ID |
Date |
Author |
Category |
Subject |
Text |
|
57
|
Thu Jan 30 13:51:03 2020 |
Matej Roguljic | Cold box tests | Fulltest failure - psiAgente | During the first fulltest@-20 of the full
qualification procedure for modules: 1539,
1541, 1542 and 1543; an error message popped |
|
101
|
Wed Mar 11 17:12:05 2020 |
Matej Roguljic | HDI test | HDI testing procedure change | There is an additional test that will be used
from 11.03. on all HDIs. It involves measuring
the voltage between ground and the HV pin |
|
102
|
Wed Mar 11 17:22:57 2020 |
Matej Roguljic | HDI test | 8 HDI tests on 11.3. | I tested 8 HDIs today: 5029,5030,5031,6034,6036,6035,1031
and 1032
All of them tested fine. |
|
104
|
Thu Mar 12 12:19:43 2020 |
Matej Roguljic | HDI test | 5 HDI tests on 12.3. | I tested 5 HDIs on 12.3. 1030,1029,1040,1039
and 1038. 1039 failed all the electrical
tests. All the others passed the tests. HDI |
|
105
|
Thu Mar 12 17:21:59 2020 |
Matej Roguljic | Full test | Fulltests on 2020/03/12 | Modules tested:
M1557 C (trim bits at -20)
M1558 C (gain at -20)
|
|
107
|
Sat Mar 14 17:08:14 2020 |
Matej Roguljic | Full test | Fulltests on 2020/03/13 |
Modules tested:
M1591 C (gain at -20)
|
|
108
|
Mon Mar 16 10:05:23 2020 |
Matej Roguljic | Software | PhQualification change | Urs made a change in pXar, in the PhOptimization
algorithm. One of the changes is in the testParameters.dat
where vcalhigh is set to 100 instead of 255. |
|
109
|
Mon Mar 16 11:04:41 2020 |
Matej Roguljic | PhQualification | PhQualification 14.-15.3. | I ran PhQualification over the weekend with
changes pulled from git (described here https://elrond.irb.hr/elog/Layer+1+Replacement/108).
|
|
110
|
Mon Mar 16 15:17:18 2020 |
Matej Roguljic | Module assembly | M1601 and M1602 | Andrey and I assembled modules 1601 and 1602
on Friday, 13.3. On Monday, 16.3. I ran reception
on them (both graded A) and then glued protection |
|
111
|
Mon Mar 16 15:20:03 2020 |
Matej Roguljic | PhQualification | PhQualification on 16.3. | PhQualification was run on modules M1561,
M1564, M1565, M1566. |
|
243
|
Thu Apr 30 16:47:00 2020 |
Matej Roguljic | Software | MoReWeb empty DAC plots | Some of the DAC parameters plots were empty
in the total production overview page. All
the empty plots had the number "35" in them |
|
301
|
Wed Sep 2 16:09:24 2020 |
Matej Roguljic | Modules for P | M1595 switch with M1558 | Module 1595 was foreseen to go on the inner
ladder 5, position -2 (negative two). During
the pre-installation test, we saw it had |
|
1
|
Tue Aug 6 14:30:00 2019 |
Dinko Ferencek | Documentation | Jumo Imago 500 manuals | Manuals can be found at https://www.manualslib.com/products/Jumo-Imago-500-8786441.html |
|
12
|
Thu Sep 19 00:52:24 2019 |
Dinko Ferencek | Other | Modules 1504, 1505, 1520 irradiation report | [quote="Andrey Starodumov"]It was discovered
that these modules were stored in Zagreb
in the climatic lab where T was about +22C. |
|
14
|
Thu Sep 26 15:51:30 2019 |
Dinko Ferencek | Software | pXar code updated | pXar code in /home/l_tester/L1_SW/pxar/ on
the lab PC was updated yesterday from [URL=https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0]https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0[/URL]
to the latest version [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL] |
|
16
|
Thu Sep 26 21:48:56 2019 |
Dinko Ferencek | Module assembly | Cap gluing training | Today I performed my first cap gluing. As
an exercise it was first done on two dummy
modules and later on a pre-production module |
|
17
|
Thu Sep 26 22:09:14 2019 |
Dinko Ferencek | Software | DAC configuration update | In accordance with the agreement made in an
email thread initiated by Danek, the following
changes to DAC settings for ROCs
|
|
18
|
Fri Sep 27 22:24:31 2019 |
Dinko Ferencek | General | Activities on 27. 9. 2019. | [LIST]
[*] Today Silvan wire bonded TBMs to the
first batch of 8 new HDIs which were then |
|
19
|
Fri Sep 27 23:22:02 2019 |
Dinko Ferencek | Module assembly | Cap gluing training | Attached are the bump bonding threshold maps
before and after cap gluing and the (before
- after) difference for M1522. |
|
20
|
Wed Oct 2 12:41:16 2019 |
Dinko Ferencek | Module assembly | First production modules assembled | First production modules (M1530, M1531, M1532)
were built on Monday, Sep. 30 2019.
|
6x |