ID |
Date |
Author |
Category |
Subject |
Text |
|
128
|
Tue Mar 24 15:20:18 2020 |
Andrey Starodumov | Reception test | M1623 failed Reception | M1623: all ROCs are programmable but no readout
from ROC0-ROC3.
Visual inspection is OK.
|
|
127
|
Tue Mar 24 15:18:59 2020 |
Andrey Starodumov | Reception test | M1621 failed Reception | On M1621 ROC8 is not programmable. |
|
126
|
Tue Mar 24 15:16:56 2020 |
Andrey Starodumov | HDI test | 8 HDIs tested on Mar 23 | 1014, 1016, 2001, 2003,
2004, 4013, 4015, 5014
All are good. |
|
125
|
Sun Mar 22 14:05:20 2020 |
Danek Kotlinski | Reception test | M1615 failed | [quote="Andrey Starodumov"]M1615 is programmable
but "no working phases found"
Visual inspection of wire bonds - OK.
|
|
124
|
Sun Mar 22 14:02:20 2020 |
Danek Kotlinski | Reception test | M1616 failed | [quote="Andrey Starodumov"]ROC10 of M1616
is not programmable, no readout from ROC10
and ROC11.
|
|
123
|
Sun Mar 22 13:57:25 2020 |
Danek Kotlinski | Reception test | M1617 failed | [quote="Andrey Starodumov"]ROC8 of M1617 is
programmable but no readout from it.
Silvan noticed that a corner of one ROC of |
|
122
|
Fri Mar 20 18:32:34 2020 |
Andrey Starodumov | Full test | FT of M1609-M1612 | M1609 and M1611 are graded C
M1610 and M1612 are graded B
|
|
121
|
Fri Mar 20 18:09:47 2020 |
Andrey Starodumov | HDI test | 3 HDIs tested | 5008 failed, but most likely die to the pin
head mis-alignment. Test to be repeated.
5007 and 5008: passed tests but during HV |
|
120
|
Fri Mar 20 17:05:58 2020 |
Andrey Starodumov | Reception test | M1617 failed | ROC8 of M1617 is programmable but no readout
from it.
Silvan noticed that a corner of one ROC of |
|
119
|
Fri Mar 20 14:53:52 2020 |
Andrey Starodumov | Reception test | M1616 failed | ROC10 of M1616 is not programmable, no readout
from ROC10 and ROC11.
Visual inspection of wire bonds - OK
|
|
118
|
Fri Mar 20 14:46:31 2020 |
Andrey Starodumov | Reception test | M1615 failed | M1615 is programmable but "no working phases
found"
Visual inspection of wire bonds - OK.
|
|
117
|
Thu Mar 19 18:01:50 2020 |
Andrey Starodumov | Full test | FT of M1605-M1608 | Only M1607 graded B. All others are graded
C due to trimbit test.
M1606 should be looked carefully and may |
|
116
|
Thu Mar 19 17:17:27 2020 |
Andrey Starodumov | Reception test | M1609-M16012 | Reception test done and caps are glued to
modules M1609-M1612.
M1611 graded B due to double column failure |
|
115
|
Wed Mar 18 17:46:07 2020 |
Andrey Starodumov | Full test | FT of M1601-M1604 | M1601-M1604 passed full test
M1601: grade B
M1602-M1604: Grade C. The main reason is |
|
114
|
Wed Mar 18 17:43:41 2020 |
Andrey Starodumov | Module assembly | M1605-M1608 | M1605 and M1606: reception done on Mar 17
M1607 and M1608: reception done today
All: grade A
|
|
113
|
Wed Mar 18 15:23:27 2020 |
Andrey Starodumov | General | New rules at PSI | From today only two persons from the group
allowed to be present. We are working in
shifts: Urs in the morning start full qualification |
|
112
|
Wed Mar 18 15:16:47 2020 |
Andrey Starodumov | Software | Change in trimmig algorithm | Urs yesterday modified the algorithm and tested
it. From today we are using it. Main change
that threshold for trimming is not any more |
|
111
|
Mon Mar 16 15:20:03 2020 |
Matej Roguljic | PhQualification | PhQualification on 16.3. | PhQualification was run on modules M1561,
M1564, M1565, M1566. |
|
110
|
Mon Mar 16 15:17:18 2020 |
Matej Roguljic | Module assembly | M1601 and M1602 | Andrey and I assembled modules 1601 and 1602
on Friday, 13.3. On Monday, 16.3. I ran reception
on them (both graded A) and then glued protection |
|
109
|
Mon Mar 16 11:04:41 2020 |
Matej Roguljic | PhQualification | PhQualification 14.-15.3. | I ran PhQualification over the weekend with
changes pulled from git (described here https://elrond.irb.hr/elog/Layer+1+Replacement/108).
|
|