ID |
Date |
Author |
Category |
Subject |
Text |
|
55
|
Fri Jan 24 18:22:00 2020 |
Dinko Ferencek | General | L1 replacement web page updated | This week several new links were added to
the main L1 replacement web page located
at the following URL
|
|
113
|
Wed Mar 18 15:23:27 2020 |
Andrey Starodumov | General | New rules at PSI | From today only two persons from the group
allowed to be present. We are working in
shifts: Urs in the morning start full qualification |
|
212
|
Tue Apr 14 17:29:46 2020 |
Andrey Starodumov | General | ROC4 or ROC12 defects | Starting from M1650 almost every module has
a cluster of dead pixels or broken bump bonds
on
|
|
222
|
Tue Apr 21 15:34:57 2020 |
Andrey Starodumov | General | Retesting starts today | From today we will retest modules that have
been tested with pXar SW versions earlier
than March 18.
|
|
249
|
Mon May 4 15:28:14 2020 |
Andrey Starodumov | General | M1660 | M1660 is taken from gel-pak and cabled for
retest.
This module was graded C only at second FT |
|
280
|
Fri May 29 15:41:40 2020 |
Andrey Starodumov | General | M1546 | ROC10 of M1546 has 107 pixels with trimming
problems:
in a VCal threshold scan after trimming 81 |
|
286
|
Fri Jun 5 16:22:19 2020 |
Andrey Starodumov | General | Cleaning L1_DATA directory | To be able to analyse Xray data and keep Total
Production overview in a proper state we
need to clean L1_DATA directory.
|
|
293
|
Sun Jul 5 13:20:55 2020 |
Dinko Ferencek | General | Disk cleanup on the lab PC (pc11366.psi.ch) | Home folder was cleaned up by deleting old
pXar output .log and .root files. The full
list is in the attached file. This released |
|
296
|
Fri Aug 14 13:47:26 2020 |
Andrey Starodumov | General | new PH optimisation test and Total Overview | New PH optimisation is done at -20C as a FT,
hence the results of this test are added
to "DB" file as the second m20_1 test.
|
|
34
|
Wed Nov 20 16:53:50 2019 |
Andrey | Full test | M1533 and M1534 FullQualification | FullQualification of two modules M1533 and
M1534 has been done. Full time of the test
is about 7hrs.
|
|
43
|
Mon Dec 2 17:29:06 2019 |
Andrey Starodumov | Full test | 4 modules FT | FullQualification of four modules M1526, M1529,
M1521 and M1534 has been done. Full time
of the test is about 5.5hrs.
|
|
44
|
Tue Dec 3 12:15:54 2019 |
Andrey Starodumov | Full test | 4 modules FT | [quote="Andrey Starodumov"]FullQualification
of four modules M1526, M1529, M1521 and M1534
has been done. Full time of the test is about |
|
58
|
Mon Feb 3 11:28:38 2020 |
Anrey Starodumov | Full test | 4 modules FT: 1536, 1537,1538, 1540 | [COLOR=blue]Jan 28[/COLOR]: Reception test
for 1536, 1537, 1538 OK
Then cap gluing
|
|
59
|
Mon Feb 3 15:35:09 2020 |
Anrey Starodumov | Full test | 4 modules FT: 1539, 1541,1542, 1543 | [COLOR=blue]Jan 29[/COLOR]
- Reception test for 1539 OK
- Cap gluing
|
|
72
|
Fri Feb 7 20:35:44 2020 |
Dinko Ferencek | Full test | FT for 4 modules: 1545, 1547, 1548, 1549 |
[B]1545:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10).
Problematic ROC 14: mean noise >320e, many |
|
73
|
Sat Feb 8 20:48:11 2020 |
Dinko Ferencek | Full test | FT for 4 modules: 1550, 1551, 1552, 1553 |
[B]1550:[/B] [COLOR=darkblue]B/B/B[/COLOR]
(-20/-20/+10). Electrical grade is B due |
|
74
|
Sun Feb 9 10:52:17 2020 |
Dinko Ferencek | Full test | FT for 4 modules: 1539, 1554, 1555, 1556 |
[B]1539:[/B] [COLOR=darkblue]B/B/B[/COLOR]
(-20/-20/+10). Electrical grade is B due |
|
77
|
Sun Feb 9 19:34:55 2020 |
Dinko Ferencek | Full test | FT for 4 modules: 1557, 1558, 1559, 1560 |
[B]1557:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10).
Mean noise >200e for some ROCs, dead trimbits, |
|
84
|
Fri Feb 14 09:48:27 2020 |
Dinko Ferencek | Full test | FT for 12 modules: 1561-1576 (1563, 1567, 1572, 1575 excluded) | [COLOR=blue]Feb. 11[/COLOR]
[B]1561:[/B] [COLOR=red]C/[/COLOR][COLOR=darkblue]B/B[/COLOR] |
|
90
|
Wed Feb 26 10:34:55 2020 |
Urs Langenegger | Full test | Fulltest after Peltier replacement | On 2020/02/25, after SIlvan had replaced the
Peltiers, I did a fulltest. Here the summary:
|
|