Wed Jul 29 17:19:43 2020, danek kotlinski, PhQualification, Change configuration for PH qialification
|
Preparing the new PH optimization I had to make the following modifications:
1) in elCommandante.ini
|
Fri Oct 23 13:33:04 2020, danek kotlinski, Module transfer, L1 & L2 modules to go to P5
|
The following modules will be transported to CERN/P5 as spares.
1) L1
|
Fri Nov 6 07:28:42 2020, danek kotlinski, POS, POS configuration files created
|
[quote="Dinko Ferencek"]pXar parameter files were converted to POS configuration files by executing the following commands on the lab PC at PSI
cd /home/l_tester/L1_SW/MoReWeb/scripts/
|
Mon Feb 24 13:53:32 2020, Urs Langenegger, Module assembly, Setup changes in week 8
|
Setup changes in week 8
Silvan considered the single-module gluing approach suboptimal. It was changed:
|
Mon Feb 24 14:01:29 2020, Urs Langenegger, Module assembly, Cap gluing in W8
|
In week 8 the following modules were glued and tested:
M1581
|
Tue Feb 25 17:11:18 2020, Urs Langenegger, Module assembly, Modules glued and tested Feb 24/25
|
Modules glued and tested Feb 24/25
The letters after the module name indicate the reception test grade.
|
Wed Feb 26 10:34:55 2020, Urs Langenegger, Full test, Fulltest after Peltier replacement
|
On 2020/02/25, after SIlvan had replaced the Peltiers, I did a fulltest. Here the summary:
Finished all tests. Summary of test durations:
|
Thu Feb 27 09:47:51 2020, Urs Langenegger, Full test, Fulltest on 2020/02/26
|
On Wednesday, 2020/02/26 the following modules went through the full qualification procedure:
M1581
M1582
|
Fri Feb 28 17:33:16 2020, Urs Langenegger, Full test, Fulltests on 2020/02/28
|
M1589 B
M1590 C (gain issues?)
M1591 C (noise issues?)
|
Mon Mar 2 17:39:36 2020, Urs Langenegger, Full test, Fulltests on 2020/03/02
|
Modules tested:
M1595 C
M1596 B
|
Wed Mar 11 15:34:57 2020, Urs Langenegger, Other, M1586: issues with MOLEX?
|
Module M1586 had passed the full qualification on 20/02/27. I had had to re-insert the cable in the Molex connector for it to become programmable.
On 2020/03/09, I tried to re-test M1586, but it was not programmable. Visual inspection revealed nothing to me. I did re-insert the cable once again, but |
Fri Mar 27 10:54:04 2020, Urs Langenegger, Full test, Issues with pc11366 on March 27
|
On March 27 I had a lot of troubles getting the full qualification up
and running.
|
Tue Mar 31 09:29:02 2020, Urs Langenegger, Full test, exchanged adapter for DTB_WXC03A
|
I did not manage to get any r/o from the module connected to that adapter, also after exchanging the module.
So I exchanged the module adapter with the one from the blue box, and all issues with r/o were gone (with both modules)
|
Tue Mar 31 10:32:32 2020, Urs Langenegger, Full test, M1637
|
Maybe M1637 has an issue: It got stuck twice at the same place with
[09:53:16.043] <TB0> INFO: PixTestReadback::CalibrateIa()
|
Tue Mar 31 17:36:36 2020, Urs Langenegger, Full test, exchanged adapter for DTB_WXC03A
|
[quote="Urs Langenegger"]I did not manage to get any r/o from the module connected to that adapter, also after exchanging the module.
So I exchanged the module adapter with the one from the blue box, and all issues with r/o were gone (with both modules)
|
Wed Apr 29 08:48:06 2020, Urs Langenegger, Other, M1539
|
M1539 showed no readout. I tried, all without success,
- reconnecting the cable to the adapter multiple times
- connecting to the adapter in the blue box
|
Fri Jul 10 11:24:37 2020, Urs Langenegger, Reception test, proc600V3 modules
|
This week I tested 12 modules built with proc600v3. The module numbers are M1722 - M1733.
The results are summarized at the usual place:
http://cms.web.psi.ch/L1Replacement/WebOutput/MoReWeb/Overview/Overview.html
|
Thu Mar 26 15:37:18 2020, Urs, Module grading, M1606
|
attached find the threshold difference distributions for all four trimbits for all ROCs |
Mon Mar 30 15:40:52 2020, Urs, Full test, FT of M1629, M1630, M1631, M1632
|
M1630 is interesting because (I am using my terminology in the following) for the test at T=+10C ROC1 fails the PH optimization test and by consequence
the gain/pedestal test is also failed.
|
Tue Aug 6 15:15:00 2019, Matej Roguljic, General, Activities 19.6.-4.7.2019.
|
17.6.-21.6.
Andrei and Matej were at PSI working on the cap gluing setup
|