  309   Mon Jan 25 13:03:22 2021 Dinko FerencekPOSPOS configuration files createdThe output POS configuration files has '_Bpix_'
instead of '_BPix_' in their names. The culprit
was identified to be the C3 cell in the 'POS'
  
  123   Sun Mar 22 13:57:25 2020 Danek KotlinskiReception testM1617 failed[quote="Andrey Starodumov"]ROC8 of M1617 is
programmable but no readout from it.
Silvan noticed that a corner of one ROC of
  
  124   Sun Mar 22 14:02:20 2020 Danek KotlinskiReception testM1616 failed[quote="Andrey Starodumov"]ROC10 of M1616
is not programmable, no readout from ROC10
and ROC11.
  
  125   Sun Mar 22 14:05:20 2020 Danek KotlinskiReception testM1615 failed[quote="Andrey Starodumov"]M1615 is programmable
but "no working phases found"
Visual inspection of wire bonds - OK.
  
  156   Mon Mar 30 14:52:59 2020 Danek KotlinskiFull testFT of M1629, M1630, M1631, M1632I have tested M1630.
I see not problem with ROC1. See the attached
plot.
 m1630_roc1_ph_fits.png 
  58   Mon Feb 3 11:28:38 2020 Anrey StarodumovFull test4 modules FT: 1536, 1537,1538, 1540[COLOR=blue]Jan 28[/COLOR]: Reception test
for 1536, 1537, 1538 OK
Then cap gluing
 1537ROC10m20-TrThr.pdf 
  59   Mon Feb 3 15:35:09 2020 Anrey StarodumovFull test4 modules FT: 1539, 1541,1542, 1543[COLOR=blue]Jan 29[/COLOR] 
- Reception test for 1539 OK
- Cap gluing
 1542ROC13-TrThr.pdf 
  10   Fri Sep 13 15:06:51 2019 Andrey StarodumovOtherModules 1504, 1505, 1520 irradiation reportIt was discovered that these modules were
stored in Zagreb in the climatic lab where
T was about +22C. These modules have been
  
  43   Mon Dec 2 17:29:06 2019 Andrey StarodumovFull test4 modules FTFullQualification of four modules M1526, M1529,
M1521 and M1534 has been done. Full time
of the test is about 5.5hrs.
  
  44   Tue Dec 3 12:15:54 2019 Andrey StarodumovFull test4 modules FT[quote="Andrey Starodumov"]FullQualification
of four modules M1526, M1529, M1521 and M1534
has been done. Full time of the test is about
 M1526ATm20.pngM1526ATp10.png 
  60   Mon Feb 3 15:53:32 2020 Andrey StarodumovReception test5 modules RT: 1545, 1547, 1548, 1549, 1550[COLOR=blue]Feb 03[/COLOR]
- RT is done and OK for all modules. All
5 modules graded [COLOR=darkgreen]A[/COLOR].
  
  61   Mon Feb 3 17:09:36 2020 Andrey StarodumovReception test2 modules RT failed: 1544, 1546[COLOR=blue]Feb 03[/COLOR]
- RT failed
-- 1544: 
  
  95   Tue Mar 3 14:05:13 2020 Andrey StarodumovRe-gradingRegrading C modules: due to NoiseIt has been realized by Urs that VCal to electron
conversion used by MoreWeb is still 50e/VCal.
While recent calibration done by Maren with
  
  97   Wed Mar 4 16:00:05 2020 Andrey StarodumovRe-gradingRegrading C M1591: due to Noise[quote="Andrey Starodumov"]It has been realized
by Urs that VCal to electron conversion used
by MoreWeb is still 50e/VCal.
  
  98   Mon Mar 9 16:16:48 2020 Andrey StarodumovHDI testHDIs: 3001, 3002, 3003, 3004 and 4033Today I tested 5 HDIs: 3001, 3002, 3003, 3004
and 4033
Results:
  
  100   Wed Mar 11 16:48:10 2020 Andrey StarodumovOtherM1586: issues with MOLEX?[quote="Urs Langenegger"]Module M1586 had
passed the full qualification on 20/02/27.
I had had to re-insert the cable in the Molex
  
  103   Wed Mar 11 17:59:48 2020 Andrey StarodumovRe-gradingRegrading C M1542: due to NoiseFollow the instruction from M1591 regrading
log:
"To correct the Summary page one needs to
  
  112   Wed Mar 18 15:16:47 2020 Andrey StarodumovSoftwareChange in trimmig algorithmUrs yesterday modified the algorithm and tested
it. From today we are using it. Main change
that threshold for trimming is not any more
  
  113   Wed Mar 18 15:23:27 2020 Andrey StarodumovGeneralNew rules at PSIFrom today only two persons from the group
allowed to be present. We are working in
shifts: Urs in the morning start full qualification
  
  114   Wed Mar 18 17:43:41 2020 Andrey StarodumovModule assemblyM1605-M1608M1605 and M1606: reception done on Mar 17
M1607 and M1608: reception done today
All: grade A
  