CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layers 2-4 Elog, Page 1 of 1  Not logged in ELOG logo
Entry  Thu Sep 3 16:22:12 2020, Dinko Ferencek, Software, pXar configuration for L2-L3 modules 
New sets of pXar configuration files were generated for L2 and L3 modules

cd /home/l_tester/L1_SW/pxar/main/
Entry  Thu Sep 3 18:35:37 2020, Dinko Ferencek, Software, elComandante setup for L2-L3 modules 
A new branch called 'L2L3spares' was created in the elComandante repository that contains configuration modifications needed for testing L2 and L3 spare
modules. All changes between the 'L2L3spares' branch and the default 'L1replacement' branch can be seen [URL=https://gitlab.cern.ch/CMS-IRB/elComandante/-/compare/L1replacement...L2L3spares]here[/URL].
Entry  Mon Sep 7 11:37:37 2020, Dinko Ferencek, Software, MoReWeb setup for L2-L3 modules  
A new branch called 'L2L3spares' was created in the MoReWeb repository that contains configuration modifications needed for testing L2 and L3 spare modules.
All changes between the 'L2L3spares' branch and the default 'L1replacement' branch can be seen [URL=https://gitlab.cern.ch/CMS-IRB/MoReWeb/-/compare/L1replacement...L2L3spares]here[/URL].
Entry  Tue Sep 8 10:28:08 2020, Matej Roguljic, Qualification, Qualification on 07.09. 
Four L2 modules were tested. The tests consist of Fulltest@-20, IV@-20, Temperature cycle (n=3), Fulltest@+10, IV@+10.
Modules tested:
M2026: A
Entry  Wed Sep 9 11:23:29 2020, Matej Roguljic, Qualification, Qualification on 08.09. 
Four L2 modules were tested:

M2153 - C (IV@10)
Entry  Fri Sep 11 11:57:37 2020, Matej Roguljic, Qualification, Qualification on 09.09. 
Four L2 modules were tested:

M2035 - B
Entry  Fri Sep 11 12:00:02 2020, Matej Roguljic, Qualification, Qualification on 10.09. 
Four L2 modules were tested:

M2160 - A
Entry  Fri Sep 11 14:48:39 2020, Matej Roguljic, Qualification, Qualification on 11.09. 
Four L2 modules were tested:

M2077 - B
Entry  Tue Feb 16 16:04:18 2021, Andrey Starodumov, General, POS calibrarion files created for L2 modules 
Following Dinko's instructions and after small modifications configuration files are created for modules:
BPix_BmI_SEC7_LYR2_LDR12F_MOD1.dat
BPix_BmI_SEC8_LYR2_LDR14F_MOD1.dat