  64   Tue Feb 4 19:52:22 2020 Dinko FerencekCold box testsBlue coldbox setup for reception tests commissionedToday I continued where Matej left off with
commissioning the blue coldbox setup for
reception tests. All the necessary software
  
  65   Wed Feb 5 16:07:03 2020 Dinko FerencekModule assemblyModule assembly spreadsheet migrated to Google SheetsExcel file stored on CERNBox containing the
module assembly spreadsheet has been replaced
with a Google Sheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL].
  
  66   Wed Feb 5 16:18:30 2020 Dinko FerencekModule transferModule location tracking added to the assembly spreadsheetTo keep track of the module location, two
columns were added to the module assembly
spreadsheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL]
  
  67   Thu Feb 6 00:45:25 2020 Dinko FerencekCold box testsLost at least one Peltier in the coldboxDuring an overnight (Feb. 4-5) FullQualification
run with modules 1545, 1547, 1548, and 1549
the coldbox lost the ability to maintain
 TemperatureCycle.pdf 
  68   Thu Feb 6 17:09:50 2020 Dinko FerencekModule assemblyGluing stamp improvementsSilvan has made additional grooves on the
gluing stamp which now sits stably on top
of the module without any rocking motion
  
  69   Thu Feb 6 17:19:12 2020 Dinko FerencekReception testRT for 6 modules: 1551, 1552, 1553, 1554, 1555, 1556Today reception test was run for 6 modules
and looks OK for all module. The modules
were graded as follows:
  
  70   Thu Feb 6 17:28:23 2020 Dinko FerencekCold box testsNew Peltiers installedToday new Peltiers were installed and tested.
Unfortunately, we had trouble reaching -20
C with this new set of Peltiers (they are
 IMG_20200206_144211_resized.jpgIMG_20200206_145330_resized.jpgIMG_20200206_155320_resized.jpg 
  71   Fri Feb 7 19:40:27 2020 Dinko FerencekReception testRT for 6 modules: 1557, 1558, 1559, 1560, 1561, 1562 Reception test is done and all 6 modules were
graded [COLOR=darkgreen]A[/COLOR].
  
  72   Fri Feb 7 20:35:44 2020 Dinko FerencekFull testFT for 4 modules: 1545, 1547, 1548, 1549
[B]1545:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10).
Problematic ROC 14: mean noise >320e, many
 TemperatureCycle.pdf 
  73   Sat Feb 8 20:48:11 2020 Dinko FerencekFull testFT for 4 modules: 1550, 1551, 1552, 1553
[B]1550:[/B] [COLOR=darkblue]B/B/B[/COLOR]
(-20/-20/+10). Electrical grade is B due
 M1553_C11_AddressDecoding.pdfTemperatureCycle.pdf 
  74   Sun Feb 9 10:52:17 2020 Dinko FerencekFull testFT for 4 modules: 1539, 1554, 1555, 1556
[B]1539:[/B] [COLOR=darkblue]B/B/B[/COLOR]
(-20/-20/+10). Electrical grade is B due
  
  75   Sun Feb 9 12:05:47 2020 Dinko FerencekModule assemblyCap gluingToday protective caps have been glued to modules
1561 and 1562.
  
  76   Sun Feb 9 18:36:13 2020 Dinko FerencekModule gradingManual gradingThe procedure for manual grading is described
in [URL=https://github.com/psi46/MoReWeb/pull/120]https://github.com/psi46/MoReWeb/pull/120[/URL].
  
  77   Sun Feb 9 19:34:55 2020 Dinko FerencekFull testFT for 4 modules: 1557, 1558, 1559, 1560
[B]1557:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10).
Mean noise >200e for some ROCs, dead trimbits,
  
  78   Tue Feb 11 10:25:32 2020 Dinko FerencekReception testRT for 6 modules: 1563, 1564, 1565, 1566, 1567, 1568[COLOR=blue]Feb. 10[/COLOR]

[B]1563:[/B] Grade [COLOR=red]C[/COLOR],
  
  79   Tue Feb 11 17:56:06 2020 Dinko FerencekCold box testsFulltest failure - psiAgenteDuring today's full qualification the 2nd
fulltest@-20 for TB1 (M1562) failed
  
  80   Wed Feb 12 10:43:04 2020 Dinko FerencekModule transfer9 modules sent to ETH: 1539, 1545, 1547, 1548, 1549, 1550, 1551, 1552, 1553Yesterday the following modules were sent
to ETH:
1539, 1545, 1547, 1548, 1549, 1550, 1551,
  
  81   Wed Feb 12 11:15:04 2020 Dinko FerencekModule gradingProblem with dead trimbits understoodIt was noticed that some modules are graded
[COLOR=red]C[/COLOR] because of typically
just one ROC having a large number of dead
 14x 
  82   Wed Feb 12 15:40:13 2020 Dinko FerencekReception testRT for 3 modules: 1569, 1570, 1571; 1572 bad[B]1569:[/B] Grade [COLOR=darkgreen]A[/COLOR]
[B]1570:[/B] Grade [COLOR=darkgreen]A[/COLOR]
[B]1571:[/B] Grade [COLOR=darkblue]B[/COLOR],
  
  83   Thu Feb 13 21:44:28 2020 Dinko FerencekReception testRT for 6 modules: 1573, 1574, 1575, 1576, 1577, 1578[B]1573:[/B] Grade [COLOR=darkgreen]A[/COLOR]
[B]1574:[/B] Grade [COLOR=darkblue]B[/COLOR],
I(150)/I(100) > 2 (4.63)
  