CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 5 of 16  Not logged in ELOG logo
ID Date Author Categorydown Subject Text Attachments
  204   Thu Apr 9 14:49:07 2020 Andrey StarodumovReception testRT of M1650 failedModule has been tested on April 2nd.
Under Molex connector in ROC12 471 dead or
noisy pixels.
  
  207   Thu Apr 9 17:36:31 2020 Andrey StarodumovReception testRT of M1671 failedROC12-ROC15 no hits.
A candidate to TBM0 substitution, hence Grade
C*.
  
  209   Tue Apr 14 15:49:05 2020 Andrey StarodumovReception testRT of M1623, M1657, M1673, M1674M1623: Grade A, should be B due to 71 bump
defects in ROC4 
M1657: Grade B, due to 51 dead pixels in
  
  220   Mon Apr 20 15:20:07 2020 Andrey StarodumovReception testChange TBMs on M1635, M1653, M1671[quote="Andrey Starodumov"]M1635: no data
from ROC8-ROC11 => change TBM1
M1653: ROC12-ROC15 not programmable => change
  
  294   Fri Jul 10 11:24:37 2020 Urs LangeneggerReception testproc600V3 modulesThis week I tested 12 modules built with proc600v3.
The module numbers are M1722 - M1733. 
The results are summarized at the usual place:
  
  95   Tue Mar 3 14:05:13 2020 Andrey StarodumovRe-gradingRegrading C modules: due to NoiseIt has been realized by Urs that VCal to electron
conversion used by MoreWeb is still 50e/VCal.
While recent calibration done by Maren with
  
  97   Wed Mar 4 16:00:05 2020 Andrey StarodumovRe-gradingRegrading C M1591: due to Noise[quote="Andrey Starodumov"]It has been realized
by Urs that VCal to electron conversion used
by MoreWeb is still 50e/VCal.
  
  103   Wed Mar 11 17:59:48 2020 Andrey StarodumovRe-gradingRegrading C M1542: due to NoiseFollow the instruction from M1591 regrading
log:
"To correct the Summary page one needs to
  
  132   Tue Mar 24 18:11:52 2020 Andrey StarodumovRe-gradingReanalised test resultsTest resulsts of several modules have been
re-analised without grading on trimbit failure.
  
  139   Wed Mar 25 18:31:46 2020 Andrey StarodumovRe-gradingReanalised test results[quote="Andrey Starodumov"]Test resulsts of
several modules have been re-analised without
grading on trimbit failure. 
  
  278   Fri May 29 13:56:35 2020 Andrey StarodumovRe-gradingM1630In ROC1 of M1630 gain calibration failed massively
(3883 pixels) at +10C with CtrlReg 9.
A special test of M1630 only at +10C and
  
  109   Mon Mar 16 11:04:41 2020 Matej RoguljicPhQualificationPhQualification 14.-15.3.I ran PhQualification over the weekend with
changes pulled from git (described here https://elrond.irb.hr/elog/Layer+1+Replacement/108).
  
  111   Mon Mar 16 15:20:03 2020 Matej RoguljicPhQualificationPhQualification on 16.3.PhQualification was run on modules M1561,
M1564, M1565, M1566. 
  
  295   Wed Jul 29 17:19:43 2020 danek kotlinskiPhQualificationChange configuration for PH qialificationPreparing the new PH optimization I had to
make the following modifications:
  
  298   Fri Aug 28 11:53:23 2020 Andrey StarodumovPhQualificationM1555There is no new PH optimisation for this module?!
To be checked!
  
  300   Fri Aug 28 14:07:24 2020 Andrey StarodumovPhQualificationM1539There is no new PH optimisation for this module?!
To be checked!
  
  302   Sat Sep 12 23:45:56 2020 Dinko FerencekPOSPOS configuration files createdpXar parameter files were converted to POS
configuration files by executing the following
commands on the lab PC at PSI
  
  305   Fri Nov 6 07:28:42 2020 danek kotlinskiPOSPOS configuration files created[quote="Dinko Ferencek"]pXar parameter files
were converted to POS configuration files
by executing the following commands on the
  
  306   Tue Nov 10 00:50:47 2020 Dinko FerencekPOSPOS configuration files created[quote="danek kotlinski "][quote="Dinko Ferencek"]pXar
parameter files were converted to POS configuration
files by executing the following commands
  
  308   Tue Jan 19 15:12:12 2021 Dinko FerencekPOSPOS configuration files createdM1560 in position bpi_sec1_lyr1_ldr1_mod3
was replaced by M1613.
  
ELOG V3.1.3-7933898