CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 14 of 16  Not logged in ELOG logo
ID Datedown Author Category Subject Text Attachments
  47   Mon Jan 20 21:33:20 2020 Dinko FerencekCold box testsLatest tests of PH optimizationWe did some tests by running the latest version
of pXar on modules M1521, M1529, M1534 and
M1536, specifically trimming and PH optimization.
 TrimBitTest_old.pngTrimBitTest_new.png 
  46   Mon Jan 20 18:09:50 2020 Matej RoguljicGeneralActivities 20.-31.01.2020.20.01.

Expanded the HDI testing setup to be able
  
  45   Mon Jan 20 13:47:33 2020 Dinko FerencekSoftwarepXar code updated[quote="Dinko Ferencek"][quote="Dinko Ferencek"]pXar
code in /home/l_tester/L1_SW/pxar/ on the
lab PC was updated on Monday, Nov. 25 from
  
  44   Tue Dec 3 12:15:54 2019 Andrey StarodumovFull test4 modules FT[quote="Andrey Starodumov"]FullQualification
of four modules M1526, M1529, M1521 and M1534
has been done. Full time of the test is about
 M1526ATm20.pngM1526ATp10.png 
  43   Mon Dec 2 17:29:06 2019 Andrey StarodumovFull test4 modules FTFullQualification of four modules M1526, M1529,
M1521 and M1534 has been done. Full time
of the test is about 5.5hrs.
  
  42   Fri Nov 29 17:06:26 2019 Dinko FerencekGeneralDropbox folder on CERNBox set upA dropbox folder for elComandante tar files
was set up in my CERNBox and synchronized
with the following local folder on the lab
  
  41   Thu Nov 28 18:58:30 2019 Dinko FerencekSoftwareUpdated Fulltest configurationThe Fulltest definition used on the lab PC
and stored in /home/l_tester/L1_SW/elComandante/config/tests/Fulltest
had the following content
  
  40   Thu Nov 28 18:34:00 2019 Dinko FerencekSoftwarepXar code updated[quote="Dinko Ferencek"]pXar code in /home/l_tester/L1_SW/pxar/
on the lab PC was updated on Monday, Nov.
25 from [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL]
  
  39   Thu Nov 28 18:23:31 2019 Dinko FerencekSoftwareReorganized pXar configuration files for pixel modules[quote="Dinko Ferencek"]Due to different DAC
settings needed for PROC V3 and V4, a single
folder containing module configuration files
  
  38   Thu Nov 28 15:58:20 2019 Matej RoguljicGeneralActivities 26.-29.11.2019.26.11.

Prepared the tools for RD53A digital module
 1-1.jpg1-2.jpg1-3.jpg1-4.jpg 
  37   Wed Nov 27 21:50:02 2019 Dinko FerencekSoftwareReorganized pXar configuration files for pixel modulesDue to different DAC settings needed for PROC
V3 and V4, a single folder containing module
configuration files cannot cover both ROC
  
  36   Wed Nov 27 18:25:08 2019 Dinko FerencekSoftwarepXar code updatedpXar code in /home/l_tester/L1_SW/pxar/ on
the lab PC was updated on Monday, Nov. 25
from [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL]
  
  35   Wed Nov 27 08:39:24 2019 Matej RoguljicCold box testsBump bonding test investigationThe BB test on M1534 shows a lot of dead bunmps
on C10 and some on C1 and C0 as well. Putting
a source on top of the module shows that
  
  34   Wed Nov 20 16:53:50 2019 Andrey Full testM1533 and M1534 FullQualificationFullQualification of two modules M1533 and
M1534 has been done. Full time of the test
is about 7hrs.
  
  33   Tue Nov 19 14:10:10 2019 Andrey Cold box testsnew modules M1533 and M1534Yesterday Silvan wire bonded two new modules
M1533 and M1534 that are both grade C due
to high leakage current and a few ROCs with
  
  31   Thu Oct 31 10:41:12 2019 Matej RoguljicCold box testsIssue with DTB_WWVASWOn 29th of October, an issue with DTB_WWVASW
was noticed when trying to run FullQualification
on 4 modules at the same time. On a tested,
  
  30   Wed Oct 30 16:54:58 2019 Matej RoguljicSoftware Investigating the bug with the Keithley client[quote="Matej Roguljic"][quote="Matej Roguljic"]We
took module 1529 and tried recreating the
issue observed in the beginning of October.
  
  27   Wed Oct 30 10:38:04 2019 Matej RoguljicGeneralActivities 28.-31.10.2019.28.10. - Investigated a problem with the FullQualification
setup, described more in this [URL=https://elrond.irb.hr/elog/Layer+1+Replacement/23]note[/URL]
29.10. - Further investigated the aforementioned
  
  26   Tue Oct 29 16:38:32 2019 Matej RoguljicSoftware Investigating the bug with the Keithley client[quote="Matej Roguljic"]We took module 1529
and tried recreating the issue observed in
the beginning of October. To do this in a
  
  25   Tue Oct 29 16:36:23 2019 Matej RoguljicModule assemblyAssembly lab cap gluing jigsThere are two jigs for cap gluing in the assembly
lab, circled in red and blue on the photo
in the attachment. The one closer to the
 IMG_20191029_150037.jpg 
ELOG V3.1.3-7933898