CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layers 2-4 Elog, Page 1 of 1  Not logged in ELOG logo
ID Datedown Author Category Subject Text Attachments
  9   Tue Feb 16 16:04:18 2021 Andrey StarodumovGeneralPOS calibrarion files created for L2 modulesFollowing Dinko's instructions and after small
modifications configuration files are created
for modules:
  
  8   Fri Sep 11 14:48:39 2020 Matej RoguljicQualificationQualification on 11.09.Four L2 modules were tested:

M2077 - B
  
  7   Fri Sep 11 12:00:02 2020 Matej RoguljicQualificationQualification on 10.09.Four L2 modules were tested:

M2160 - A
  
  6   Fri Sep 11 11:57:37 2020 Matej RoguljicQualificationQualification on 09.09.Four L2 modules were tested:

M2035 - B
  
  5   Wed Sep 9 11:23:29 2020 Matej RoguljicQualificationQualification on 08.09.Four L2 modules were tested:

M2153 - C (IV@10)
  
  4   Tue Sep 8 10:28:08 2020 Matej RoguljicQualificationQualification on 07.09.Four L2 modules were tested. The tests consist
of Fulltest@-20, IV@-20, Temperature cycle
(n=3), Fulltest@+10, IV@+10.
  
  3   Mon Sep 7 11:37:37 2020 Dinko FerencekSoftwareMoReWeb setup for L2-L3 modules A new branch called 'L2L3spares' was created
in the MoReWeb repository that contains configuration
modifications needed for testing L2 and L3
  
  2   Thu Sep 3 18:35:37 2020 Dinko FerencekSoftwareelComandante setup for L2-L3 modulesA new branch called 'L2L3spares' was created
in the elComandante repository that contains
configuration modifications needed for testing
  
  1   Thu Sep 3 16:22:12 2020 Dinko FerencekSoftwarepXar configuration for L2-L3 modulesNew sets of pXar configuration files were
generated for L2 and L3 modules
  
ELOG V3.1.3-7933898