    Reply  Mon Jan 25 13:03:22 2021, Dinko Ferencek, POS, POS configuration files created 
The output POS configuration files has '_Bpix_' instead of '_BPix_' in their names. The culprit was identified to be the C3 cell in the 'POS' sheet of [URL=https://docs.google.com/spreadsheets/d/1PTlNGoXFR4mV685KnVLmydQnlJ2bUdSRyfKQmNT5pmE/edit?usp=sharing]Module_bookkeeping-L1_2020[/URL]
Google spreadsheet which contained 'Bpix' instead of 'BPix' which was messing up the file names. This has been fixed now and the configuration files regenerated.
    Reply  Sun Mar 22 13:57:25 2020, Danek Kotlinski, Reception test, M1617 failed 
[quote="Andrey Starodumov"]ROC8 of M1617 is programmable but no readout from it.
Silvan noticed that a corner of one ROC of this module is broken,
this is exactly ROC8.[/quote]
    Reply  Sun Mar 22 14:02:20 2020, Danek Kotlinski, Reception test, M1616 failed 
[quote="Andrey Starodumov"]ROC10 of M1616 is not programmable, no readout from ROC10 and ROC11.
Visual inspection of wire bonds - OK
To module doctor![/quote]
    Reply  Sun Mar 22 14:05:20 2020, Danek Kotlinski, Reception test, M1615 failed 
[quote="Andrey Starodumov"]M1615 is programmable but "no working phases found"
Visual inspection of wire bonds - OK.
To module doctor![/quote]
    Reply  Mon Mar 30 14:52:59 2020, Danek Kotlinski, Full test, FT of M1629, M1630, M1631, M1632 m1630_roc1_ph_fits.png
I have tested M1630.
I see not problem with ROC1. See the attached plot.
There is one dcol in ROC12 which shoes the "pattern" problem seen in a few other ROCs.
Entry  Mon Feb 3 11:28:38 2020, Anrey Starodumov, Full test, 4 modules FT: 1536, 1537,1538, 1540 1537ROC10m20-TrThr.pdf
[COLOR=blue]Jan 28[/COLOR]: Reception test for 1536, 1537, 1538 OK
Then cap gluing
[COLOR=blue]Jan 29[/COLOR]
Entry  Mon Feb 3 15:35:09 2020, Anrey Starodumov, Full test, 4 modules FT: 1539, 1541,1542, 1543 1542ROC13-TrThr.pdf
[COLOR=blue]Jan 29[/COLOR] 
- Reception test for 1539 OK
- Cap gluing
    Reply  Fri Sep 13 15:06:51 2019, Andrey Starodumov, Other, Modules 1504, 1505, 1520 irradiation report 
It was discovered that these modules were stored in Zagreb in the climatic lab where T was about +22C. These modules have been transported from Co60 irradiation
facility to the lab on open air with T>30C and RH>70%. Water in the air under the cap condensated on the surface of HDIs and diluted residuals (from soldering,
passivation etc), that after remains liquid or crystallised.
Entry  Mon Dec 2 17:29:06 2019, Andrey Starodumov, Full test, 4 modules FT 
FullQualification of four modules M1526, M1529, M1521 and M1534 has been done. Full time of the test is about 5.5hrs.
Test included: FT@-20C, IV@-20, 3Cycles from -20C up to +10C, FT@10C and IV@10C.
Only M1521 passed the test (Grade B). Several issues observed in other modules:
    Reply  Tue Dec 3 12:15:54 2019, Andrey Starodumov, Full test, 4 modules FT M1526ATm20.pngM1526ATp10.png
[quote="Andrey Starodumov"]FullQualification of four modules M1526, M1529, M1521 and M1534 has been done. Full time of the test is about 5.5hrs.
Test included: FT@-20C, IV@-20, 3Cycles from -20C up to +10C, FT@10C and IV@10C.
Only M1521 passed the test (Grade B). Several issues observed in other modules:
Entry  Mon Feb 3 15:53:32 2020, Andrey Starodumov, Reception test, 5 modules RT: 1545, 1547, 1548, 1549, 1550 
[COLOR=blue]Feb 03[/COLOR]
- RT is done and OK for all modules. All 5 modules graded [COLOR=darkgreen]A[/COLOR].
Entry  Mon Feb 3 17:09:36 2020, Andrey Starodumov, Reception test, 2 modules RT failed: 1544, 1546 
[COLOR=blue]Feb 03[/COLOR]
- RT failed
-- 1544: 
Entry  Tue Mar 3 14:05:13 2020, Andrey Starodumov, Re-grading, Regrading C modules: due to Noise 
It has been realized by Urs that VCal to electron conversion used by MoreWeb is still 50e/VCal.
While recent calibration done by Maren with a few new modules suggest that this conversion is 43.7electrons per 1 VCal (the number from Danek).
I re-run MoreWeb analysis with 44e/Vcal for modules that are graded C for high noise (>300e).
    Reply  Wed Mar 4 16:00:05 2020, Andrey Starodumov, Re-grading, Regrading C M1591: due to Noise 
[quote="Andrey Starodumov"]It has been realized by Urs that VCal to electron conversion used by MoreWeb is still 50e/VCal.
While recent calibration done by Maren with a few new modules suggest that this conversion is 43.7electrons per 1 VCal (the number from Danek).
I re-run MoreWeb analysis with 44e/Vcal for modules that are graded C for high noise (>300e).
Entry  Mon Mar 9 16:16:48 2020, Andrey Starodumov, HDI test, HDIs: 3001, 3002, 3003, 3004 and 4033 
Today I tested 5 HDIs: 3001, 3002, 3003, 3004 and 4033
Results:
[B]3001[/B]
    Reply  Wed Mar 11 16:48:10 2020, Andrey Starodumov, Other, M1586: issues with MOLEX? 
[quote="Urs Langenegger"]Module M1586 had passed the full qualification on 20/02/27. I had had to re-insert the cable in the Molex connector for it to become
programmable. 
Entry  Wed Mar 11 17:59:48 2020, Andrey Starodumov, Re-grading, Regrading C M1542: due to Noise 
Follow the instruction from M1591 regrading log:
"To correct the Summary page one needs to remove rows from DB with C grade from previous data analysis (that for some reason stayed in DB)
using python Controller -d and then run python Controller -m MXXXX"
Entry  Wed Mar 18 15:16:47 2020, Andrey Starodumov, Software, Change in trimmig algorithm 
Urs yesterday modified the algorithm and tested it. From today we are using it. Main change that threshold for trimming is not any more fixed to VthrComp=79
but calculated based on the bottom tornado value + 20. CalDel is also optimised. This allows us to avoid failures in the trimbit tests due to too high
threshold, eg if the bottom of tornado close to 70 a fraction of pixels in a chip could have threshold above 70 and hence fail in the test. 
Entry  Wed Mar 18 15:23:27 2020, Andrey Starodumov, General, New rules at PSI 
From today only two persons from the group allowed to be present. We are working in shifts: Urs in the morning start full qualification and I in the afternoon
test HDIs, run Reception, glue caps and switch the cold box, chiller etc after the full test finished.
Silvan is building usually 4 modules and 6-8 HDIs per day.
Entry  Wed Mar 18 17:43:41 2020, Andrey Starodumov, Module assembly, M1605-M1608 
M1605 and M1606: reception done on Mar 17
M1607 and M1608: reception done today
All: grade A