CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 15 of 16  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  23   Mon Oct 28 17:01:05 2019 Matej RoguljicSoftware Investigating the bug with the Keithley clientWe took module 1529 and tried recreating the
issue observed in the beginning of October.
To do this in a reasonable amount of time,
  
  22   Sat Oct 5 22:59:58 2019 Dinko FerencekSoftwareProblem with elComandante Keithley client during full qualificationA new attempt to run the full qualification
for M1532 was made on Friday, Oct. 4, but
the Keithely client crashed with the same
  
  21   Wed Oct 2 12:50:52 2019 Dinko FerencekSoftwareProblem with elComandante Keithley client during full qualificationFull qualification was attempted for M1532
on Oct. 1. After the second Fulltest at -20
C finished, the Keitley client crashed with
  
  20   Wed Oct 2 12:41:16 2019 Dinko FerencekModule assemblyFirst production modules assembledFirst production modules (M1530, M1531, M1532)
were built on Monday, Sep. 30 2019.
 6x 
  19   Fri Sep 27 23:22:02 2019 Dinko FerencekModule assemblyCap gluing trainingAttached are the bump bonding threshold maps
before and after cap gluing and the (before
- after) difference for M1522.
 M1522_beforeGluing.pngM1522_afterGluing.pngM1522_diff.png 
  18   Fri Sep 27 22:24:31 2019 Dinko FerencekGeneralActivities on 27. 9. 2019.[LIST]
[*] Today Silvan wire bonded TBMs to the
first batch of 8 new HDIs which were then
  
  17   Thu Sep 26 22:09:14 2019 Dinko FerencekSoftwareDAC configuration updateIn accordance with the agreement made in an
email thread initiated by Danek, the following
changes to DAC settings for ROCs
  
  16   Thu Sep 26 21:48:56 2019 Dinko FerencekModule assemblyCap gluing trainingToday I performed my first cap gluing. As
an exercise it was first done on two dummy
modules and later on a pre-production module
  
  15   Thu Sep 26 17:38:07 2019 Matej RoguljicGeneralActivities 25.-26.9.It was planned to test a batch of HDIs these
2 days but the shipment was late. Dinko and
Andrei were shown the HDI testing procedure.
  
  14   Thu Sep 26 15:51:30 2019 Dinko FerencekSoftwarepXar code updatedpXar code in /home/l_tester/L1_SW/pxar/ on
the lab PC was updated yesterday from [URL=https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0]https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0[/URL]
to the latest version [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL]
  
  13   Thu Sep 19 14:20:07 2019 Matej RoguljicGeneralActivities 10.9.-19.9.2019.[quote="Matej Roguljic"]10.9.
Modules 1504,1505,1520 brought to PSI after
irradiation to 1.2 MGy in Zagreb. All 3 were
  
  12   Thu Sep 19 00:52:24 2019 Dinko FerencekOtherModules 1504, 1505, 1520 irradiation report[quote="Andrey Starodumov"]It was discovered
that these modules were stored in Zagreb
in the climatic lab where T was about +22C.
 ZG-FER_temp_hum_2019.08.16.-09.16.pngpixellab-main-room-1.png 
  11   Wed Sep 18 15:45:45 2019 Matej RoguljicModule assemblyHDI sparking under HV testHDI [B]8010[/B] passed all test except the
HV. Under the HV test, some sparks could
be heard and even seen by eye on the right
 7x 
  10   Fri Sep 13 15:06:51 2019 Andrey StarodumovOtherModules 1504, 1505, 1520 irradiation reportIt was discovered that these modules were
stored in Zagreb in the climatic lab where
T was about +22C. These modules have been
  
  9   Thu Sep 12 10:32:27 2019 Matej RoguljicGeneralActivities 10.9.-19.9.2019.10.9.
Modules 1504,1505,1520 brought to PSI after
irradiation to 1.2 MGy in Zagreb. All 3 were
  
  8   Tue Sep 10 15:18:20 2019 Matej RoguljicOtherModules 1504, 1505, 1520 irradiation reportModules 1504, 1505 and 1520 were taken to
Zagreb for irradiation on 13.08.19. The goal
was to check the v4 behavior after irradiation.
  
  7   Wed Aug 7 18:01:06 2019 Matej RoguljicCold box testsPhOptimization problemAugust 7 - we found out that PhOptimization
algorithm starts leaking memory if it fails
to find proper values. If running one setup,
  
  6   Wed Aug 7 12:24:14 2019 Matej RoguljicDocumentationActivities 31.7.-9.8.2019.31.7.

Matej tested 4 HDIs (8030-8033 and 8010).
  
  5   Wed Aug 7 11:49:07 2019 Matej RoguljicModule assemblyHDI glue irradiation testsSix different glues were used to glue the
cap on six dummy modules. They were all irradiated
to 120 MRad in Zagreb after which they were
 10x 
  4   Tue Aug 6 16:06:45 2019 Matej RoguljicOtherVsh and ctrlreg for v4 chipsThe recommended default value for Vsh is 8,
but the current version of pXar has it as
30. One should remember this when making
  
ELOG V3.1.3-7933898