23
|
Mon Oct 28 17:01:05 2019 |
Matej Roguljic | Software | Investigating the bug with the Keithley client | We took module 1529 and tried recreating the
issue observed in the beginning of October.
To do this in a reasonable amount of time, |
|
22
|
Sat Oct 5 22:59:58 2019 |
Dinko Ferencek | Software | Problem with elComandante Keithley client during full qualification | A new attempt to run the full qualification
for M1532 was made on Friday, Oct. 4, but
the Keithely client crashed with the same |
|
21
|
Wed Oct 2 12:50:52 2019 |
Dinko Ferencek | Software | Problem with elComandante Keithley client during full qualification | Full qualification was attempted for M1532
on Oct. 1. After the second Fulltest at -20
C finished, the Keitley client crashed with |
|
20
|
Wed Oct 2 12:41:16 2019 |
Dinko Ferencek | Module assembly | First production modules assembled | First production modules (M1530, M1531, M1532)
were built on Monday, Sep. 30 2019.
|
6x |
19
|
Fri Sep 27 23:22:02 2019 |
Dinko Ferencek | Module assembly | Cap gluing training | Attached are the bump bonding threshold maps
before and after cap gluing and the (before
- after) difference for M1522. |
|
18
|
Fri Sep 27 22:24:31 2019 |
Dinko Ferencek | General | Activities on 27. 9. 2019. | [LIST]
[*] Today Silvan wire bonded TBMs to the
first batch of 8 new HDIs which were then |
|
17
|
Thu Sep 26 22:09:14 2019 |
Dinko Ferencek | Software | DAC configuration update | In accordance with the agreement made in an
email thread initiated by Danek, the following
changes to DAC settings for ROCs
|
|
16
|
Thu Sep 26 21:48:56 2019 |
Dinko Ferencek | Module assembly | Cap gluing training | Today I performed my first cap gluing. As
an exercise it was first done on two dummy
modules and later on a pre-production module |
|
15
|
Thu Sep 26 17:38:07 2019 |
Matej Roguljic | General | Activities 25.-26.9. | It was planned to test a batch of HDIs these
2 days but the shipment was late. Dinko and
Andrei were shown the HDI testing procedure. |
|
14
|
Thu Sep 26 15:51:30 2019 |
Dinko Ferencek | Software | pXar code updated | pXar code in /home/l_tester/L1_SW/pxar/ on
the lab PC was updated yesterday from [URL=https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0]https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0[/URL]
to the latest version [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL] |
|
13
|
Thu Sep 19 14:20:07 2019 |
Matej Roguljic | General | Activities 10.9.-19.9.2019. | [quote="Matej Roguljic"]10.9.
Modules 1504,1505,1520 brought to PSI after
irradiation to 1.2 MGy in Zagreb. All 3 were |
|
12
|
Thu Sep 19 00:52:24 2019 |
Dinko Ferencek | Other | Modules 1504, 1505, 1520 irradiation report | [quote="Andrey Starodumov"]It was discovered
that these modules were stored in Zagreb
in the climatic lab where T was about +22C. |
|
11
|
Wed Sep 18 15:45:45 2019 |
Matej Roguljic | Module assembly | HDI sparking under HV test | HDI [B]8010[/B] passed all test except the
HV. Under the HV test, some sparks could
be heard and even seen by eye on the right |
7x |
10
|
Fri Sep 13 15:06:51 2019 |
Andrey Starodumov | Other | Modules 1504, 1505, 1520 irradiation report | It was discovered that these modules were
stored in Zagreb in the climatic lab where
T was about +22C. These modules have been |
|
9
|
Thu Sep 12 10:32:27 2019 |
Matej Roguljic | General | Activities 10.9.-19.9.2019. | 10.9.
Modules 1504,1505,1520 brought to PSI after
irradiation to 1.2 MGy in Zagreb. All 3 were |
|
8
|
Tue Sep 10 15:18:20 2019 |
Matej Roguljic | Other | Modules 1504, 1505, 1520 irradiation report | Modules 1504, 1505 and 1520 were taken to
Zagreb for irradiation on 13.08.19. The goal
was to check the v4 behavior after irradiation. |
|
7
|
Wed Aug 7 18:01:06 2019 |
Matej Roguljic | Cold box tests | PhOptimization problem | August 7 - we found out that PhOptimization
algorithm starts leaking memory if it fails
to find proper values. If running one setup, |
|
6
|
Wed Aug 7 12:24:14 2019 |
Matej Roguljic | Documentation | Activities 31.7.-9.8.2019. | 31.7.
Matej tested 4 HDIs (8030-8033 and 8010). |
|
5
|
Wed Aug 7 11:49:07 2019 |
Matej Roguljic | Module assembly | HDI glue irradiation tests | Six different glues were used to glue the
cap on six dummy modules. They were all irradiated
to 120 MRad in Zagreb after which they were |
10x |
4
|
Tue Aug 6 16:06:45 2019 |
Matej Roguljic | Other | Vsh and ctrlreg for v4 chips | The recommended default value for Vsh is 8,
but the current version of pXar has it as
30. One should remember this when making |
|