  148   Fri Mar 27 14:28:14 2020 Andrey StarodumovReception testM1633 failed ReceptionAll ROCs are programmable but permanent DESERALISER
ERROR, Ch6 and Ch7 event ID mismatch.
Visual inspection is OK
  
  147   Fri Mar 27 10:54:04 2020 Urs LangeneggerFull testIssues with pc11366 on March 27On March 27 I had a lot of troubles getting
the full qualification up
and running.
  
  146   Thu Mar 26 17:45:15 2020 Andrey StarodumovFull testFT of M1545, M1557, M1627, M1628Retested M1545: C->B (to be correct on the
MoreWeb summary page)
Retested 1557: C->C in one ROC >160 pixels
  
  145   Thu Mar 26 17:43:06 2020 Andrey StarodumovHDI test6+1 HDI testedHDIs: 6021, 3014, 2005, 2009, 2006 and 2010
are OK
HDI 6024 failed: SDA0 and SDA2 on Ch1 missing
  
  144   Thu Mar 26 17:41:52 2020 Andrey StarodumovReception testRT of M1629-1632All modules M1629, M1630, M1631 and M1632
graded A
  
  143   Thu Mar 26 15:37:18 2020 UrsModule gradingM1606attached find the threshold difference distributions
for all four trimbits for all ROCs
 anaTrim-thrDiff-data__M1606__pxar.pdf 
  142   Thu Mar 26 10:41:24 2020 danek kotlinskiModule gradingM1606I have looked more closely at M1606.
Trimming show problems in ROC2, 8 pixels
have 0 threshold and for 61 pixels thr=-1.
  
  141   Wed Mar 25 20:17:16 2020 danek kotlinskiModule doctorThe list of modules tested today by WolframM1542     nothing on sdata3 (12-15), bad output
or wire-bond
M1544     ROC15 timing off, can be made to
  
  140   Wed Mar 25 18:40:53 2020 Andrey StarodumovFull testFT of M1599, M1613, M1624, M1616M1599: B due to leakage current at +10 (2-3umA)
M1613: B due to a few pixels with bad trimmed
threshold
  
  139   Wed Mar 25 18:31:46 2020 Andrey StarodumovRe-gradingReanalised test results[quote="Andrey Starodumov"]Test resulsts of
several modules have been re-analised without
grading on trimbit failure. 
  
  138   Wed Mar 25 18:30:23 2020 Andrey StarodumovHDI test4+2 HDI tested2 suspicious HDIs retested and found OK: 5006/5007
5013, 5016, 3017, 3019 are OK.
  
  137   Wed Mar 25 17:03:11 2020 Andrey StarodumovFull testFT of M1615, M1619, M1620, M1622[quote="Andrey Starodumov"]Test results have
been analysed with modified code:
M1615: B
  
  136   Wed Mar 25 14:44:37 2020 Andrey StarodumovReception testRT of M1627 and M1628Both modules graded A.   
  135   Wed Mar 25 14:42:55 2020 danek kotlinskiModule transfermodules 1545 & 1542 back from ETHM1545 & M1542 were returned from ETH to PSI
for further testing.
  
  134   Wed Mar 25 14:17:51 2020 Andrey StarodumovFull testFT of M1609, M1613, M1614, M1618 on Mar 23FT for these modules has been done on Mar
23
M1609: C
  
  133   Wed Mar 25 14:11:35 2020 Andrey StarodumovReception testRT of M1613 and M1614 on Mar 20Reception test for these modules have been
done on Mar20.
Grading A for both modules.
  
  132   Tue Mar 24 18:11:52 2020 Andrey StarodumovRe-gradingReanalised test resultsTest resulsts of several modules have been
re-analised without grading on trimbit failure.
  
  131   Tue Mar 24 18:09:07 2020 Andrey StarodumovFull testFT of M1615, M1619, M1620, M1622Test results have been analysed with modified
code:
M1615: B
  
  130   Tue Mar 24 16:08:58 2020 Andrey StarodumovReception testM1625 failed ReceptionM1625: all ROCs are programmable but no readout
from ROC0-ROC3.
The same symptom as for M1623.
  
  129   Tue Mar 24 15:41:29 2020 Andrey StarodumovModule gradingChange in MoreWeb GradingParameters.cfg On March 3d the Vcal calibration parameter