, new modules M1533 and M1534 
Yesterday Silvan wire bonded two new modules M1533 and M1534 that are both grade C due to high leakage current and a few ROCs with large number of defective
bump bonds.
Today I run [B]Reception1st tes[/B]t with IV at +10C for both modules and above features are confirmed. 
Entry  Wed Nov 20 16:53:50 2019, Andrey , Full test, M1533 and M1534 FullQualification 
FullQualification of two modules M1533 and M1534 has been done. Full time of the test is about 7hrs.
Test included: FT@-10C, IV@-10, 2Cycles from -10C up to +10C, FT@-10C, IV@-10C, Ft@1-C and IV@10C.
No issues observed. 