67
|
Thu Feb 6 00:45:25 2020 |
Dinko Ferencek | Cold box tests | Lost at least one Peltier in the coldbox | During an overnight (Feb. 4-5) FullQualification
run with modules 1545, 1547, 1548, and 1549
the coldbox lost the ability to maintain |
|
66
|
Wed Feb 5 16:18:30 2020 |
Dinko Ferencek | Module transfer | Module location tracking added to the assembly spreadsheet | To keep track of the module location, two
columns were added to the module assembly
spreadsheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL] |
|
65
|
Wed Feb 5 16:07:03 2020 |
Dinko Ferencek | Module assembly | Module assembly spreadsheet migrated to Google Sheets | Excel file stored on CERNBox containing the
module assembly spreadsheet has been replaced
with a Google Sheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL]. |
|
64
|
Tue Feb 4 19:52:22 2020 |
Dinko Ferencek | Cold box tests | Blue coldbox setup for reception tests commissioned | Today I continued where Matej left off with
commissioning the blue coldbox setup for
reception tests. All the necessary software |
|
63
|
Tue Feb 4 19:51:10 2020 |
Dinko Ferencek | Module assembly | Cap gluing | Today protective caps have been glued to modules
1545, 1547, 1548, 1549, and 1550. |
|
62
|
Tue Feb 4 19:35:38 2020 |
Dinko Ferencek | Module transfer | 7 modules prepared for transfer to ETH: 1536, 1537, 1538, 1540, 1541, 1542, 1543 | The following modules have been prepared today
for transport to ETH for x-ray qualification:
1536, 1537, 1538, 1540, 1541, 1542, 1543
|
|
61
|
Mon Feb 3 17:09:36 2020 |
Andrey Starodumov | Reception test | 2 modules RT failed: 1544, 1546 | [COLOR=blue]Feb 03[/COLOR]
- RT failed
-- 1544:
|
|
60
|
Mon Feb 3 15:53:32 2020 |
Andrey Starodumov | Reception test | 5 modules RT: 1545, 1547, 1548, 1549, 1550 | [COLOR=blue]Feb 03[/COLOR]
- RT is done and OK for all modules. All
5 modules graded [COLOR=darkgreen]A[/COLOR]. |
|
59
|
Mon Feb 3 15:35:09 2020 |
Anrey Starodumov | Full test | 4 modules FT: 1539, 1541,1542, 1543 | [COLOR=blue]Jan 29[/COLOR]
- Reception test for 1539 OK
- Cap gluing
|
|
58
|
Mon Feb 3 11:28:38 2020 |
Anrey Starodumov | Full test | 4 modules FT: 1536, 1537,1538, 1540 | [COLOR=blue]Jan 28[/COLOR]: Reception test
for 1536, 1537, 1538 OK
Then cap gluing
|
|
57
|
Thu Jan 30 13:51:03 2020 |
Matej Roguljic | Cold box tests | Fulltest failure - psiAgente | During the first fulltest@-20 of the full
qualification procedure for modules: 1539,
1541, 1542 and 1543; an error message popped |
|
56
|
Mon Jan 27 17:50:48 2020 |
Matej Roguljic | Cold box tests | Failing modules at -20 | Friday, 24.1., it was noticed that the modules
are graded as 'C' in similar fashion. Module
is graded A/B at +10 degrees and then graded |
|
55
|
Fri Jan 24 18:22:00 2020 |
Dinko Ferencek | General | L1 replacement web page updated | This week several new links were added to
the main L1 replacement web page located
at the following URL
|
|
54
|
Fri Jan 24 18:16:09 2020 |
Dinko Ferencek | Module assembly | Protective cap gluing | Today I additionally practiced protective
cap gluing by adding a protective cap to
module M1536. |
|
53
|
Fri Jan 24 18:12:00 2020 |
Dinko Ferencek | Software | MoReWeb code updates | MoReWeb code updated to include the ROC wafer
info in the XrayCalibration and XRayHRQualification
pages:
|
|
52
|
Thu Jan 23 15:15:45 2020 |
Dinko Ferencek | Software | Trimming Vcal value changed from 35 to 40 | Trimming Vcal value changed from 35 to 40
in the testParameters.dat files stored in
|
|
51
|
Thu Jan 23 14:54:45 2020 |
Dinko Ferencek | Cold box tests | Keithley exchanged | Yesterday during an attempt to run the FullQualification,
elComandante would lose control over Keithley
after performing the IV curve measurements |
|
50
|
Wed Jan 22 11:50:20 2020 |
Dinko Ferencek | Software | Module configuration files for interactive tests | There are two module configuration folders
set up for elComandante
|
|
49
|
Wed Jan 22 11:39:48 2020 |
Dinko Ferencek | Software | BB2 configuration | When attempting to run the FullQualification
this morning, pXar crashed while running
the BB2 test. After some investigation, we |
|
48
|
Tue Jan 21 12:19:08 2020 |
Dinko Ferencek | Cold box tests | Latest tests of PH optimization | [quote="Dinko Ferencek"]We did some tests
by running the latest version of pXar on
modules M1521, M1529, M1534 and M1536, specifically |
|