295
|
Wed Jul 29 17:19:43 2020 |
danek kotlinski | PhQualification | Change configuration for PH qialification | Preparing the new PH optimization I had to
make the following modifications:
|
|
304
|
Fri Oct 23 13:33:04 2020 |
danek kotlinski | Module transfer | L1 & L2 modules to go to P5 | The following modules will be transported
to CERN/P5 as spares.
|
|
305
|
Fri Nov 6 07:28:42 2020 |
danek kotlinski | POS | POS configuration files created | [quote="Dinko Ferencek"]pXar parameter files
were converted to POS configuration files
by executing the following commands on the |
|
87
|
Mon Feb 24 13:53:32 2020 |
Urs Langenegger | Module assembly | Setup changes in week 8 | Setup changes in week 8
Silvan considered the single-module gluing |
|
88
|
Mon Feb 24 14:01:29 2020 |
Urs Langenegger | Module assembly | Cap gluing in W8 | In week 8 the following modules were glued
and tested:
|
|
89
|
Tue Feb 25 17:11:18 2020 |
Urs Langenegger | Module assembly | Modules glued and tested Feb 24/25 | Modules glued and tested Feb 24/25
The letters after the module name indicate |
|
90
|
Wed Feb 26 10:34:55 2020 |
Urs Langenegger | Full test | Fulltest after Peltier replacement | On 2020/02/25, after SIlvan had replaced the
Peltiers, I did a fulltest. Here the summary:
|
|
91
|
Thu Feb 27 09:47:51 2020 |
Urs Langenegger | Full test | Fulltest on 2020/02/26 | On Wednesday, 2020/02/26 the following modules
went through the full qualification procedure:
|
|
93
|
Fri Feb 28 17:33:16 2020 |
Urs Langenegger | Full test | Fulltests on 2020/02/28 | M1589 B
M1590 C (gain issues?)
M1591 C (noise issues?)
|
|
94
|
Mon Mar 2 17:39:36 2020 |
Urs Langenegger | Full test | Fulltests on 2020/03/02 | Modules tested:
M1595 C
M1596 B
|
|
99
|
Wed Mar 11 15:34:57 2020 |
Urs Langenegger | Other | M1586: issues with MOLEX? | Module M1586 had passed the full qualification
on 20/02/27. I had had to re-insert the cable
in the Molex connector for it to become programmable. |
|
147
|
Fri Mar 27 10:54:04 2020 |
Urs Langenegger | Full test | Issues with pc11366 on March 27 | On March 27 I had a lot of troubles getting
the full qualification up
and running.
|
|
163
|
Tue Mar 31 09:29:02 2020 |
Urs Langenegger | Full test | exchanged adapter for DTB_WXC03A | I did not manage to get any r/o from the module
connected to that adapter, also after exchanging
the module.
|
|
164
|
Tue Mar 31 10:32:32 2020 |
Urs Langenegger | Full test | M1637 | Maybe M1637 has an issue: It got stuck twice
at the same place with
|
|
167
|
Tue Mar 31 17:36:36 2020 |
Urs Langenegger | Full test | exchanged adapter for DTB_WXC03A | [quote="Urs Langenegger"]I did not manage
to get any r/o from the module connected
to that adapter, also after exchanging the |
|
237
|
Wed Apr 29 08:48:06 2020 |
Urs Langenegger | Other | M1539 | M1539 showed no readout. I tried, all without
success,
- reconnecting the cable to the adapter multiple |
|
294
|
Fri Jul 10 11:24:37 2020 |
Urs Langenegger | Reception test | proc600V3 modules | This week I tested 12 modules built with proc600v3.
The module numbers are M1722 - M1733.
The results are summarized at the usual place: |
|
143
|
Thu Mar 26 15:37:18 2020 |
Urs | Module grading | M1606 | attached find the threshold difference distributions
for all four trimbits for all ROCs |
|
157
|
Mon Mar 30 15:40:52 2020 |
Urs | Full test | FT of M1629, M1630, M1631, M1632 | M1630 is interesting because (I am using my
terminology in the following) for the test
at T=+10C ROC1 fails the PH optimization |
|
2
|
Tue Aug 6 15:15:00 2019 |
Matej Roguljic | General | Activities 19.6.-4.7.2019. | 17.6.-21.6.
Andrei and Matej were at PSI working on the |
|