CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layers 2-4 Elog, Page 1 of 1  Not logged in ELOG logo
ID Date Author Category Subject
  9   Tue Feb 16 16:04:18 2021 Andrey StarodumovGeneralPOS calibrarion files created for L2 modules
Following Dinko's instructions and after small modifications configuration files are created for modules:
BPix_BmI_SEC7_LYR2_LDR12F_MOD1.dat
BPix_BmI_SEC8_LYR2_LDR14F_MOD1.dat
BPix_BmO_SEC3_LYR2_LDR5F_MOD1.dat
BPix_BmO_SEC3_LYR2_LDR5F_MOD2.dat
BPix_BmO_SEC3_LYR2_LDR5F_MOD3.dat
BPix_BpO_SEC1_LYR2_LDR1F_MOD1.dat
BPix_BpO_SEC1_LYR2_LDR1F_MOD2.dat
BPix_BpO_SEC1_LYR2_LDR1F_MOD3.dat

The tar files are in /home/l_tester/L2L3_DATA/POS_files/Configuration_files directory

(keep in mind the message in https://elrond.irb.hr/elog/Layer+1+Replacement/303)
  8   Fri Sep 11 14:48:39 2020 Matej RoguljicQualificationQualification on 11.09.
Four L2 modules were tested:

M2077 - B
M2197 - B
M2217 - B
M2232 - A
  7   Fri Sep 11 12:00:02 2020 Matej RoguljicQualificationQualification on 10.09.
Four L2 modules were tested:

M2160 - A
M2355 - A
M2293 - A
M2298 - A

M2160 was retested since we suspected that poor HV contact caused it to be graded as C in its previous qualification (07.09.)
  6   Fri Sep 11 11:57:37 2020 Matej RoguljicQualificationQualification on 09.09.
Four L2 modules were tested:

M2035 - B
M2036 - B
M2062 - A
M2155 - B
  5   Wed Sep 9 11:23:29 2020 Matej RoguljicQualificationQualification on 08.09.
Four L2 modules were tested:

M2153 - C (IV@10)
M2258 - A
M2269 - A
M2278 - B (IV@10)
  4   Tue Sep 8 10:28:08 2020 Matej RoguljicQualificationQualification on 07.09.
Four L2 modules were tested. The tests consist of Fulltest@-20, IV@-20, Temperature cycle (n=3), Fulltest@+10, IV@+10.
Modules tested:
M2026: A
M2078: A
M2126: A
M2160: C - this one is interesting since it's graded A at +10, but at -20 the results are horrible and we can see sensor wafer pattern.
  3   Mon Sep 7 11:37:37 2020 Dinko FerencekSoftwareMoReWeb setup for L2-L3 modules
A new branch called 'L2L3spares' was created in the MoReWeb repository that contains configuration modifications needed for testing L2 and L3 spare modules. All changes between the 'L2L3spares' branch and the default 'L1replacement' branch can be seen here.

Commands to run MoReWeb with the L2L3 setup are the following

cd /home/l_tester/L1_SW/MoReWeb/Analyse

git checkout L2L3spares (to switch to the 'L2L3spares' branch if not already on it)
python Controller.py -new


For going back to the L1 setup, one needs to run from inside a MoReWeb folder

git checkout L1replacement
  2   Thu Sep 3 18:35:37 2020 Dinko FerencekSoftwareelComandante setup for L2-L3 modules
A new branch called 'L2L3spares' was created in the elComandante repository that contains configuration modifications needed for testing L2 and L3 spare modules. All changes between the 'L2L3spares' branch and the default 'L1replacement' branch can be seen here.

Commands to run elComandante with the L2L3 setup are the following

cd /home/l_tester/L1_SW/elComandante/elComandante

git checkout L2L3spares (to switch to the 'L2L3spares' branch if not already on it)
python el_comandante.py -I FullQualificationL2L3.ini


For going back to the L1 setup, one needs to run from inside the elComandante folder

git checkout L1replacement
  1   Thu Sep 3 16:22:12 2020 Dinko FerencekSoftwarepXar configuration for L2-L3 modules
New sets of pXar configuration files were generated for L2 and L3 modules

cd /home/l_tester/L1_SW/pxar/main/

For L2

./mkConfig -d ../data/tbm09c -t TBM09C -r digv21respin -m

For L3

./mkConfig -d ../data/tbm08c -t TBM08C -r digv21respin -m

In both cases the Vcal value for the Trim test was changed from 50 to 35 in testParameters.dat. Finally, a copy of these folders was created

/home/l_tester/L1_SW/pxar/data/tbm08c_pxar/
/home/l_tester/L1_SW/pxar/data/tbm09c_pxar/

for interactive use with pXar.
ELOG V3.1.3-7933898