CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 10 of 16  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Datedown Author Category Subject Text Attachments
  128   Tue Mar 24 15:20:18 2020 Andrey StarodumovReception testM1623 failed ReceptionM1623: all ROCs are programmable but no readout
from ROC0-ROC3.
Visual inspection is OK.
  
  127   Tue Mar 24 15:18:59 2020 Andrey StarodumovReception testM1621 failed ReceptionOn M1621 ROC8 is not programmable.   
  126   Tue Mar 24 15:16:56 2020 Andrey StarodumovHDI test8 HDIs tested on Mar 231014, 1016, 2001, 2003, 
2004, 4013, 4015, 5014
All are good.
  
  125   Sun Mar 22 14:05:20 2020 Danek KotlinskiReception testM1615 failed[quote="Andrey Starodumov"]M1615 is programmable
but "no working phases found"
Visual inspection of wire bonds - OK.
  
  124   Sun Mar 22 14:02:20 2020 Danek KotlinskiReception testM1616 failed[quote="Andrey Starodumov"]ROC10 of M1616
is not programmable, no readout from ROC10
and ROC11.
  
  123   Sun Mar 22 13:57:25 2020 Danek KotlinskiReception testM1617 failed[quote="Andrey Starodumov"]ROC8 of M1617 is
programmable but no readout from it.
Silvan noticed that a corner of one ROC of
  
  122   Fri Mar 20 18:32:34 2020 Andrey StarodumovFull testFT of M1609-M1612M1609 and M1611 are graded C
M1610 and M1612 are graded B
  
  121   Fri Mar 20 18:09:47 2020 Andrey StarodumovHDI test3 HDIs tested5008 failed, but most likely die to the pin
head mis-alignment. Test to be repeated.
5007 and 5008: passed tests but during HV
  
  120   Fri Mar 20 17:05:58 2020 Andrey StarodumovReception testM1617 failedROC8 of M1617 is programmable but no readout
from it.
Silvan noticed that a corner of one ROC of
  
  119   Fri Mar 20 14:53:52 2020 Andrey StarodumovReception testM1616 failedROC10 of M1616 is not programmable, no readout
from ROC10 and ROC11.
Visual inspection of wire bonds - OK
  
  118   Fri Mar 20 14:46:31 2020 Andrey StarodumovReception testM1615 failedM1615 is programmable but "no working phases
found"
Visual inspection of wire bonds - OK.
  
  117   Thu Mar 19 18:01:50 2020 Andrey StarodumovFull testFT of M1605-M1608Only M1607 graded B. All others are graded
C due to trimbit test. 
M1606 should be looked carefully and may
  
  116   Thu Mar 19 17:17:27 2020 Andrey StarodumovReception testM1609-M16012Reception test done and caps are glued to
modules M1609-M1612.
M1611 graded B due to double column failure
  
  115   Wed Mar 18 17:46:07 2020 Andrey StarodumovFull testFT of M1601-M1604M1601-M1604 passed full test
M1601: grade B
M1602-M1604: Grade C. The main reason is
  
  114   Wed Mar 18 17:43:41 2020 Andrey StarodumovModule assemblyM1605-M1608M1605 and M1606: reception done on Mar 17
M1607 and M1608: reception done today
All: grade A
  
  113   Wed Mar 18 15:23:27 2020 Andrey StarodumovGeneralNew rules at PSIFrom today only two persons from the group
allowed to be present. We are working in
shifts: Urs in the morning start full qualification
  
  112   Wed Mar 18 15:16:47 2020 Andrey StarodumovSoftwareChange in trimmig algorithmUrs yesterday modified the algorithm and tested
it. From today we are using it. Main change
that threshold for trimming is not any more
  
  111   Mon Mar 16 15:20:03 2020 Matej RoguljicPhQualificationPhQualification on 16.3.PhQualification was run on modules M1561,
M1564, M1565, M1566. 
  
  110   Mon Mar 16 15:17:18 2020 Matej RoguljicModule assemblyM1601 and M1602Andrey and I assembled modules 1601 and 1602
on Friday, 13.3. On Monday, 16.3. I ran reception
on them (both graded A) and then glued protection
  
  109   Mon Mar 16 11:04:41 2020 Matej RoguljicPhQualificationPhQualification 14.-15.3.I ran PhQualification over the weekend with
changes pulled from git (described here https://elrond.irb.hr/elog/Layer+1+Replacement/108).
  
ELOG V3.1.3-7933898