CMS Pixel Detector Miscellaneous
Phase 1 Phase 2
Layer 1 Replacement Layers 2-4
  Layer 1 Replacement Elog, Page 4 of 16  Not logged in ELOG logo
ID Date Authordown Category Subject Text Attachments
  57   Thu Jan 30 13:51:03 2020 Matej RoguljicCold box testsFulltest failure - psiAgenteDuring the first fulltest@-20 of the full
qualification procedure for modules: 1539,
1541, 1542 and 1543; an error message popped
  
  101   Wed Mar 11 17:12:05 2020 Matej RoguljicHDI testHDI testing procedure changeThere is an additional test that will be used
from 11.03. on all HDIs. It involves measuring
the voltage between ground and the HV pin
  
  102   Wed Mar 11 17:22:57 2020 Matej RoguljicHDI test8 HDI tests on 11.3.I tested 8 HDIs today: 5029,5030,5031,6034,6036,6035,1031
and 1032
All of them tested fine.
  
  104   Thu Mar 12 12:19:43 2020 Matej RoguljicHDI test5 HDI tests on 12.3.I tested 5 HDIs on 12.3. 1030,1029,1040,1039
and 1038. 1039 failed all the electrical
tests. All the others passed the tests. HDI
  
  105   Thu Mar 12 17:21:59 2020 Matej RoguljicFull test Fulltests on 2020/03/12 Modules tested:
M1557 C (trim bits at -20)
M1558 C (gain at -20)
  
  107   Sat Mar 14 17:08:14 2020 Matej RoguljicFull testFulltests on 2020/03/13
Modules tested:
M1591 C (gain at -20)
  
  108   Mon Mar 16 10:05:23 2020 Matej RoguljicSoftwarePhQualification changeUrs made a change in pXar, in the PhOptimization
algorithm. One of the changes is in the testParameters.dat
where vcalhigh is set to 100 instead of 255.
  
  109   Mon Mar 16 11:04:41 2020 Matej RoguljicPhQualificationPhQualification 14.-15.3.I ran PhQualification over the weekend with
changes pulled from git (described here https://elrond.irb.hr/elog/Layer+1+Replacement/108).
  
  110   Mon Mar 16 15:17:18 2020 Matej RoguljicModule assemblyM1601 and M1602Andrey and I assembled modules 1601 and 1602
on Friday, 13.3. On Monday, 16.3. I ran reception
on them (both graded A) and then glued protection
  
  111   Mon Mar 16 15:20:03 2020 Matej RoguljicPhQualificationPhQualification on 16.3.PhQualification was run on modules M1561,
M1564, M1565, M1566. 
  
  243   Thu Apr 30 16:47:00 2020 Matej RoguljicSoftwareMoReWeb empty DAC plotsSome of the DAC parameters plots were empty
in the total production overview page. All
the empty plots had the number "35" in them
  
  301   Wed Sep 2 16:09:24 2020 Matej RoguljicModules for PM1595 switch with M1558Module 1595 was foreseen to go on the inner
ladder 5, position -2 (negative two). During
the pre-installation test, we saw it had
  
  1   Tue Aug 6 14:30:00 2019 Dinko FerencekDocumentationJumo Imago 500 manualsManuals can be found at https://www.manualslib.com/products/Jumo-Imago-500-8786441.html   
  12   Thu Sep 19 00:52:24 2019 Dinko FerencekOtherModules 1504, 1505, 1520 irradiation report[quote="Andrey Starodumov"]It was discovered
that these modules were stored in Zagreb
in the climatic lab where T was about +22C.
 ZG-FER_temp_hum_2019.08.16.-09.16.pngpixellab-main-room-1.png 
  14   Thu Sep 26 15:51:30 2019 Dinko FerencekSoftwarepXar code updatedpXar code in /home/l_tester/L1_SW/pxar/ on
the lab PC was updated yesterday from [URL=https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0]https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0[/URL]
to the latest version [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL]
  
  16   Thu Sep 26 21:48:56 2019 Dinko FerencekModule assemblyCap gluing trainingToday I performed my first cap gluing. As
an exercise it was first done on two dummy
modules and later on a pre-production module
  
  17   Thu Sep 26 22:09:14 2019 Dinko FerencekSoftwareDAC configuration updateIn accordance with the agreement made in an
email thread initiated by Danek, the following
changes to DAC settings for ROCs
  
  18   Fri Sep 27 22:24:31 2019 Dinko FerencekGeneralActivities on 27. 9. 2019.[LIST]
[*] Today Silvan wire bonded TBMs to the
first batch of 8 new HDIs which were then
  
  19   Fri Sep 27 23:22:02 2019 Dinko FerencekModule assemblyCap gluing trainingAttached are the bump bonding threshold maps
before and after cap gluing and the (before
- after) difference for M1522.
 M1522_beforeGluing.pngM1522_afterGluing.pngM1522_diff.png 
  20   Wed Oct 2 12:41:16 2019 Dinko FerencekModule assemblyFirst production modules assembledFirst production modules (M1530, M1531, M1532)
were built on Monday, Sep. 30 2019.
 6x 
ELOG V3.1.3-7933898