CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 11 of 13  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat Feb 8 20:48:11 2020, Dinko Ferencek, Full test, FT for 4 modules: 1550, 1551, 1552, 1553  M1553_C11_AddressDecoding.pdfTemperatureCycle.pdf

[B]1550:[/B] [COLOR=darkblue]B/B/B[/COLOR] (-20/-20/+10). Electrical grade is B due to mean noise >200e for some ROCs. IV: 0.45 uA at +10 C, slope 1.09
[B]1551:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10). Mean noise >200e for some ROCs, dead trimbits in ROC 13, but trimmed Vcal threshold distribution and
Entry  Fri Feb 7 20:35:44 2020, Dinko Ferencek, Full test, FT for 4 modules: 1545, 1547, 1548, 1549 TemperatureCycle.pdf

[B]1545:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10). Problematic ROC 14: mean noise >320e, many dead trimbits, wide trimmed Vcal threshold distribution.
IV: 0.20 uA at +10 C, slope 1.09
Entry  Fri Feb 7 19:40:27 2020, Dinko Ferencek, Reception test, RT for 6 modules: 1557, 1558, 1559, 1560, 1561, 1562  
Reception test is done and all 6 modules were graded [COLOR=darkgreen]A[/COLOR].

Protective caps were glued to 4 modules: 1557, 1558, 1559, 1560
Entry  Thu Feb 6 00:45:25 2020, Dinko Ferencek, Cold box tests, Lost at least one Peltier in the coldbox TemperatureCycle.pdf
During an overnight (Feb. 4-5) FullQualification run with modules 1545, 1547, 1548, and 1549 the coldbox lost the ability to maintain the temperature at
-20 C. As can be seen from the attached temperature log, the problems already started during the temperature cycles where the last 2 cycles were noticeably
longer than the first 3 and finally during the second Fulltests at -20 C the temperature started rising and stabilized around -10 C. Based on these observations
    Reply  Thu Feb 6 17:28:23 2020, Dinko Ferencek, Cold box tests, New Peltiers installed IMG_20200206_144211_resized.jpgIMG_20200206_145330_resized.jpgIMG_20200206_155320_resized.jpg
Today new Peltiers were installed and tested. Unfortunately, we had trouble reaching -20 C with this new set of Peltiers (they are of different type than
the ones that were taken out). After better insulation ofthe sample compartment and lowering the chiller temperature from 11 to 6 C, the coldbox was able
to reach close to -19.8 C after about half an hour
Entry  Thu Feb 6 17:19:12 2020, Dinko Ferencek, Reception test, RT for 6 modules: 1551, 1552, 1553, 1554, 1555, 1556 
Today reception test was run for 6 modules and looks OK for all module. The modules were graded as follows:

1551: [COLOR=darkgreen]A[/COLOR]
Entry  Thu Feb 6 17:09:50 2020, Dinko Ferencek, Module assembly, Gluing stamp improvements 
Silvan has made additional grooves on the gluing stamp which now sits stably on top of the module without any rocking motion and also allows better glue
distribution to all the HDI components that are supposed to receive the glue.
Entry  Wed Feb 5 16:18:30 2020, Dinko Ferencek, Module transfer, Module location tracking added to the assembly spreadsheet 
To keep track of the module location, two columns were added to the module assembly spreadsheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL]
that contain the dates when a given module is shipped to ETHZ and when it is returned to PSI.
Entry  Wed Feb 5 16:07:03 2020, Dinko Ferencek, Module assembly, Module assembly spreadsheet migrated to Google Sheets 
Excel file stored on CERNBox containing the module assembly spreadsheet has been replaced with a Google Sheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL].
This change should make common editing of the spreadsheet easier.
Entry  Tue Feb 4 19:52:22 2020, Dinko Ferencek, Cold box tests, Blue coldbox setup for reception tests commissioned 
Today I continued where Matej left off with commissioning the blue coldbox setup for reception tests. All the necessary software (pXar and elComandante)
Matej already installed (just had to add the BB2 section in testParameters.dat). What was a problem in communication with Keithley (Model 2400) which was
fixed after changing the BAUD rate in elComandante/keithleyClient/keithleyInterface.py to 19200 (value set in Keithley's communications settings) and changing
Entry  Tue Feb 4 19:51:10 2020, Dinko Ferencek, Module assembly, Cap gluing 
Today protective caps have been glued to modules 1545, 1547, 1548, 1549, and 1550.
Entry  Tue Feb 4 19:35:38 2020, Dinko Ferencek, Module transfer, 7 modules prepared for transfer to ETH: 1536, 1537, 1538, 1540, 1541, 1542, 1543 
The following modules have been prepared today for transport to ETH for x-ray qualification:
1536, 1537, 1538, 1540, 1541, 1542, 1543
Entry  Mon Feb 3 17:09:36 2020, Andrey Starodumov, Reception test, 2 modules RT failed: 1544, 1546 
[COLOR=blue]Feb 03[/COLOR]
- RT failed
-- 1544: 
Entry  Mon Feb 3 15:53:32 2020, Andrey Starodumov, Reception test, 5 modules RT: 1545, 1547, 1548, 1549, 1550 
[COLOR=blue]Feb 03[/COLOR]
- RT is done and OK for all modules. All 5 modules graded [COLOR=darkgreen]A[/COLOR].
Entry  Mon Feb 3 15:35:09 2020, Anrey Starodumov, Full test, 4 modules FT: 1539, 1541,1542, 1543 1542ROC13-TrThr.pdf
[COLOR=blue]Jan 29[/COLOR] 
- Reception test for 1539 OK
- Cap gluing
Entry  Mon Feb 3 11:28:38 2020, Anrey Starodumov, Full test, 4 modules FT: 1536, 1537,1538, 1540 1537ROC10m20-TrThr.pdf
[COLOR=blue]Jan 28[/COLOR]: Reception test for 1536, 1537, 1538 OK
Then cap gluing
[COLOR=blue]Jan 29[/COLOR]
Entry  Thu Jan 30 13:51:03 2020, Matej Roguljic, Cold box tests, Fulltest failure - psiAgente 
During the first fulltest@-20 of the full qualification procedure for modules: 1539, 1541, 1542 and 1543; an error message popped up "psi Agente: self.Testboards[0]
failed - the following boards are busy: TB1(DTB...:M1541), TB2(DTB...:M1542), TB3(DTB...:M1543). This means that the first fulltest for module 1539 was
not executed.
Entry  Mon Jan 27 17:50:48 2020, Matej Roguljic, Cold box tests, Failing modules at -20 
Friday, 24.1., it was noticed that the modules are graded as 'C' in similar fashion. Module is graded A/B at +10 degrees and then graded C at -20. The reason
for grade C was that the trimming procedure was not successful on at least one of the ROCs on each module. This problem was further investigated on 27.1.
Wolfram suspected that the problem lies in zero suppression mode since the pixels with failed threshold comes in groups of four pixels. The corresponding
Entry  Fri Jan 24 18:22:00 2020, Dinko Ferencek, General, L1 replacement web page updated 
This week several new links were added to the main L1 replacement web page located at the following URL
[URL=http://cms.web.psi.ch/L1Replacement/]http://cms.web.psi.ch/L1Replacement/[/URL]
Entry  Fri Jan 24 18:16:09 2020, Dinko Ferencek, Module assembly, Protective cap gluing 
Today I additionally practiced protective cap gluing by adding a protective cap to module M1536.
Entry  Fri Jan 24 18:12:00 2020, Dinko Ferencek, Software, MoReWeb code updates 
MoReWeb code updated to include the ROC wafer info in the XrayCalibration and XRayHRQualification pages:
[URL=https://gitlab.cern.ch/CMS-IRB/MoReWeb/commit/4de8ea39050600367ae0b8e959fcc00f29be45d8]https://gitlab.cern.ch/CMS-IRB/MoReWeb/commit/4de8ea39050600367ae0b8e959fcc00f29be45d8[/URL]
ELOG V3.1.3-7933898