CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 5 of 16  Not logged in ELOG logo
    Reply  Thu Feb 6 17:28:23 2020, Dinko Ferencek, Cold box tests, New Peltiers installed IMG_20200206_144211_resized.jpgIMG_20200206_145330_resized.jpgIMG_20200206_155320_resized.jpg
Today new Peltiers were installed and tested. Unfortunately, we had trouble reaching -20 C with this new set of Peltiers (they are of different type than
the ones that were taken out). After better insulation ofthe sample compartment and lowering the chiller temperature from 11 to 6 C, the coldbox was able
to reach close to -19.8 C after about half an hour
Entry  Thu Jun 18 20:04:41 2020, danek kotlinski, Module transfer, Modules to ETH, transport #6 
Today Lea has delivered another group of 18 modules to the ETH:
1604
1603
Entry  Thu Apr 9 14:19:40 2020, danek kotlinski, Module transfer, Modules moved to gel-pack 
The following good module class A/B have been moved to gel-packs:
1607, 1608, 1609, 1610, 1612, 1613, 1614, 1618, 1619, 1620, 1622, 1624, 1626, 1627, 1628.
    Reply  Thu Apr 9 16:13:51 2020, danek kotlinski, Module transfer, Modules moved to gel-pack 
[quote="danek kotlinski"]The following good module class A/B have been moved to gel-packs:
1607, 1608, 1609, 1610, 1612, 1613, 1614, 1618, 1619, 1620, 1622, 1624, 1626, 1627, 1628.
Entry  Tue Feb 25 17:11:18 2020, Urs Langenegger, Module assembly, Modules glued and tested Feb 24/25 
Modules glued and tested Feb 24/25

The letters after the module name indicate the reception test grade. 
Entry  Sun Mar 29 18:14:59 2020, danek kotlinski, Other, Modules 1544 & 1563 in gelpack 
The 2 bad modules:
M1544
M1563 
Entry  Tue Sep 10 15:18:20 2019, Matej Roguljic, Other, Modules 1504, 1505, 1520 irradiation report 
Modules 1504, 1505 and 1520 were taken to Zagreb for irradiation on 13.08.19. The goal was to check the v4 behavior after irradiation. They were irradiated
to 1.2 MGy and returned to PSI on 9th of September. Upon testing them at PSI, they all had issues. ROCs on M1504 and M1520 were not programmable at all,
changing Vana had no effect. Vana could be set on M1505 while targeting Iana = 28 mA/ROC, however, no timing could be found for it and no working pixel
    Reply  Fri Sep 13 15:06:51 2019, Andrey Starodumov, Other, Modules 1504, 1505, 1520 irradiation report 
It was discovered that these modules were stored in Zagreb in the climatic lab where T was about +22C. These modules have been transported from Co60 irradiation
facility to the lab on open air with T>30C and RH>70%. Water in the air under the cap condensated on the surface of HDIs and diluted residuals (from soldering,
passivation etc), that after remains liquid or crystallised.
    Reply  Thu Sep 19 00:52:24 2019, Dinko Ferencek, Other, Modules 1504, 1505, 1520 irradiation report ZG-FER_temp_hum_2019.08.16.-09.16.pngpixellab-main-room-1.png
[quote="Andrey Starodumov"]It was discovered that these modules were stored in Zagreb in the climatic lab where T was about +22C. These modules have been
transported from Co60 irradiation facility to the lab on open air with T>30C and RH>70%. Water in the air under the cap condensated on the surface of HDIs
and diluted residuals (from soldering, passivation etc), that after remains liquid or crystallised.
Entry  Wed Feb 5 16:18:30 2020, Dinko Ferencek, Module transfer, Module location tracking added to the assembly spreadsheet 
To keep track of the module location, two columns were added to the module assembly spreadsheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL]
that contain the dates when a given module is shipped to ETHZ and when it is returned to PSI.
Entry  Fri May 29 15:56:27 2020, Andrey Starodumov, FTs for ETHZ, Module list2 
[COLOR=green]green:[/COLOR] correct in Total production overview
black: to remove old entries/rows
[COLOR=red]red:[/COLOR] many failures at one or both temperatures
    Reply  Thu Jun 4 11:32:46 2020, Dinko Ferencek, FTs for ETHZ, Module list2 
The following FullQualification tar file have been uploaded to CERNBox

rsync -avPSh --no-r --include="M1538_FullQualification_2020-04-29*.tar" --exclude="*" /home/l_tester/L1_DATA/* /home/l_tester/DATA/L1_DATA_Backup/CERNBox_Dropbox/
Entry  Fri May 22 17:09:37 2020, Andrey Starodumov, FTs for ETHZ, Module list1 
[COLOR=green]green[/COLOR]: correct in Total production overview
black: to remove old entries/raws
[COLOR=red]red[/COLOR]: many failures at one or both temperatures
    Reply  Tue May 26 22:56:46 2020, Dinko Ferencek, FTs for ETHZ, Module list1 
The following FullQualification tar file have been uploaded to CERNBox

rsync -avPSh --no-r --include="M1536_FullQualification_2020-04-29*.tar" --exclude="*" /home/l_tester/L1_DATA/* /home/l_tester/DATA/L1_DATA_Backup/CERNBox_Dropbox/
Entry  Mon Jun 15 10:36:45 2020, Andrey Starodumov, FTs for ETHZ, Module list 3 
M1596 2020-04-28 
M1597 2020-04-30 
M1598 2020-05-04 
    Reply  Tue Jun 16 00:45:48 2020, Dinko Ferencek, FTs for ETHZ, Module list 3 
The following FullQualification tar file have been uploaded to CERNBox

rsync -avPSh --no-r --include="M1596_FullQualification_2020-04-28*.tar" --exclude="*" /home/l_tester/L1_DATA/* /home/l_tester/DATA/L1_DATA_Backup/CERNBox_Dropbox/
Entry  Wed Jan 22 11:50:20 2020, Dinko Ferencek, Software, Module configuration files for interactive tests 
There are two module configuration folders set up for elComandante

/home/l_tester/L1_SW/pxar/data/tbm10d_procv3/
Entry  Wed Feb 5 16:07:03 2020, Dinko Ferencek, Module assembly, Module assembly spreadsheet migrated to Google Sheets 
Excel file stored on CERNBox containing the module assembly spreadsheet has been replaced with a Google Sheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL].
This change should make common editing of the spreadsheet easier.
Entry  Thu May 7 00:56:50 2020, Dinko Ferencek, Software, MoReWeb updates related to the BB2 test 9x
Andrey noticed that results of the BB2 test (here example for ROC 12 in M1675)

[IMG]elog:255/1[/IMG]
Entry  Thu Apr 30 16:47:00 2020, Matej Roguljic, Software, MoReWeb empty DAC plots 
Some of the DAC parameters plots were empty in the total production overview page. All the empty plots had the number "35" in them (e.g. DAC distribution
m20_1 vana 35). The problem was tracked down to the trimming configuration. Moreweb was expecting us to trim to Vcal 35, while we decided to trim to Vcal
50. I "grepped" where this was hardcoded and changed 35->50. 
ELOG V3.1.3-7933898