  55   Fri Jan 24 18:22:00 2020 Dinko FerencekGeneralL1 replacement web page updatedThis week several new links were added to
the main L1 replacement web page located
at the following URL
  
  113   Wed Mar 18 15:23:27 2020 Andrey StarodumovGeneralNew rules at PSIFrom today only two persons from the group
allowed to be present. We are working in
shifts: Urs in the morning start full qualification
  
  212   Tue Apr 14 17:29:46 2020 Andrey StarodumovGeneralROC4 or ROC12 defectsStarting from M1650 almost every module has
a cluster of dead pixels or broken bump bonds
on
  
  222   Tue Apr 21 15:34:57 2020 Andrey StarodumovGeneralRetesting starts todayFrom today we will retest modules that have
been tested with pXar SW versions earlier
than March 18.
  
  249   Mon May 4 15:28:14 2020 Andrey StarodumovGeneralM1660 M1660 is taken from gel-pak and cabled for
retest.
This module was graded C only at second FT
  
  280   Fri May 29 15:41:40 2020 Andrey StarodumovGeneralM1546ROC10 of M1546 has 107 pixels with trimming
problems:
in a VCal threshold scan after trimming 81
 C10-p10.pdfTrimBits.pdfC10-50.pdf 
  286   Fri Jun 5 16:22:19 2020 Andrey StarodumovGeneralCleaning L1_DATA directoryTo be able to analyse Xray data and keep Total
Production overview in a proper state we
need to clean L1_DATA directory.
  
  293   Sun Jul 5 13:20:55 2020 Dinko FerencekGeneralDisk cleanup on the lab PC (pc11366.psi.ch)Home folder was cleaned up by deleting old
pXar output .log and .root files. The full
list is in the attached file. This released
 pxar_junk_home.txt 
  296   Fri Aug 14 13:47:26 2020 Andrey StarodumovGeneralnew PH optimisation test and Total OverviewNew PH optimisation is done at -20C as a FT,
hence the results of this test are added
to "DB" file as the second m20_1 test.
  
  34   Wed Nov 20 16:53:50 2019 Andrey Full testM1533 and M1534 FullQualificationFullQualification of two modules M1533 and
M1534 has been done. Full time of the test
is about 7hrs.
  
  43   Mon Dec 2 17:29:06 2019 Andrey StarodumovFull test4 modules FTFullQualification of four modules M1526, M1529,
M1521 and M1534 has been done. Full time
of the test is about 5.5hrs.
  
  44   Tue Dec 3 12:15:54 2019 Andrey StarodumovFull test4 modules FT[quote="Andrey Starodumov"]FullQualification
of four modules M1526, M1529, M1521 and M1534
has been done. Full time of the test is about
 M1526ATm20.pngM1526ATp10.png 
  58   Mon Feb 3 11:28:38 2020 Anrey StarodumovFull test4 modules FT: 1536, 1537,1538, 1540[COLOR=blue]Jan 28[/COLOR]: Reception test
for 1536, 1537, 1538 OK
Then cap gluing
 1537ROC10m20-TrThr.pdf 
  59   Mon Feb 3 15:35:09 2020 Anrey StarodumovFull test4 modules FT: 1539, 1541,1542, 1543[COLOR=blue]Jan 29[/COLOR] 
- Reception test for 1539 OK
- Cap gluing
 1542ROC13-TrThr.pdf 
  72   Fri Feb 7 20:35:44 2020 Dinko FerencekFull testFT for 4 modules: 1545, 1547, 1548, 1549
[B]1545:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10).
Problematic ROC 14: mean noise >320e, many
 TemperatureCycle.pdf 
  73   Sat Feb 8 20:48:11 2020 Dinko FerencekFull testFT for 4 modules: 1550, 1551, 1552, 1553
[B]1550:[/B] [COLOR=darkblue]B/B/B[/COLOR]
(-20/-20/+10). Electrical grade is B due
 M1553_C11_AddressDecoding.pdfTemperatureCycle.pdf 
  74   Sun Feb 9 10:52:17 2020 Dinko FerencekFull testFT for 4 modules: 1539, 1554, 1555, 1556
[B]1539:[/B] [COLOR=darkblue]B/B/B[/COLOR]
(-20/-20/+10). Electrical grade is B due
  
  77   Sun Feb 9 19:34:55 2020 Dinko FerencekFull testFT for 4 modules: 1557, 1558, 1559, 1560
[B]1557:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10).
Mean noise >200e for some ROCs, dead trimbits,
  
  84   Fri Feb 14 09:48:27 2020 Dinko FerencekFull testFT for 12 modules: 1561-1576 (1563, 1567, 1572, 1575 excluded)[COLOR=blue]Feb. 11[/COLOR]

[B]1561:[/B] [COLOR=red]C/[/COLOR][COLOR=darkblue]B/B[/COLOR]
  
  90   Wed Feb 26 10:34:55 2020 Urs LangeneggerFull testFulltest after Peltier replacementOn 2020/02/25, after SIlvan had replaced the
Peltiers, I did a fulltest. Here the summary:
  