CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 6 of 16  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Feb 4 19:52:22 2020, Dinko Ferencek, Cold box tests, Blue coldbox setup for reception tests commissioned 
Entry  Wed Feb 5 16:07:03 2020, Dinko Ferencek, Module assembly, Module assembly spreadsheet migrated to Google Sheets 
Entry  Wed Feb 5 16:18:30 2020, Dinko Ferencek, Module transfer, Module location tracking added to the assembly spreadsheet 
Entry  Thu Feb 6 00:45:25 2020, Dinko Ferencek, Cold box tests, Lost at least one Peltier in the coldbox TemperatureCycle.pdf
Entry  Thu Feb 6 17:09:50 2020, Dinko Ferencek, Module assembly, Gluing stamp improvements 
Entry  Thu Feb 6 17:19:12 2020, Dinko Ferencek, Reception test, RT for 6 modules: 1551, 1552, 1553, 1554, 1555, 1556 
    Reply  Thu Feb 6 17:28:23 2020, Dinko Ferencek, Cold box tests, New Peltiers installed IMG_20200206_144211_resized.jpgIMG_20200206_145330_resized.jpgIMG_20200206_155320_resized.jpg
Entry  Fri Feb 7 19:40:27 2020, Dinko Ferencek, Reception test, RT for 6 modules: 1557, 1558, 1559, 1560, 1561, 1562  
Entry  Fri Feb 7 20:35:44 2020, Dinko Ferencek, Full test, FT for 4 modules: 1545, 1547, 1548, 1549 TemperatureCycle.pdf
Entry  Sat Feb 8 20:48:11 2020, Dinko Ferencek, Full test, FT for 4 modules: 1550, 1551, 1552, 1553  M1553_C11_AddressDecoding.pdfTemperatureCycle.pdf
Entry  Sun Feb 9 10:52:17 2020, Dinko Ferencek, Full test, FT for 4 modules: 1539, 1554, 1555, 1556 
Entry  Sun Feb 9 12:05:47 2020, Dinko Ferencek, Module assembly, Cap gluing 
Entry  Sun Feb 9 18:36:13 2020, Dinko Ferencek, Module grading, Manual grading 
Entry  Sun Feb 9 19:34:55 2020, Dinko Ferencek, Full test, FT for 4 modules: 1557, 1558, 1559, 1560  
Entry  Tue Feb 11 10:25:32 2020, Dinko Ferencek, Reception test, RT for 6 modules: 1563, 1564, 1565, 1566, 1567, 1568 
Entry  Tue Feb 11 17:56:06 2020, Dinko Ferencek, Cold box tests, Fulltest failure - psiAgente 
Entry  Wed Feb 12 10:43:04 2020, Dinko Ferencek, Module transfer, 9 modules sent to ETH: 1539, 1545, 1547, 1548, 1549, 1550, 1551, 1552, 1553 
Entry  Wed Feb 12 11:15:04 2020, Dinko Ferencek, Module grading, Problem with dead trimbits understood 14x
Entry  Wed Feb 12 15:40:13 2020, Dinko Ferencek, Reception test, RT for 3 modules: 1569, 1570, 1571; 1572 bad 
Entry  Thu Feb 13 21:44:28 2020, Dinko Ferencek, Reception test, RT for 6 modules: 1573, 1574, 1575, 1576, 1577, 1578 
ELOG V3.1.3-7933898