Matej Roguljic | Software |  Investigating the bug with the Keithley client | We took module 1529 and tried recreating the 
issue observed in the beginning of October. 
To do this in a reasonable amount of time, | 
   | 
| 
  22  
 | 
Sat Oct  5 22:59:58 2019 | 
Dinko Ferencek | Software | Problem with elComandante Keithley client during full qualification | A new attempt to run the full qualification 
for M1532 was made on Friday, Oct. 4, but 
the Keithely client crashed with the same | 
   | 
| 
  21  
 | 
Wed Oct  2 12:50:52 2019 | 
Dinko Ferencek | Software | Problem with elComandante Keithley client during full qualification | Full qualification was attempted for M1532 
on Oct. 1. After the second Fulltest at -20 
C finished, the Keitley client crashed with | 
   | 
| 
  20  
 | 
Wed Oct  2 12:41:16 2019 | 
Dinko Ferencek | Module assembly | First production modules assembled | First production modules (M1530, M1531, M1532) 
were built on Monday, Sep. 30 2019.
 
 | 
 6x   | 
| 
  19  
 | 
Fri Sep 27 23:22:02 2019 | 
Dinko Ferencek | Module assembly | Cap gluing training | Attached are the bump bonding threshold maps 
before and after cap gluing and the (before 
- after) difference for M1522. | 
      | 
| 
  18  
 | 
Fri Sep 27 22:24:31 2019 | 
Dinko Ferencek | General | Activities on 27. 9. 2019. | [LIST]
 
[*] Today Silvan wire bonded TBMs to the 
first batch of 8 new HDIs which were then | 
   | 
| 
  17  
 | 
Thu Sep 26 22:09:14 2019 | 
Dinko Ferencek | Software | DAC configuration update | In accordance with the agreement made in an 
email thread initiated by Danek, the following 
changes to DAC settings for ROCs
 | 
   | 
| 
  16  
 | 
Thu Sep 26 21:48:56 2019 | 
Dinko Ferencek | Module assembly | Cap gluing training | Today I performed my first cap gluing. As 
an exercise it was first done on two dummy 
modules and later on a pre-production module | 
   | 
| 
  15  
 | 
Thu Sep 26 17:38:07 2019 | 
Matej Roguljic | General | Activities 25.-26.9. | It was planned to test a batch of HDIs these 
2 days but the shipment was late. Dinko and 
Andrei were shown the HDI testing procedure. | 
   | 
| 
  14  
 | 
Thu Sep 26 15:51:30 2019 | 
Dinko Ferencek | Software | pXar code updated | pXar code in /home/l_tester/L1_SW/pxar/ on 
the lab PC was updated yesterday from [URL=https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0]https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0[/URL] 
to the latest version [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL] | 
   | 
| 
  13  
 | 
Thu Sep 19 14:20:07 2019 | 
Matej Roguljic | General | Activities 10.9.-19.9.2019. | [quote="Matej Roguljic"]10.9.
 
Modules 1504,1505,1520 brought to PSI after 
irradiation to 1.2 MGy in Zagreb. All 3 were | 
   | 
| 
  12  
 | 
Thu Sep 19 00:52:24 2019 | 
Dinko Ferencek | Other | Modules 1504, 1505, 1520 irradiation report | [quote="Andrey Starodumov"]It was discovered 
that these modules were stored in Zagreb 
in the climatic lab where T was about +22C. | 
     | 
| 
  11  
 | 
Wed Sep 18 15:45:45 2019 | 
Matej Roguljic | Module assembly | HDI sparking under HV test | HDI [B]8010[/B] passed all test except the 
HV. Under the HV test, some sparks could 
be heard and even seen by eye on the right | 
 7x   | 
| 
  10  
 | 
Fri Sep 13 15:06:51 2019 | 
Andrey Starodumov | Other | Modules 1504, 1505, 1520 irradiation report | It was discovered that these modules were 
stored in Zagreb in the climatic lab where 
T was about +22C. These modules have been | 
   | 
| 
  9  
 | 
Thu Sep 12 10:32:27 2019 | 
Matej Roguljic | General | Activities 10.9.-19.9.2019. | 10.9.
 
Modules 1504,1505,1520 brought to PSI after 
irradiation to 1.2 MGy in Zagreb. All 3 were | 
   | 
| 
  8  
 | 
Tue Sep 10 15:18:20 2019 | 
Matej Roguljic | Other | Modules 1504, 1505, 1520 irradiation report | Modules 1504, 1505 and 1520 were taken to 
Zagreb for irradiation on 13.08.19. The goal 
was to check the v4 behavior after irradiation. | 
   | 
| 
  7  
 | 
Wed Aug  7 18:01:06 2019 | 
Matej Roguljic | Cold box tests | PhOptimization problem | August 7 - we found out that PhOptimization 
algorithm starts leaking memory if it fails 
to find proper values. If running one setup, | 
   | 
| 
  6  
 | 
Wed Aug  7 12:24:14 2019 | 
Matej Roguljic | Documentation | Activities 31.7.-9.8.2019. | 31.7.
 
 
Matej tested 4 HDIs (8030-8033 and 8010). | 
   | 
| 
  5  
 | 
Wed Aug  7 11:49:07 2019 | 
Matej Roguljic | Module assembly | HDI glue irradiation tests | Six different glues were used to glue the 
cap on six dummy modules. They were all irradiated 
to 120 MRad in Zagreb after which they were | 
 10x   | 
| 
  4  
 | 
Tue Aug  6 16:06:45 2019 | 
Matej Roguljic | Other | Vsh and ctrlreg for v4 chips | The recommended default value for Vsh is 8, 
but the current version of pXar has it as 