| ID | 
Date | 
Author  | 
Category | 
Subject | 
Text | 
  | 
| 
  92  
 | 
Thu Feb 27 10:14:09 2020 | 
danek kotlinski | Module transfer | M1562 to DESY | M1562 was not qualified during a full test 
since the test did not complete.
 
Looking at the module I see that roc 2 has | 
   | 
| 
  96  
 | 
Wed Mar  4 11:32:42 2020 | 
danek kotlinski | Full test | change the target trim threshodl to vcal=50 | After some discussion we decided to change 
the target trimming threshold from vcal 40 
to 50.
 | 
   | 
| 
  135  
 | 
Wed Mar 25 14:42:55 2020 | 
danek kotlinski | Module transfer | modules 1545 & 1542 back from ETH | M1545 & M1542 were returned from ETH to PSI 
for further testing. | 
   | 
| 
  141  
 | 
Wed Mar 25 20:17:16 2020 | 
danek kotlinski | Module doctor | The list of modules tested today by Wolfram | M1542     nothing on sdata3 (12-15), bad output 
or wire-bond
 
M1544     ROC15 timing off, can be made to | 
   | 
| 
  142  
 | 
Thu Mar 26 10:41:24 2020 | 
danek kotlinski | Module grading | M1606 | I have looked more closely at M1606.
 
Trimming show problems in ROC2, 8 pixels 
have 0 threshold and for 61 pixels thr=-1.
 | 
   | 
| 
  155  
 | 
Sun Mar 29 18:14:59 2020 | 
danek kotlinski | Other | Modules 1544 & 1563 in gelpack | The 2 bad modules:
 
M1544
 
M1563 
 | 
   | 
| 
  161  
 | 
Tue Mar 31 06:54:12 2020 | 
danek kotlinski | Module grading | M1542 | I have tested M1542.
 
It looks not bad but there is a group of 
pixels in the lower/left corner of ROC6 which | 
    | 
| 
  202  
 | 
Thu Apr  9 14:19:40 2020 | 
danek kotlinski | Module transfer | Modules moved to gel-pack | The following good module class A/B have been 
moved to gel-packs:
 
1607, 1608, 1609, 1610, 1612, 1613, 1614, | 
   | 
| 
  205  
 | 
Thu Apr  9 16:13:51 2020 | 
danek kotlinski | Module transfer | Modules moved to gel-pack | [quote="danek kotlinski"]The following good 
module class A/B have been moved to gel-packs:
 
1607, 1608, 1609, 1610, 1612, 1613, 1614, | 
   | 
| 
  213  
 | 
Wed Apr 15 08:48:09 2020 | 
danek kotlinski | Module doctor | Wolfram's tests from 14/4/20 | two of are fixed and can be re-tested
 
M1623   tbm bond
 
M1657   bond roc 15
 | 
   | 
| 
  214  
 | 
Wed Apr 15 17:14:42 2020 | 
danek kotlinski | Module transfer | move 4 modules to gel-packs | Moved to gel-apcks:
 
1629 B
 
1631 B
 | 
   | 
| 
  216  
 | 
Wed Apr 15 17:33:53 2020 | 
danek kotlinski | Module transfer | move 4 modules to gel-packs | [quote="danek kotlinski"]Moved to gel-apcks:
 
1629 B
 
1631 B
 | 
   | 
| 
  242  
 | 
Thu Apr 30 15:38:43 2020 | 
danek kotlinski | Module transfer | M1635 & M1671 transferred to gel-pack | Two bad modules have been placed in gel-packs: 
1635 & 1671. | 
   | 
| 
  246  
 | 
Fri May  1 19:34:01 2020 | 
danek kotlinski | Module grading | M1582 | M1582 was classified as C because of 167 pixels 
failing trimming in ROC1.
 
I have tested this module.
 | 
     | 
| 
  258  
 | 
Mon May 11 14:14:05 2020 | 
danek kotlinski | Other | M1606 | On Friday I have tested M1606 at room temperature 
in the red cold box.
 
Previously it was reported that trimming | 
      | 
| 
  259  
 | 
Mon May 11 14:40:16 2020 | 
danek kotlinski | Other | M1582 | On Friday I have tested the module M1582 at 
room temperature in the blue box.
 
The report in MoreWeb says that this module | 
      | 
| 
  287  
 | 
Tue Jun  9 17:19:00 2020 | 
danek kotlinski | Module transfer | gel-pack transfers  | The following modules, which were already 
X-ray tested and came back from ETHZ, 
 
have been transferred to gel_packs:
 | 
   | 
| 
  290  
 | 
Tue Jun 16 19:23:37 2020 | 
danek kotlinski | Module transfer | modules from and to ETH, list 3 | The 27 modules from list 2 have been transferred 
back to PSI.
 
 | 
   | 
| 
  291  
 | 
Thu Jun 18 20:04:41 2020 | 
danek kotlinski | Module transfer | Modules to ETH, transport #6 | Today Lea has delivered another group of 18 
modules to the ETH:
 
1604
 | 
   | 
| 
  292  
 | 
Thu Jul  2 13:48:20 2020 | 
danek kotlinski | Module transfer | Transport #7 to ETH | Lea brought the last batch of 8 modules to 
ETH:
 
1542
 | 
   | 
| 
  295  
 | 
Wed Jul 29 17:19:43 2020 | 
danek kotlinski | PhQualification | Change configuration for PH qialification | Preparing the new PH optimization I had to 
make the following modifications:
 
 | 
   | 
| 
  304  
 | 
Fri Oct 23 13:33:04 2020 | 
danek kotlinski | Module transfer | L1 & L2 modules to go to P5 | The following modules will be transported 
to CERN/P5 as spares.
 
 | 
   | 
| 
  305  
 | 
Fri Nov  6 07:28:42 2020 | 
danek kotlinski | POS | POS configuration files created | [quote="Dinko Ferencek"]pXar parameter files 
were converted to POS configuration files 
by executing the following commands on the | 
   | 
| 
  87  
 | 
Mon Feb 24 13:53:32 2020 | 
Urs Langenegger | Module assembly | Setup changes in week 8 | Setup changes in week 8
 
 
Silvan considered the single-module gluing | 
   | 
| 
  88  
 | 
Mon Feb 24 14:01:29 2020 | 
Urs Langenegger | Module assembly | Cap gluing in W8 | In week 8 the following modules were glued 
and tested: 
 
 | 
   | 
| 
  89  
 | 
Tue Feb 25 17:11:18 2020 | 
Urs Langenegger | Module assembly | Modules glued and tested Feb 24/25 | Modules glued and tested Feb 24/25
 
 
The letters after the module name indicate | 
   | 
| 
  90  
 | 
Wed Feb 26 10:34:55 2020 | 
Urs Langenegger | Full test | Fulltest after Peltier replacement | On 2020/02/25, after SIlvan had replaced the 
Peltiers, I did a fulltest. Here the summary: 
 | 
   | 
| 
  91  
 | 
Thu Feb 27 09:47:51 2020 | 
Urs Langenegger | Full test | Fulltest on 2020/02/26 | On Wednesday, 2020/02/26 the following modules 
went through the full qualification procedure: 
 | 
   | 
| 
  93  
 | 
Fri Feb 28 17:33:16 2020 | 
Urs Langenegger | Full test | Fulltests on 2020/02/28 | M1589 B
 
M1590 C (gain issues?)
 
M1591 C (noise issues?)
 | 
   | 
| 
  94  
 | 
Mon Mar  2 17:39:36 2020 | 
Urs Langenegger | Full test | Fulltests on 2020/03/02 | Modules tested: 
 
M1595 C
 
M1596 B
 | 
   | 
| 
  99  
 | 
Wed Mar 11 15:34:57 2020 | 
Urs Langenegger | Other | M1586:  issues with MOLEX? | Module M1586 had passed the full qualification 
on 20/02/27. I had had to re-insert the cable 
in the Molex connector for it to become programmable. | 
   | 
| 
  147  
 | 
Fri Mar 27 10:54:04 2020 | 
Urs Langenegger | Full test | Issues with pc11366 on March 27 | On March 27 I had a lot of troubles getting 
the full qualification up
 
and running.
 | 
   | 
| 
  163  
 | 
Tue Mar 31 09:29:02 2020 | 
Urs Langenegger | Full test | exchanged adapter for DTB_WXC03A | I did not manage to get any r/o from the module 
connected to that adapter, also after exchanging 
the module.
 | 
   | 
| 
  164  
 | 
Tue Mar 31 10:32:32 2020 | 
Urs Langenegger | Full test | M1637 | Maybe M1637 has an issue: It got stuck twice 
at the same place with 
 
 | 
   | 
| 
  167  
 | 
Tue Mar 31 17:36:36 2020 | 
Urs Langenegger | Full test | exchanged adapter for DTB_WXC03A | [quote="Urs Langenegger"]I did not manage 
to get any r/o from the module connected 
to that adapter, also after exchanging the | 
   | 
| 
  237  
 | 
Wed Apr 29 08:48:06 2020 | 
Urs Langenegger | Other | M1539 | M1539 showed no readout. I tried, all without 
success, 
 
- reconnecting the cable to the adapter multiple | 
   | 
| 
  294  
 | 
Fri Jul 10 11:24:37 2020 | 
Urs Langenegger | Reception test | proc600V3 modules | This week I tested 12 modules built with proc600v3. 
The module numbers are M1722 - M1733. 
 
The results are summarized at the usual place: | 
   | 
| 
  143  
 | 
Thu Mar 26 15:37:18 2020 | 
Urs | Module grading | M1606 | attached find the threshold difference distributions 
for all four trimbits for all ROCs | 
    | 
| 
  157  
 | 
Mon Mar 30 15:40:52 2020 | 
Urs | Full test | FT of M1629, M1630, M1631, M1632 | M1630 is interesting because (I am using my 
terminology in the following) for the test 
at T=+10C ROC1 fails the PH optimization | 
      | 
| 
  2  
 | 
Tue Aug  6 15:15:00 2019 | 
Matej Roguljic | General | Activities 19.6.-4.7.2019. | 17.6.-21.6.
 
 
Andrei and Matej were at PSI working on the | 
   | 
| 
  3  
 | 
Tue Aug  6 16:01:17 2019 | 
Matej Roguljic | Software | Wrong dac settings - elComandante | If it seems that elComandante is taking wrong 
dac settings for tests like Reception test 
or full qualification, one should remember | 
   | 
| 
  4  
 | 
Tue Aug  6 16:06:45 2019 | 
Matej Roguljic | Other | Vsh and ctrlreg for v4 chips | The recommended default value for Vsh is 8, 
but the current version of pXar has it as 
30. One should remember this when making | 
   | 
| 
  5  
 | 
Wed Aug  7 11:49:07 2019 | 
Matej Roguljic | Module assembly | HDI glue irradiation tests | Six different glues were used to glue the 
cap on six dummy modules. They were all irradiated 
to 120 MRad in Zagreb after which they were | 
 10x   | 
| 
  6  
 | 
Wed Aug  7 12:24:14 2019 | 
Matej Roguljic | Documentation | Activities 31.7.-9.8.2019. | 31.7.
 
 
Matej tested 4 HDIs (8030-8033 and 8010). | 
   | 
| 
  7  
 | 
Wed Aug  7 18:01:06 2019 | 
Matej Roguljic | Cold box tests | PhOptimization problem | August 7 - we found out that PhOptimization 
algorithm starts leaking memory if it fails 
to find proper values. If running one setup, | 
   | 
| 
  8  
 | 
Tue Sep 10 15:18:20 2019 | 
Matej Roguljic | Other | Modules 1504, 1505, 1520 irradiation report | Modules 1504, 1505 and 1520 were taken to 
Zagreb for irradiation on 13.08.19. The goal 
was to check the v4 behavior after irradiation. | 
   | 
| 
  9  
 | 
Thu Sep 12 10:32:27 2019 | 
Matej Roguljic | General | Activities 10.9.-19.9.2019. | 10.9.
 
Modules 1504,1505,1520 brought to PSI after 
irradiation to 1.2 MGy in Zagreb. All 3 were | 
   | 
| 
  11  
 | 
Wed Sep 18 15:45:45 2019 | 
Matej Roguljic | Module assembly | HDI sparking under HV test | HDI [B]8010[/B] passed all test except the 
HV. Under the HV test, some sparks could 
be heard and even seen by eye on the right | 
 7x   | 
| 
  13  
 | 
Thu Sep 19 14:20:07 2019 | 
Matej Roguljic | General | Activities 10.9.-19.9.2019. | [quote="Matej Roguljic"]10.9.
 
Modules 1504,1505,1520 brought to PSI after 
irradiation to 1.2 MGy in Zagreb. All 3 were | 
   | 
| 
  15  
 | 
Thu Sep 26 17:38:07 2019 | 
Matej Roguljic | General | Activities 25.-26.9. | It was planned to test a batch of HDIs these 
2 days but the shipment was late. Dinko and 
Andrei were shown the HDI testing procedure. | 
   | 
| 
  23  
 | 
Mon Oct 28 17:01:05 2019 | 
Matej Roguljic | Software |  Investigating the bug with the Keithley client | We took module 1529 and tried recreating the 
issue observed in the beginning of October. 
To do this in a reasonable amount of time, | 
   | 
| 
  25  
 | 
Tue Oct 29 16:36:23 2019 | 
Matej Roguljic | Module assembly | Assembly lab cap gluing jigs | There are two jigs for cap gluing in the assembly 
lab, circled in red and blue on the photo 
in the attachment. The one closer to the | 
    | 
| 
  26  
 | 
Tue Oct 29 16:38:32 2019 | 
Matej Roguljic | Software |  Investigating the bug with the Keithley client | [quote="Matej Roguljic"]We took module 1529 
and tried recreating the issue observed in 
the beginning of October. To do this in a | 
   | 
| 
  27  
 | 
Wed Oct 30 10:38:04 2019 | 
Matej Roguljic | General | Activities 28.-31.10.2019. | 28.10. - Investigated a problem with the FullQualification 
setup, described more in this [URL=https://elrond.irb.hr/elog/Layer+1+Replacement/23]note[/URL]
 
29.10. - Further investigated the aforementioned | 
   | 
| 
  30  
 | 
Wed Oct 30 16:54:58 2019 | 
Matej Roguljic | Software |  Investigating the bug with the Keithley client | [quote="Matej Roguljic"][quote="Matej Roguljic"]We 
took module 1529 and tried recreating the 
issue observed in the beginning of October. | 
   | 
| 
  31  
 | 
Thu Oct 31 10:41:12 2019 | 
Matej Roguljic | Cold box tests | Issue with DTB_WWVASW | On 29th of October, an issue with DTB_WWVASW 
was noticed when trying to run FullQualification 
on 4 modules at the same time. On a tested, | 
   | 
| 
  35  
 | 
Wed Nov 27 08:39:24 2019 | 
Matej Roguljic | Cold box tests | Bump bonding test investigation | The BB test on M1534 shows a lot of dead bunmps 
on C10 and some on C1 and C0 as well. Putting 
a source on top of the module shows that | 
   | 
| 
  38  
 | 
Thu Nov 28 15:58:20 2019 | 
Matej Roguljic | General | Activities 26.-29.11.2019. | 26.11.
 
 
Prepared the tools for RD53A digital module | 
       | 
| 
  46  
 | 
Mon Jan 20 18:09:50 2020 | 
Matej Roguljic | General | Activities 20.-31.01.2020. | 20.01.
 
 
Expanded the HDI testing setup to be able | 
   | 
| 
  56  
 | 
Mon Jan 27 17:50:48 2020 | 
Matej Roguljic | Cold box tests | Failing modules at -20 | Friday, 24.1., it was noticed that the modules 
are graded as 'C' in similar fashion. Module 
is graded A/B at +10 degrees and then graded | 
   | 
| 
  57  
 | 
Thu Jan 30 13:51:03 2020 | 
Matej Roguljic | Cold box tests | Fulltest failure - psiAgente | During the first fulltest@-20 of the full 
qualification procedure for modules: 1539, 
1541, 1542 and 1543; an error message popped | 
   | 
| 
  101  
 | 
Wed Mar 11 17:12:05 2020 | 
Matej Roguljic | HDI test | HDI testing procedure change | There is an additional test that will be used 
from 11.03. on all HDIs. It involves measuring 
the voltage between ground and the HV pin | 
   | 
| 
  102  
 | 
Wed Mar 11 17:22:57 2020 | 
Matej Roguljic | HDI test | 8 HDI tests on 11.3. | I tested 8 HDIs today: 5029,5030,5031,6034,6036,6035,1031 
and 1032
 
All of them tested fine. | 
   | 
| 
  104  
 | 
Thu Mar 12 12:19:43 2020 | 
Matej Roguljic | HDI test | 5 HDI tests on 12.3. | I tested 5 HDIs on 12.3. 1030,1029,1040,1039 
and 1038. 1039 failed all the electrical 
tests. All the others passed the tests. HDI | 
   | 
| 
  105  
 | 
Thu Mar 12 17:21:59 2020 | 
Matej Roguljic | Full test |  Fulltests on 2020/03/12  | Modules tested:
 
M1557 C (trim bits at -20)
 
M1558 C (gain at -20)
 | 
   | 
| 
  107  
 | 
Sat Mar 14 17:08:14 2020 | 
Matej Roguljic | Full test | Fulltests on 2020/03/13 | 
 
Modules tested:
 
M1591 C (gain at -20)
 | 
   | 
| 
  108  
 | 
Mon Mar 16 10:05:23 2020 | 
Matej Roguljic | Software | PhQualification change | Urs made a change in pXar, in the PhOptimization 
algorithm. One of the changes is in the testParameters.dat 
where vcalhigh is set to 100 instead of 255. | 
   | 
| 
  109  
 | 
Mon Mar 16 11:04:41 2020 | 
Matej Roguljic | PhQualification | PhQualification 14.-15.3. | I ran PhQualification over the weekend with 
changes pulled from git (described here https://elrond.irb.hr/elog/Layer+1+Replacement/108).
 
 | 
   | 
| 
  110  
 | 
Mon Mar 16 15:17:18 2020 | 
Matej Roguljic | Module assembly | M1601 and M1602 | Andrey and I assembled modules 1601 and 1602 
on Friday, 13.3. On Monday, 16.3. I ran reception 
on them (both graded A) and then glued protection | 
   | 
| 
  111  
 | 
Mon Mar 16 15:20:03 2020 | 
Matej Roguljic | PhQualification | PhQualification on 16.3. | PhQualification was run on modules M1561, 
M1564, M1565, M1566.  | 
   | 
| 
  243  
 | 
Thu Apr 30 16:47:00 2020 | 
Matej Roguljic | Software | MoReWeb empty DAC plots | Some of the DAC parameters plots were empty 
in the total production overview page. All 
the empty plots had the number "35" in them | 
   | 
| 
  301  
 | 
Wed Sep  2 16:09:24 2020 | 
Matej Roguljic | Modules for P | M1595 switch with M1558 | Module 1595 was foreseen to go on the inner 
ladder 5, position -2 (negative two). During 
the pre-installation test, we saw it had | 
   | 
| 
  1  
 | 
Tue Aug  6 14:30:00 2019 | 
Dinko Ferencek | Documentation | Jumo Imago 500 manuals | Manuals can be found at https://www.manualslib.com/products/Jumo-Imago-500-8786441.html | 
   | 
| 
  12  
 | 
Thu Sep 19 00:52:24 2019 | 
Dinko Ferencek | Other | Modules 1504, 1505, 1520 irradiation report | [quote="Andrey Starodumov"]It was discovered 
that these modules were stored in Zagreb 
in the climatic lab where T was about +22C. | 
     | 
| 
  14  
 | 
Thu Sep 26 15:51:30 2019 | 
Dinko Ferencek | Software | pXar code updated | pXar code in /home/l_tester/L1_SW/pxar/ on 
the lab PC was updated yesterday from [URL=https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0]https://github.com/psi46/pxar/tree/15b956255afb6590931763fd07ed454fb9837fc0[/URL] 
to the latest version [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL] | 
   | 
| 
  16  
 | 
Thu Sep 26 21:48:56 2019 | 
Dinko Ferencek | Module assembly | Cap gluing training | Today I performed my first cap gluing. As 
an exercise it was first done on two dummy 
modules and later on a pre-production module | 
   | 
| 
  17  
 | 
Thu Sep 26 22:09:14 2019 | 
Dinko Ferencek | Software | DAC configuration update | In accordance with the agreement made in an 
email thread initiated by Danek, the following 
changes to DAC settings for ROCs
 | 
   | 
| 
  18  
 | 
Fri Sep 27 22:24:31 2019 | 
Dinko Ferencek | General | Activities on 27. 9. 2019. | [LIST]
 
[*] Today Silvan wire bonded TBMs to the 
first batch of 8 new HDIs which were then | 
   | 
| 
  19  
 | 
Fri Sep 27 23:22:02 2019 | 
Dinko Ferencek | Module assembly | Cap gluing training | Attached are the bump bonding threshold maps 
before and after cap gluing and the (before 
- after) difference for M1522. | 
      | 
| 
  20  
 | 
Wed Oct  2 12:41:16 2019 | 
Dinko Ferencek | Module assembly | First production modules assembled | First production modules (M1530, M1531, M1532) 
were built on Monday, Sep. 30 2019.
 
 | 
 6x   | 
| 
  21  
 | 
Wed Oct  2 12:50:52 2019 | 
Dinko Ferencek | Software | Problem with elComandante Keithley client during full qualification | Full qualification was attempted for M1532 
on Oct. 1. After the second Fulltest at -20 
C finished, the Keitley client crashed with | 
   | 
| 
  22  
 | 
Sat Oct  5 22:59:58 2019 | 
Dinko Ferencek | Software | Problem with elComandante Keithley client during full qualification | A new attempt to run the full qualification 
for M1532 was made on Friday, Oct. 4, but 
the Keithely client crashed with the same | 
   | 
| 
  36  
 | 
Wed Nov 27 18:25:08 2019 | 
Dinko Ferencek | Software | pXar code updated | pXar code in /home/l_tester/L1_SW/pxar/ on 
the lab PC was updated on Monday, Nov. 25 
from [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL] | 
   | 
| 
  37  
 | 
Wed Nov 27 21:50:02 2019 | 
Dinko Ferencek | Software | Reorganized pXar configuration files for pixel modules | Due to different DAC settings needed for PROC 
V3 and V4, a single folder containing module 
configuration files cannot cover both ROC | 
   | 
| 
  39  
 | 
Thu Nov 28 18:23:31 2019 | 
Dinko Ferencek | Software | Reorganized pXar configuration files for pixel modules | [quote="Dinko Ferencek"]Due to different DAC 
settings needed for PROC V3 and V4, a single 
folder containing module configuration files | 
   | 
| 
  40  
 | 
Thu Nov 28 18:34:00 2019 | 
Dinko Ferencek | Software | pXar code updated | [quote="Dinko Ferencek"]pXar code in /home/l_tester/L1_SW/pxar/ 
on the lab PC was updated on Monday, Nov. 
25 from [URL=https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3]https://github.com/psi46/pxar/tree/e17df08c7bbeb8472e8f56ccd2b9d69a113ccdc3[/URL] | 
   | 
| 
  41  
 | 
Thu Nov 28 18:58:30 2019 | 
Dinko Ferencek | Software | Updated Fulltest configuration | The Fulltest definition used on the lab PC 
and stored in /home/l_tester/L1_SW/elComandante/config/tests/Fulltest 
had the following content
 | 
   | 
| 
  42  
 | 
Fri Nov 29 17:06:26 2019 | 
Dinko Ferencek | General | Dropbox folder on CERNBox set up | A dropbox folder for elComandante tar files 
was set up in my CERNBox and synchronized 
with the following local folder on the lab | 
   | 
| 
  45  
 | 
Mon Jan 20 13:47:33 2020 | 
Dinko Ferencek | Software | pXar code updated | [quote="Dinko Ferencek"][quote="Dinko Ferencek"]pXar 
code in /home/l_tester/L1_SW/pxar/ on the 
lab PC was updated on Monday, Nov. 25 from | 
   | 
| 
  47  
 | 
Mon Jan 20 21:33:20 2020 | 
Dinko Ferencek | Cold box tests | Latest tests of PH optimization | We did some tests by running the latest version 
of pXar on modules M1521, M1529, M1534 and 
M1536, specifically trimming and PH optimization. | 
     | 
| 
  48  
 | 
Tue Jan 21 12:19:08 2020 | 
Dinko Ferencek | Cold box tests | Latest tests of PH optimization | [quote="Dinko Ferencek"]We did some tests 
by running the latest version of pXar on 
modules M1521, M1529, M1534 and M1536, specifically | 
   | 
| 
  49  
 | 
Wed Jan 22 11:39:48 2020 | 
Dinko Ferencek | Software | BB2 configuration | When attempting to run the FullQualification 
this morning, pXar crashed while running 
the BB2 test. After some investigation, we | 
   | 
| 
  50  
 | 
Wed Jan 22 11:50:20 2020 | 
Dinko Ferencek | Software | Module configuration files for interactive tests | There are two module configuration folders 
set up for elComandante
 
 | 
   | 
| 
  51  
 | 
Thu Jan 23 14:54:45 2020 | 
Dinko Ferencek | Cold box tests | Keithley exchanged | Yesterday during an attempt to run the FullQualification, 
elComandante would lose control over Keithley 
after performing the IV curve measurements | 
   | 
| 
  52  
 | 
Thu Jan 23 15:15:45 2020 | 
Dinko Ferencek | Software | Trimming Vcal value changed from 35 to 40 | Trimming Vcal value changed from 35 to 40 
in the testParameters.dat files stored in
 
 | 
   | 
| 
  53  
 | 
Fri Jan 24 18:12:00 2020 | 
Dinko Ferencek | Software | MoReWeb code updates | MoReWeb code updated to include the ROC wafer 
info in the XrayCalibration and XRayHRQualification 
pages:
 | 
   | 
| 
  54  
 | 
Fri Jan 24 18:16:09 2020 | 
Dinko Ferencek | Module assembly | Protective cap gluing | Today I additionally practiced protective 
cap gluing by adding a protective cap to 
module M1536. | 
   | 
| 
  55  
 | 
Fri Jan 24 18:22:00 2020 | 
Dinko Ferencek | General | L1 replacement web page updated | This week several new links were added to 
the main L1 replacement web page located 
at the following URL
 | 
   | 
| 
  62  
 | 
Tue Feb  4 19:35:38 2020 | 
Dinko Ferencek | Module transfer | 7 modules prepared for transfer to ETH: 1536, 1537, 1538, 1540, 1541, 1542, 1543 | The following modules have been prepared today 
for transport to ETH for x-ray qualification:
 
1536, 1537, 1538, 1540, 1541, 1542, 1543
 | 
   | 
| 
  63  
 | 
Tue Feb  4 19:51:10 2020 | 
Dinko Ferencek | Module assembly | Cap gluing | Today protective caps have been glued to modules 
1545, 1547, 1548, 1549, and 1550. | 
   | 
| 
  64  
 | 
Tue Feb  4 19:52:22 2020 | 
Dinko Ferencek | Cold box tests | Blue coldbox setup for reception tests commissioned | Today I continued where Matej left off with 
commissioning the blue coldbox setup for 
reception tests. All the necessary software | 
   | 
| 
  65  
 | 
Wed Feb  5 16:07:03 2020 | 
Dinko Ferencek | Module assembly | Module assembly spreadsheet migrated to Google Sheets | Excel file stored on CERNBox containing the 
module assembly spreadsheet has been replaced 
with a Google Sheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL]. | 
   | 
| 
  66  
 | 
Wed Feb  5 16:18:30 2020 | 
Dinko Ferencek | Module transfer | Module location tracking added to the assembly spreadsheet | To keep track of the module location, two 
columns were added to the module assembly 
spreadsheet [URL=https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing]https://docs.google.com/spreadsheets/d/12m2ESCLPH5AyWuuYV4KV1c5O_NEy7uP5PQKzVsdr3wQ/edit?usp=sharing[/URL] | 
   | 
| 
  67  
 | 
Thu Feb  6 00:45:25 2020 | 
Dinko Ferencek | Cold box tests | Lost at least one Peltier in the coldbox | During an overnight (Feb. 4-5) FullQualification 
run with modules 1545, 1547, 1548, and 1549 
the coldbox lost the ability to maintain | 
    | 
| 
  68  
 | 
Thu Feb  6 17:09:50 2020 | 
Dinko Ferencek | Module assembly | Gluing stamp improvements | Silvan has made additional grooves on the 
gluing stamp which now sits stably on top 
of the module without any rocking motion | 
   | 
| 
  69  
 | 
Thu Feb  6 17:19:12 2020 | 
Dinko Ferencek | Reception test | RT for 6 modules: 1551, 1552, 1553, 1554, 1555, 1556 | Today reception test was run for 6 modules 
and looks OK for all module. The modules 
were graded as follows:
 | 
   | 
| 
  70  
 | 
Thu Feb  6 17:28:23 2020 | 
Dinko Ferencek | Cold box tests | New Peltiers installed | Today new Peltiers were installed and tested. 
Unfortunately, we had trouble reaching -20 
C with this new set of Peltiers (they are | 
      | 
| 
  71  
 | 
Fri Feb  7 19:40:27 2020 | 
Dinko Ferencek | Reception test | RT for 6 modules: 1557, 1558, 1559, 1560, 1561, 1562  | Reception test is done and all 6 modules were 
graded [COLOR=darkgreen]A[/COLOR].
 
 | 
   | 
| 
  72  
 | 
Fri Feb  7 20:35:44 2020 | 
Dinko Ferencek | Full test | FT for 4 modules: 1545, 1547, 1548, 1549 | 
 
[B]1545:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10). 
Problematic ROC 14: mean noise >320e, many | 
    | 
| 
  73  
 | 
Sat Feb  8 20:48:11 2020 | 
Dinko Ferencek | Full test | FT for 4 modules: 1550, 1551, 1552, 1553  | 
 
[B]1550:[/B] [COLOR=darkblue]B/B/B[/COLOR] 
(-20/-20/+10). Electrical grade is B due | 
     | 
| 
  74  
 | 
Sun Feb  9 10:52:17 2020 | 
Dinko Ferencek | Full test | FT for 4 modules: 1539, 1554, 1555, 1556 | 
 
[B]1539:[/B] [COLOR=darkblue]B/B/B[/COLOR] 
(-20/-20/+10). Electrical grade is B due | 
   | 
| 
  75  
 | 
Sun Feb  9 12:05:47 2020 | 
Dinko Ferencek | Module assembly | Cap gluing | Today protective caps have been glued to modules 
1561 and 1562. | 
   | 
| 
  76  
 | 
Sun Feb  9 18:36:13 2020 | 
Dinko Ferencek | Module grading | Manual grading | The procedure for manual grading is described 
in [URL=https://github.com/psi46/MoReWeb/pull/120]https://github.com/psi46/MoReWeb/pull/120[/URL].
 
 | 
   | 
| 
  77  
 | 
Sun Feb  9 19:34:55 2020 | 
Dinko Ferencek | Full test | FT for 4 modules: 1557, 1558, 1559, 1560  | 
 
[B]1557:[/B] [COLOR=red]C/C/C[/COLOR] (-20/-20/+10). 
Mean noise >200e for some ROCs, dead trimbits, | 
   | 
| 
  78  
 | 
Tue Feb 11 10:25:32 2020 | 
Dinko Ferencek | Reception test | RT for 6 modules: 1563, 1564, 1565, 1566, 1567, 1568 | [COLOR=blue]Feb. 10[/COLOR]
 
 
[B]1563:[/B] Grade [COLOR=red]C[/COLOR], | 
   | 
| 
  79  
 | 
Tue Feb 11 17:56:06 2020 | 
Dinko Ferencek | Cold box tests | Fulltest failure - psiAgente | During today's full qualification the 2nd 
fulltest@-20 for TB1 (M1562) failed
 
 | 
   | 
| 
  80  
 | 
Wed Feb 12 10:43:04 2020 | 
Dinko Ferencek | Module transfer | 9 modules sent to ETH: 1539, 1545, 1547, 1548, 1549, 1550, 1551, 1552, 1553 | Yesterday the following modules were sent 
to ETH:
 
1539, 1545, 1547, 1548, 1549, 1550, 1551, | 
   | 
| 
  81  
 | 
Wed Feb 12 11:15:04 2020 | 
Dinko Ferencek | Module grading | Problem with dead trimbits understood | It was noticed that some modules are graded 
[COLOR=red]C[/COLOR] because of typically 
just one ROC having a large number of dead | 
 14x   | 
| 
  82  
 | 
Wed Feb 12 15:40:13 2020 | 
Dinko Ferencek | Reception test | RT for 3 modules: 1569, 1570, 1571; 1572 bad | [B]1569:[/B] Grade [COLOR=darkgreen]A[/COLOR]
 
[B]1570:[/B] Grade [COLOR=darkgreen]A[/COLOR]
 
[B]1571:[/B] Grade [COLOR=darkblue]B[/COLOR], | 
   | 
| 
  83  
 | 
Thu Feb 13 21:44:28 2020 | 
Dinko Ferencek | Reception test | RT for 6 modules: 1573, 1574, 1575, 1576, 1577, 1578 | [B]1573:[/B] Grade [COLOR=darkgreen]A[/COLOR]
 
[B]1574:[/B] Grade [COLOR=darkblue]B[/COLOR], 
I(150)/I(100) > 2 (4.63)
 | 
   | 
| 
  84  
 | 
Fri Feb 14 09:48:27 2020 | 
Dinko Ferencek | Full test | FT for 12 modules: 1561-1576 (1563, 1567, 1572, 1575 excluded) | [COLOR=blue]Feb. 11[/COLOR]
 
 
[B]1561:[/B] [COLOR=red]C/[/COLOR][COLOR=darkblue]B/B[/COLOR] | 
   | 
| 
  85  
 | 
Fri Feb 14 14:05:16 2020 | 
Dinko Ferencek | Module assembly | Production yield so far | Of 41 modules produced and tested so far (1536-1576), 
6 modules were found to be [COLOR=red]bad[/COLOR] 
before or during the reception test, 5 were | 
   | 
| 
  86  
 | 
Fri Feb 14 14:40:59 2020 | 
Dinko Ferencek | Reception test | RT for 2 modules: 1578, 1580 | [B]1579:[/B] Grade [COLOR=darkgreen]A[/COLOR]
 
[B]1580:[/B] Grade [COLOR=darkgreen]A[/COLOR] | 
   | 
| 
  244  
 | 
Thu Apr 30 17:24:57 2020 | 
Dinko Ferencek | Software | MoReWeb empty DAC plots | [quote="Matej Roguljic"]Some of the DAC parameters 
plots were empty in the production overview 
page. All the empty plots had the number | 
   | 
| 
  253  
 | 
Thu May  7 00:10:15 2020 | 
Dinko Ferencek | Software | MoReWeb empty DAC plots | [quote="Andrey Starodumov"][quote="Matej Roguljic"]Some 
of the DAC parameters plots were empty in 
the total production overview page. All the | 
   | 
| 
  254  
 | 
Thu May  7 00:27:41 2020 | 
Dinko Ferencek | Module grading | Comment about TrimBitDifference and its impact on the Trim Bit Test | To expand on the following [URL=https://elrond.irb.hr/elog/Layer+1+Replacement/253]elog[/URL], 
on Mar. 24 Andrey changed the TrimBitDifference 
parameter in Analyse/Configuration/GradingParameters.cfg | 
   | 
| 
  255  
 | 
Thu May  7 00:56:50 2020 | 
Dinko Ferencek | Software | MoReWeb updates related to the BB2 test | Andrey noticed that results of the BB2 test 
(here example for ROC 12 in M1675)
 
 | 
 9x   | 
| 
  256  
 | 
Thu May  7 01:51:03 2020 | 
Dinko Ferencek | Software | Strange bug/feature affecting Pixel Defects info in the Production Overview page | It was observed that sometimes the Pixel Defects 
info in the Production Overview page is missing
 
 | 
    | 
| 
  260  
 | 
Mon May 11 21:32:20 2020 | 
Dinko Ferencek | Software | Fixed double-counting of pixel defects in the production overview page | As a follow-up to this [URL=https://elrond.irb.hr/elog/Layer+1+Replacement/255]elog[/URL], 
double-counting of pixel defects in the production 
overview page was fixed in [URL=https://gitlab.cern.ch/CMS-IRB/MoReWeb/-/commit/3a2c67727b4b048c1546d666c4104396418bc2fe]3a2c6772[/URL]. | 
   | 
| 
  261  
 | 
Mon May 11 21:37:43 2020 | 
Dinko Ferencek | Software | Fixed the BB defects plots in the production overview page | [URL=https://gitlab.cern.ch/CMS-IRB/MoReWeb/-/commit/0407e04c85725cac41a1cbf08af68744c40b2bc7]0407e04c[/URL]: 
attempting to fix the BB defects plots in 
the production overview page (seems mostly | 
   | 
| 
  262  
 | 
Mon May 11 21:41:15 2020 | 
Dinko Ferencek | Software | 17 to 10 C changes in the production overview page | [URL=https://gitlab.cern.ch/CMS-IRB/MoReWeb/-/commit/0c513ab8de39460ed793ef71c21b65becd4fccb9]0c513ab8[/URL]: 
a few more updates on the main production 
overview page related to the 17 to 10 C change | 
   | 
| 
  265  
 | 
Wed May 13 23:16:37 2020 | 
Dinko Ferencek | Software | Fixed double-counting of pixel defects in the production overview page | [quote="Dinko Ferencek"]As a follow-up to 
this [URL=https://elrond.irb.hr/elog/Layer+1+Replacement/255]elog[/URL], 
double-counting of pixel defects in the production | 
   | 
| 
  274  
 | 
Tue May 26 22:56:46 2020 | 
Dinko Ferencek | FTs for ETHZ | Module list1 | The following FullQualification tar file have 
been uploaded to CERNBox
 
 | 
   | 
| 
  275  
 | 
Tue May 26 23:00:50 2020 | 
Dinko Ferencek | Other | Problem with external disk filling up too quickly | The external hard disk (LaCie) used to back 
up the L1 replacement data completely filled 
up after transferring ~70 GB worth of data | 
   | 
| 
  283  
 | 
Thu Jun  4 11:32:46 2020 | 
Dinko Ferencek | FTs for ETHZ | Module list2 | The following FullQualification tar file have 
been uploaded to CERNBox
 
 | 
   | 
| 
  289  
 | 
Tue Jun 16 00:45:48 2020 | 
Dinko Ferencek | FTs for ETHZ | Module list 3 | The following FullQualification tar file have 
been uploaded to CERNBox
 
 | 
   | 
| 
  293  
 | 
Sun Jul  5 13:20:55 2020 | 
Dinko Ferencek | General | Disk cleanup on the lab PC (pc11366.psi.ch) | Home folder was cleaned up by deleting old 
pXar output .log and .root files. The full 
list is in the attached file. This released | 
    | 
| 
  302  
 | 
Sat Sep 12 23:45:56 2020 | 
Dinko Ferencek | POS | POS configuration files created | pXar parameter files were converted to POS 
configuration files by executing the following 
commands on the lab PC at PSI
 | 
   | 
| 
  306  
 | 
Tue Nov 10 00:50:47 2020 | 
Dinko Ferencek | POS | POS configuration files created | [quote="danek kotlinski "][quote="Dinko Ferencek"]pXar 
parameter files were converted to POS configuration 
files by executing the following commands | 
   | 
| 
  308  
 | 
Tue Jan 19 15:12:12 2021 | 
Dinko Ferencek | POS | POS configuration files created | M1560 in position bpi_sec1_lyr1_ldr1_mod3 
was replaced by M1613.
 
 | 
   | 
| 
  309  
 | 
Mon Jan 25 13:03:22 2021 | 
Dinko Ferencek | POS | POS configuration files created | The output POS configuration files has '_Bpix_' 
instead of '_BPix_' in their names. The culprit 
was identified to be the C3 cell in the 'POS' | 
   | 
| 
  123  
 | 
Sun Mar 22 13:57:25 2020 | 
Danek Kotlinski | Reception test | M1617 failed | [quote="Andrey Starodumov"]ROC8 of M1617 is 
programmable but no readout from it.
 
Silvan noticed that a corner of one ROC of | 
   | 
| 
  124  
 | 
Sun Mar 22 14:02:20 2020 | 
Danek Kotlinski | Reception test | M1616 failed | [quote="Andrey Starodumov"]ROC10 of M1616 
is not programmable, no readout from ROC10 
and ROC11.
 | 
   | 
| 
  125  
 | 
Sun Mar 22 14:05:20 2020 | 
Danek Kotlinski | Reception test | M1615 failed | [quote="Andrey Starodumov"]M1615 is programmable 
but "no working phases found"
 
Visual inspection of wire bonds - OK.
 | 
   | 
| 
  156  
 | 
Mon Mar 30 14:52:59 2020 | 
Danek Kotlinski | Full test | FT of M1629, M1630, M1631, M1632 | I have tested M1630.
 
I see not problem with ROC1. See the attached 
plot.
 | 
    | 
| 
  58  
 | 
Mon Feb  3 11:28:38 2020 | 
Anrey Starodumov | Full test | 4 modules FT: 1536, 1537,1538, 1540 | [COLOR=blue]Jan 28[/COLOR]: Reception test 
for 1536, 1537, 1538 OK
 
Then cap gluing
 | 
    | 
| 
  59  
 | 
Mon Feb  3 15:35:09 2020 | 
Anrey Starodumov | Full test | 4 modules FT: 1539, 1541,1542, 1543 | [COLOR=blue]Jan 29[/COLOR] 
 
- Reception test for 1539 OK
 
- Cap gluing
 | 
    | 
| 
  10  
 | 
Fri Sep 13 15:06:51 2019 | 
Andrey Starodumov | Other | Modules 1504, 1505, 1520 irradiation report | It was discovered that these modules were 
stored in Zagreb in the climatic lab where 
T was about +22C. These modules have been | 
   | 
| 
  43  
 | 
Mon Dec  2 17:29:06 2019 | 
Andrey Starodumov | Full test | 4 modules FT | FullQualification of four modules M1526, M1529, 
M1521 and M1534 has been done. Full time 
of the test is about 5.5hrs.
 | 
   | 
| 
  44  
 | 
Tue Dec  3 12:15:54 2019 | 
Andrey Starodumov | Full test | 4 modules FT | [quote="Andrey Starodumov"]FullQualification 
of four modules M1526, M1529, M1521 and M1534 
has been done. Full time of the test is about | 
     | 
| 
  60  
 | 
Mon Feb  3 15:53:32 2020 | 
Andrey Starodumov | Reception test | 5 modules RT: 1545, 1547, 1548, 1549, 1550 | [COLOR=blue]Feb 03[/COLOR]
 
- RT is done and OK for all modules. All 
5 modules graded [COLOR=darkgreen]A[/COLOR]. | 
   | 
| 
  61  
 | 
Mon Feb  3 17:09:36 2020 | 
Andrey Starodumov | Reception test | 2 modules RT failed: 1544, 1546 | [COLOR=blue]Feb 03[/COLOR]
 
- RT failed
 
-- 1544: 
 | 
   | 
| 
  95  
 | 
Tue Mar  3 14:05:13 2020 | 
Andrey Starodumov | Re-grading | Regrading C modules: due to Noise | It has been realized by Urs that VCal to electron 
conversion used by MoreWeb is still 50e/VCal.
 
While recent calibration done by Maren with | 
   | 
| 
  97  
 | 
Wed Mar  4 16:00:05 2020 | 
Andrey Starodumov | Re-grading | Regrading C M1591: due to Noise | [quote="Andrey Starodumov"]It has been realized 
by Urs that VCal to electron conversion used 
by MoreWeb is still 50e/VCal.
 | 
   | 
| 
  98  
 | 
Mon Mar  9 16:16:48 2020 | 
Andrey Starodumov | HDI test | HDIs: 3001, 3002, 3003, 3004 and 4033 | Today I tested 5 HDIs: 3001, 3002, 3003, 3004 
and 4033
 
Results:
 | 
   | 
| 
  100  
 | 
Wed Mar 11 16:48:10 2020 | 
Andrey Starodumov | Other | M1586:  issues with MOLEX? | [quote="Urs Langenegger"]Module M1586 had 
passed the full qualification on 20/02/27. 
I had had to re-insert the cable in the Molex | 
   | 
| 
  103  
 | 
Wed Mar 11 17:59:48 2020 | 
Andrey Starodumov | Re-grading | Regrading C M1542: due to Noise | Follow the instruction from M1591 regrading 
log:
 
"To correct the Summary page one needs to | 
   | 
| 
  112  
 | 
Wed Mar 18 15:16:47 2020 | 
Andrey Starodumov | Software | Change in trimmig algorithm | Urs yesterday modified the algorithm and tested 
it. From today we are using it. Main change 
that threshold for trimming is not any more | 
   | 
| 
  113  
 | 
Wed Mar 18 15:23:27 2020 | 
Andrey Starodumov | General | New rules at PSI | From today only two persons from the group 
allowed to be present. We are working in 
shifts: Urs in the morning start full qualification | 
   | 
| 
  114  
 | 
Wed Mar 18 17:43:41 2020 | 
Andrey Starodumov | Module assembly | M1605-M1608 | M1605 and M1606: reception done on Mar 17
 
M1607 and M1608: reception done today
 
All: grade A
 | 
   | 
| 
  115  
 | 
Wed Mar 18 17:46:07 2020 | 
Andrey Starodumov | Full test | FT of M1601-M1604 | M1601-M1604 passed full test
 
M1601: grade B
 
M1602-M1604: Grade C. The main reason is | 
   | 
| 
  116  
 | 
Thu Mar 19 17:17:27 2020 | 
Andrey Starodumov | Reception test | M1609-M16012 | Reception test done and caps are glued to 
modules M1609-M1612.
 
M1611 graded B due to double column failure | 
   | 
| 
  117  
 | 
Thu Mar 19 18:01:50 2020 | 
Andrey Starodumov | Full test | FT of M1605-M1608 | Only M1607 graded B. All others are graded 
C due to trimbit test. 
 
M1606 should be looked carefully and may | 
   | 
| 
  118  
 | 
Fri Mar 20 14:46:31 2020 | 
Andrey Starodumov | Reception test | M1615 failed | M1615 is programmable but "no working phases 
found"
 
Visual inspection of wire bonds - OK.
 | 
   | 
| 
  119  
 | 
Fri Mar 20 14:53:52 2020 | 
Andrey Starodumov | Reception test | M1616 failed | ROC10 of M1616 is not programmable, no readout 
from ROC10 and ROC11.
 
Visual inspection of wire bonds - OK
 | 
   | 
| 
  120  
 | 
Fri Mar 20 17:05:58 2020 | 
Andrey Starodumov | Reception test | M1617 failed | ROC8 of M1617 is programmable but no readout 
from it.
 
Silvan noticed that a corner of one ROC of | 
   | 
| 
  121  
 | 
Fri Mar 20 18:09:47 2020 | 
Andrey Starodumov | HDI test | 3 HDIs tested | 5008 failed, but most likely die to the pin 
head mis-alignment. Test to be repeated.
 
5007 and 5008: passed tests but during HV | 
   | 
| 
  122  
 | 
Fri Mar 20 18:32:34 2020 | 
Andrey Starodumov | Full test | FT of M1609-M1612 | M1609 and M1611 are graded C
 
M1610 and M1612 are graded B
 
 | 
   | 
| 
  126  
 | 
Tue Mar 24 15:16:56 2020 | 
Andrey Starodumov | HDI test | 8 HDIs tested on Mar 23 | 1014, 1016, 2001, 2003, 
 
2004, 4013, 4015, 5014
 
All are good. | 
   | 
| 
  127  
 | 
Tue Mar 24 15:18:59 2020 | 
Andrey Starodumov | Reception test | M1621 failed Reception | On M1621 ROC8 is not programmable. | 
   | 
| 
  128  
 | 
Tue Mar 24 15:20:18 2020 | 
Andrey Starodumov | Reception test | M1623 failed Reception | M1623: all ROCs are programmable but no readout 
from ROC0-ROC3.
 
Visual inspection is OK.
 | 
   | 
| 
  129  
 | 
Tue Mar 24 15:41:29 2020 | 
Andrey Starodumov | Module grading | Change in MoreWeb  GradingParameters.cfg  | On March 3d the Vcal calibration parameter 
has been changed:  
 
- StandardVcal2ElectronConversionFactor from | 
   | 
| 
  130  
 | 
Tue Mar 24 16:08:58 2020 | 
Andrey Starodumov | Reception test | M1625 failed Reception | M1625: all ROCs are programmable but no readout 
from ROC0-ROC3.
 
The same symptom as for M1623.
 | 
   | 
| 
  131  
 | 
Tue Mar 24 18:09:07 2020 | 
Andrey Starodumov | Full test | FT of M1615, M1619, M1620, M1622 | Test results have been analysed with modified 
code:
 
M1615: B
 | 
   | 
| 
  132  
 | 
Tue Mar 24 18:11:52 2020 | 
Andrey Starodumov | Re-grading | Reanalised test results | Test resulsts of several modules have been 
re-analised without grading on trimbit failure. 
 | 
   | 
| 
  133  
 | 
Wed Mar 25 14:11:35 2020 | 
Andrey Starodumov | Reception test | RT of M1613 and M1614 on Mar 20 | Reception test for these modules have been 
done on Mar20.
 
Grading A for both modules. | 
   | 
| 
  134  
 | 
Wed Mar 25 14:17:51 2020 | 
Andrey Starodumov | Full test | FT of M1609, M1613, M1614, M1618 on Mar 23 | FT for these modules has been done on Mar 
23
 
M1609: C
 | 
   | 
| 
  136  
 | 
Wed Mar 25 14:44:37 2020 | 
Andrey Starodumov | Reception test | RT of M1627 and M1628 | Both modules graded A. | 
   | 
| 
  137  
 | 
Wed Mar 25 17:03:11 2020 | 
Andrey Starodumov | Full test | FT of M1615, M1619, M1620, M1622 | [quote="Andrey Starodumov"]Test results have 
been analysed with modified code:
 
M1615: B
 | 
   | 
| 
  138  
 | 
Wed Mar 25 18:30:23 2020 | 
Andrey Starodumov | HDI test | 4+2 HDI tested | 2 suspicious HDIs retested and found OK: 5006/5007
 
5013, 5016, 3017, 3019 are OK. | 
   | 
| 
  139  
 | 
Wed Mar 25 18:31:46 2020 | 
Andrey Starodumov | Re-grading | Reanalised test results | [quote="Andrey Starodumov"]Test resulsts of 
several modules have been re-analised without 
grading on trimbit failure. 
 | 
   | 
| 
  140  
 | 
Wed Mar 25 18:40:53 2020 | 
Andrey Starodumov | Full test | FT of M1599, M1613, M1624, M1616 | M1599: B due to leakage current at +10 (2-3umA)
 
M1613: B due to a few pixels with bad trimmed 
threshold
 | 
   | 
| 
  144  
 | 
Thu Mar 26 17:41:52 2020 | 
Andrey Starodumov | Reception test | RT of M1629-1632 | All modules M1629, M1630, M1631 and M1632 
graded A | 
   | 
| 
  145  
 | 
Thu Mar 26 17:43:06 2020 | 
Andrey Starodumov | HDI test | 6+1 HDI tested | HDIs: 6021, 3014, 2005, 2009, 2006 and 2010 
are OK
 
HDI 6024 failed: SDA0 and SDA2 on Ch1 missing
 | 
   | 
| 
  146  
 | 
Thu Mar 26 17:45:15 2020 | 
Andrey Starodumov | Full test | FT of M1545, M1557, M1627, M1628 | Retested M1545: C->B (to be correct on the 
MoreWeb summary page)
 
Retested 1557: C->C in one ROC >160 pixels | 
   | 
| 
  148  
 | 
Fri Mar 27 14:28:14 2020 | 
Andrey Starodumov | Reception test | M1633 failed Reception | All ROCs are programmable but permanent DESERALISER 
ERROR, Ch6 and Ch7 event ID mismatch.
 
Visual inspection is OK
 | 
   | 
| 
  149  
 | 
Fri Mar 27 14:32:11 2020 | 
Andrey Starodumov | HDI test | List of suspicious HDIs | Here are HDIs that the first time tested showed 
500-600V measured on the pin or directly 
on the HDI pad instead of 800V:
 | 
   | 
| 
  150  
 | 
Fri Mar 27 14:46:04 2020 | 
Andrey Starodumov | Module doctor | Wolfram's summay from Mar 25 | M1542     nothing on sdata3 (12-15), bad output 
or wire-bond
 
M1544     ROC15 timing off, can be made to | 
   | 
| 
  151  
 | 
Fri Mar 27 16:41:16 2020 | 
Andrey Starodumov | Module doctor | Wolfram's summay from Mar 25 | [quote="Andrey Starodumov"]M1542     nothing 
on sdata3 (12-15), bad output or wire-bond
 
M1544     ROC15 timing off, can be made to | 
   | 
| 
  152  
 | 
Fri Mar 27 17:27:09 2020 | 
Andrey Starodumov | Reception test | M1635 failed Reception | All ROCs are programmable but DESER400 trailer 
error bits: "NO DATA" or "IDLE DATA".
 
ROC8-11 are affected (no data)
 | 
   | 
| 
  153  
 | 
Fri Mar 27 18:28:34 2020 | 
Andrey Starodumov | Full test | 4 HDIs tested | HDIs 5020, 5018, 1044 and 1041 are OK | 
   | 
| 
  154  
 | 
Fri Mar 27 18:29:53 2020 | 
Andrey Starodumov | Full test | FT of M1629, M1630, M1631, M1632 | M1629: B due to mean noise at -20C
 
M1630: C due to ROC1 with all pixels failed 
of PH calibration (Gain). Both FT at -20C | 
   | 
| 
  158  
 | 
Mon Mar 30 16:46:59 2020 | 
Andrey Starodumov | DB | Sensors missing in Advacam spreadsheet | Dinko noticed that several sensors are missing 
in Advacam spreadsheet:
 
- 381785-03-3 used for M1586
 | 
   | 
| 
  159  
 | 
Mon Mar 30 17:40:35 2020 | 
Andrey Starodumov | HDI test | 3+2 HDIs (re-)tested | For 3 HDIs: 3014, 3017, 6021, HV has been 
re-measured. In all cases 790V is measured 
with 800V supplied.
 | 
   | 
| 
  160  
 | 
Mon Mar 30 17:49:31 2020 | 
Andrey Starodumov | Reception test | RT of M1637-1640 | All modules: M1637, M1638, M1639, M1649, are 
graded A.
 
  | 
   | 
| 
  162  
 | 
Tue Mar 31 08:21:39 2020 | 
Andrey Starodumov | Full test | FT of 1558, 1606, 1634, 1636 on Mar 30 | M1558: B 
 
M1606: C again due to trimmed threshold for 
189 pixels of ROC2 at -20C. Second time at | 
   | 
| 
  165  
 | 
Tue Mar 31 17:32:47 2020 | 
Andrey Starodumov | Reception test | RT of M1641-M1644 | All modules graded A. | 
   | 
| 
  166  
 | 
Tue Mar 31 17:33:37 2020 | 
Andrey Starodumov | Reception test | RT of M1546 | This is a module with a broken TBM. Silvan 
put a new one on top of the broken TBM.
 
The module is graded A after reception test.
 | 
   | 
| 
  168  
 | 
Tue Mar 31 18:14:47 2020 | 
Andrey Starodumov | HDI test | 3 HDI tested | HDIs: 1027, 5002, 5003 are tested. All OK. | 
   | 
| 
  169  
 | 
Tue Mar 31 18:23:18 2020 | 
Andrey Starodumov | Full test | FT of M1637, M1638, M1639, M1640 | M1637: C. Graded C due to not completed first 
test at -20C. Urs has reported issues. The 
second -20C after T-Cycle and test at +10C | 
   | 
| 
  170  
 | 
Wed Apr  1 14:36:37 2020 | 
Andrey Starodumov | Reception test | M1646 failed Reception | M1646 showed Idig=1A, ROC6 is not programmable.
 
Visual inspection: scratch on a periphery 
(between bonding pads) of ROC6.
 | 
   | 
| 
  171  
 | 
Wed Apr  1 15:32:43 2020 | 
Andrey Starodumov | Reception test | RT of M1546 | [quote="Andrey Starodumov"]This is a module 
with a broken TBM. Silvan put a new one on 
top of the broken TBM.
 | 
   | 
| 
  172  
 | 
Wed Apr  1 17:10:16 2020 | 
Andrey Starodumov | Full test | FT of M1641-M1644 | M1641: B due to mean noise > 200electons for 
a few ROCs
 
M1642: B due to mean noise > 200electons | 
   | 
| 
  173  
 | 
Thu Apr  2 17:06:19 2020 | 
Andrey Starodumov | Reception test | M1652 failed Reception | ROC1 of M1652 is not programmable. 
 
Put in the "Bad" tray as C module. | 
   | 
| 
  174  
 | 
Thu Apr  2 17:08:03 2020 | 
Andrey Starodumov | HDI test | 6 HDIs tested | 3013, 1046, 1047, 1048, 5038, 5039 are tested. 
All are OK. | 
   | 
| 
  175  
 | 
Thu Apr  2 17:10:08 2020 | 
Andrey Starodumov | Other | Cap glued to M1618 | M1618 has been tested (FT ) on March 23 without 
a protection cap. 
 
I have no idea how it's happened...
 | 
   | 
| 
  176  
 | 
Thu Apr  2 22:50:33 2020 | 
Andrey Starodumov | Full test | FT of M1645, M1646, M1647, M1648 | All modules graded B due to mean noise > 200 
electrons. | 
   | 
| 
  177  
 | 
Fri Apr  3 13:55:48 2020 | 
Andrey Starodumov | Reception test | M1653 failed Reception | Roc12-15 are not programmable.
 
Visual inspection is Ok, nothing found.
 
To module doctor! | 
   | 
| 
  178  
 | 
Fri Apr  3 14:15:01 2020 | 
Andrey Starodumov | Full test | FT of M1637, M1638, M1639, M1640 | [quote="Andrey Starodumov"]M1637: C. Graded 
C due to not completed first test at -20C. 
Urs has reported issues. The second -20C | 
   | 
| 
  179  
 | 
Fri Apr  3 14:18:15 2020 | 
Andrey Starodumov | Reception test | RT of M1651 on April 2 | Due to damaged module adapter the first Reception 
test failed and after MoreWeb analysis graded 
C.
 | 
   | 
| 
  180  
 | 
Fri Apr  3 15:21:54 2020 | 
Andrey Starodumov | Full test | FT of M1545, M1557, M1627, M1628 | [quote="Andrey Starodumov"]Retested M1545: 
C->B (to be correct on the MoreWeb summary 
page)
 | 
   | 
| 
  181  
 | 
Fri Apr  3 15:33:10 2020 | 
Andrey Starodumov | Full test | FT of M1645, M1646, M1647, M1648 | [quote="Andrey Starodumov"]All modules graded 
B due to mean noise > 200 electrons.[/quote]
 
Correction:
 | 
   | 
| 
  182  
 | 
Fri Apr  3 17:29:51 2020 | 
Andrey Starodumov | Full test | FT of M1557, M1591, M1649, M1651 | M1557: C due to 214 pixel threshold failure 
in ROC4 only at +10C (several previous FTs 
at +10C were graded B!)
 | 
   | 
| 
  183  
 | 
Fri Apr  3 17:39:19 2020 | 
Andrey Starodumov | Module doctor | M1654 | After a protection cap glued to M1654, I observed 
a few strongly bent wire bonds and probably 
some shorts on ROC8. One (VD+) of them is | 
   | 
| 
  184  
 | 
Fri Apr  3 18:06:11 2020 | 
Andrey Starodumov | HDI test | 2 HDIs tested | HDIs 6018 and 6019 are passed tests. | 
   | 
| 
  185  
 | 
Mon Apr  6 14:23:03 2020 | 
Andrey Starodumov | Full test | FT of M1645, M1646, M1647, M1648 | [quote="Andrey Starodumov"][quote="Andrey 
Starodumov"]All modules graded B due to mean 
noise > 200 electrons.[/quote]
 | 
   | 
| 
  186  
 | 
Mon Apr  6 14:27:31 2020 | 
Andrey Starodumov | Reception test | M1593 | Silvan has substituted the TBM0 of M1593.
 
I had to substitute a cable that has residuals 
and with which the Reception test failed | 
   | 
| 
  187  
 | 
Mon Apr  6 14:42:43 2020 | 
Andrey Starodumov | Reception test | RT of M1575 failed | Silvan has substituted the TBM0 of M1575.
 
Still no hits in ROC0-ROC3: "NO DATA" "IDLE 
DATA" warnings
 | 
   | 
| 
  188  
 | 
Mon Apr  6 14:52:09 2020 | 
Andrey Starodumov | Reception test | RT of M1657 failed | No hits in ROC14 and ROC15.
 
Here is an error:
 
"ERROR: <datapipe.cc/CheckEventValidity:L524> | 
   | 
| 
  189  
 | 
Mon Apr  6 17:07:23 2020 | 
Andrey Starodumov | HDI test | 8 HDIs tested | HDIs
 
4937 5043 5042 4040
 
2029 4019 4018 4017
 | 
   | 
| 
  190  
 | 
Mon Apr  6 17:18:02 2020 | 
Andrey Starodumov | Full test | FT of M1606, M1630, M1655, M1566 | M1606: B due to mean noise of several ROCs> 
200e
 
M1639: C* due to failure many pixels of ROC1 | 
   | 
| 
  191  
 | 
Tue Apr  7 14:26:48 2020 | 
Andrey Starodumov | Reception test | RT of M1567 failed | After exchange of TBM1 the results is the 
same:
 
 | 
   | 
| 
  192  
 | 
Tue Apr  7 15:25:21 2020 | 
Andrey Starodumov | Reception test | RT of M1662 failed | Address decoding of M1662 failed in one double 
column of ROC4.
 
To be decided what to do with this module.
 | 
   | 
| 
  193  
 | 
Tue Apr  7 16:57:01 2020 | 
Andrey Starodumov | Full test | FT of M1593, M1658, M1659, M1660 | M1593: B due to Rel.gain width and mean noise 
of a few ROCs
 
M1658: B due to threshold and mean noise | 
   | 
| 
  194  
 | 
Tue Apr  7 17:59:27 2020 | 
Andrey Starodumov | HDI test | 6 HDIs tested | HDIs
 
2030, 2031, 1021, 1022, 1023, 1035 
 
are tested. All OK. | 
   | 
| 
  195  
 | 
Tue Apr  7 18:02:07 2020 | 
Andrey Starodumov | Reception test | RT of 1654 | After Silvan removed a cap and re-bonded broken 
and bent wires M1654 again has been tested.
 
RT grade is A.
 | 
   | 
| 
  196  
 | 
Wed Apr  8 13:40:45 2020 | 
Andrey Starodumov | Reception test | RT of M1625 failed | Silvan substituted TBM on this module.
 
Now ROC0 does not have hits.
 
Grade C, goes to "Bad" tray. | 
   | 
| 
  197  
 | 
Wed Apr  8 13:43:15 2020 | 
Andrey Starodumov | Reception test | RT of M1623 failed | M1623: all ROCs are programmable but no readout 
from ROC8-ROC11.
 
Visual inspection is OK.
 | 
   | 
| 
  198  
 | 
Wed Apr  8 15:02:37 2020 | 
Andrey Starodumov | Software | Change of CrtlReg for RT | So far in a blue box for RT tbm10d_procv3 
parameters were used. 
 
This is wrong, since CtrlReg=9 is better | 
   | 
| 
  199  
 | 
Wed Apr  8 15:20:38 2020 | 
Andrey Starodumov | Reception test | RT of M1665 | With CtrlReg=9 RT grade was B due to 90 noisy 
pixels in ROC5.
 
Noisy in this case means that one pixel in | 
   | 
| 
  200  
 | 
Wed Apr  8 17:09:05 2020 | 
Andrey Starodumov | Full test | FT of M1572, M1661, M1663, M1664 | M1572: Grade B due to mean noise of ROC4 211 
electrons
 
M1661: Grade B due to mean noise of a few | 
   | 
| 
  201  
 | 
Wed Apr  8 17:17:13 2020 | 
Andrey Starodumov | Reception test | RT of M1662 failed | [quote="Andrey Starodumov"]Address decoding 
of M1662 failed in one double column of ROC4.
 
To be decided what to do with this module.
 | 
   | 
| 
  203  
 | 
Thu Apr  9 14:36:10 2020 | 
Andrey Starodumov | Reception test | RT of M1669 and M1670 | Both modules graded A. | 
   | 
| 
  204  
 | 
Thu Apr  9 14:49:07 2020 | 
Andrey Starodumov | Reception test | RT of M1650 failed | Module has been tested on April 2nd.
 
Under Molex connector in ROC12 471 dead or 
noisy pixels.
 | 
   | 
| 
  206  
 | 
Thu Apr  9 17:24:49 2020 | 
Andrey Starodumov | Full test | FT of M1654, M1665, M1666, M1667 | M1654: Grade A
 
M1665: Grade B due to noisy pixels in ROC5. 
To be checked by module doctor!
 | 
   | 
| 
  207  
 | 
Thu Apr  9 17:36:31 2020 | 
Andrey Starodumov | Reception test | RT of M1671 failed | ROC12-ROC15 no hits.
 
A candidate to TBM0 substitution, hence Grade 
C*.
 | 
   | 
| 
  208  
 | 
Thu Apr  9 17:43:54 2020 | 
Andrey Starodumov | HDI test | 4 HDIa tested | HDIs 3029, 3031, 3032, 4042 passed tests. 
All OK. | 
   | 
| 
  209  
 | 
Tue Apr 14 15:49:05 2020 | 
Andrey Starodumov | Reception test | RT of M1623, M1657, M1673, M1674 | M1623: Grade A, should be B due to 71 bump 
defects in ROC4 
 
M1657: Grade B, due to 51 dead pixels in | 
   | 
| 
  210  
 | 
Tue Apr 14 16:54:31 2020 | 
Andrey Starodumov | Other | M1633 cable disconnected | We do not have any more module holders. 
 
M1633 was in "Module doctor" tray.
 
I took module off the holder and put it in | 
   | 
| 
  211  
 | 
Tue Apr 14 17:19:44 2020 | 
Andrey Starodumov | Full test | FT of M1668, M1669, M1670, M1672 | M1668: Grade B due to mean noise >200e for 
several ROCs
 
M1669: Grade B due to ROC2 mean noise >200e
 | 
   | 
| 
  212  
 | 
Tue Apr 14 17:29:46 2020 | 
Andrey Starodumov | General | ROC4 or ROC12 defects | Starting from M1650 almost every module has 
a cluster of dead pixels or broken bump bonds 
on
 | 
   | 
| 
  215  
 | 
Wed Apr 15 17:26:46 2020 | 
Andrey Starodumov | Full test | FT of M1623, M1657, M1673, M1674 | M1623: Grade B due to rel gain width, in ROC4 
74 pixels failed trimming (Threshold) and 
mean noise >200e
 | 
   | 
| 
  217  
 | 
Thu Apr 16 15:21:51 2020 | 
Andrey Starodumov | Change TBM  | Change TBMs on M1635, M1653, M1671 | M1635: no data from ROC8-ROC11 => change TBM1
 
M1653: ROC12-ROC15 not programmable => change 
TBM0
 | 
   | 
| 
  218  
 | 
Thu Apr 16 17:31:16 2020 | 
Andrey Starodumov | Full test | FT of M1662, M1675, M1676 | M1662: Grade C due to failure of ROC4 in almost 
all tests: PixelAlive, PH calibration etc
 
Should be investigated and retested. At Reception | 
   | 
| 
  219  
 | 
Fri Apr 17 18:05:45 2020 | 
Andrey Starodumov | Full test | FT of M1542, M1557, M1630, M1649 only at +10C | M1542 has grade C for relative gain width. 
Was tested with early versions of test SW 
with trim VCal=40 and not yet optimized PH | 
   | 
| 
  220  
 | 
Mon Apr 20 15:20:07 2020 | 
Andrey Starodumov | Reception test | Change TBMs on M1635, M1653, M1671 | [quote="Andrey Starodumov"]M1635: no data 
from ROC8-ROC11 => change TBM1
 
M1653: ROC12-ROC15 not programmable => change | 
   | 
| 
  221  
 | 
Mon Apr 20 17:09:12 2020 | 
Andrey Starodumov | HDI test | 4 HDIs tested | After staying in 90%+ RH 2 HDIs became flat. 
The first one was easy to mount on an HDI 
holder.
 | 
   | 
| 
  222  
 | 
Tue Apr 21 15:34:57 2020 | 
Andrey Starodumov | General | Retesting starts today | From today we will retest modules that have 
been tested with pXar SW versions earlier 
than March 18.
 | 
   | 
| 
  223  
 | 
Tue Apr 21 17:39:48 2020 | 
Andrey Starodumov | Full test | FT of M1542, M1554, M1555, M1653 | M1542: Grade C due to massive (>1000pixels 
in total) trimming failures at -20C in ROC11,14,15. 
There was no such problem at previous test | 
   | 
| 
  224  
 | 
Wed Apr 22 17:28:42 2020 | 
Andrey Starodumov | HDI test | 11 HDIs tested | After keeping HDIs in a very high RH for a 
dew hours (24 is fine) became flat and could 
be fixed on HDI holder by vacuum.
 | 
   | 
| 
  225  
 | 
Wed Apr 22 17:41:11 2020 | 
Andrey Starodumov | Full test | FT of M1542, M1554, M1555, M1653 | [quote="Andrey Starodumov"]
 
M1542: Grade C due to massive (>1000pixels 
in total) trimming failures at -20C in ROC11,14,15. | 
   | 
| 
  226  
 | 
Thu Apr 23 13:34:52 2020 | 
Andrey Starodumov | Full test | FT of M1542, M1554, M1555, M1653 | [quote="Andrey Starodumov"][quote="Andrey 
Starodumov"]
 
M1542: Grade C due to massive (>1000pixels | 
   | 
| 
  227  
 | 
Thu Apr 23 13:37:29 2020 | 
Andrey Starodumov | Full test | FT of M1556, M1557, M1559, M1560 | M1556: Grade B due to several ROCs mean noise 
>200e
 
M1557: Grade B due to several ROCs mean noise | 
   | 
| 
  228  
 | 
Thu Apr 23 17:26:51 2020 | 
Andrey Starodumov | Full test | FT of M1561, M1564, M1565, M1566 | M1561: Grade B due to several ROCs mean noise 
>200e
 
M1564: Grade B due to two ROCs mean noise | 
   | 
| 
  229  
 | 
Thu Apr 23 18:01:16 2020 | 
Andrey Starodumov | HDI test | 4 HDIs tested | The following HDIs are tested:
 
6007: OK
 
1034: Failed due to not working Channel 1 | 
   | 
| 
  230  
 | 
Fri Apr 24 13:56:11 2020 | 
Andrey Starodumov | HDI test | 3 HDIs tested | Following HDIs tested from the box "to be 
understood":
 
5021, 3019, 5008. All are fine. | 
   | 
| 
  231  
 | 
Fri Apr 24 13:59:43 2020 | 
Andrey Starodumov | Full test | FT of M1568, M1569, M1570, M1571 | M1568: Grade B due to mean noise >200e for 
a few ROCs and for ROC0 RelGainWidth(=0.1) 
is twice larger then for other ROCs
 | 
   | 
| 
  232  
 | 
Mon Apr 27 13:23:47 2020 | 
Andrey Starodumov | Full test | FT of M1573, M1574, M1576, M1577 | Test has been done on April 24
 
M1573: Grade B due to mean noise >200e for 
a few ROCs
 | 
   | 
| 
  233  
 | 
Mon Apr 27 13:50:09 2020 | 
Andrey Starodumov | Full test | FT of M1578, M1579, M1580, M1581 | M1578: Grade B due to mean noise >200e for 
a few ROCs and 67 pixels failed trimming 
in ROC1 at -20C
 | 
   | 
| 
  234  
 | 
Mon Apr 27 14:21:17 2020 | 
Andrey Starodumov | HDI test | 3 HDIs tested | # remaining HDIs from "to be understood" box 
were tested after flattening them during 
weekend in RH=99.9% box.
 | 
   | 
| 
  235  
 | 
Tue Apr 28 18:06:41 2020 | 
Andrey Starodumov | Full test | FT of M1582, M1583, M1584, M1585 | Modules tested om Apr 27
 
M1582: Grade C due to 167 pixels failed trimming 
on ROC1 at +10C only. Previous test on Feb | 
   | 
| 
  236  
 | 
Tue Apr 28 18:11:45 2020 | 
Andrey Starodumov | Full test | FT of M1586, M1587, M1588, M1589 | M1586: Grade B due to mean noise >200e for 
a few ROCs
 
M1587: Grade B due to mean noise >200e for | 
   | 
| 
  238  
 | 
Wed Apr 29 14:08:42 2020 | 
Andrey Starodumov | Full test | FT of M1536, M1537, M1538 | M1536: Grade B due to mean noise >200e for 
ROC1
 
M1537: Grade B due to mean noise >200e for | 
   | 
| 
  239  
 | 
Wed Apr 29 18:11:36 2020 | 
Andrey Starodumov | Full test | FT of M1590, M1592, M1596, M1600 | Modules tested om April 28
 
M1590: Grade B  Grade B due to mean noise 
>200e for a few ROCs
 | 
   | 
| 
  240  
 | 
Thu Apr 30 15:16:58 2020 | 
Andrey Starodumov | Full test | FT of M1540, M1541, M1543, M1547 | Modules tested om April 29
 
M1540: Grade B due to many (>1000) pixels 
failed trimming but only 70 are in "C-zone" | 
   | 
| 
  241  
 | 
Thu Apr 30 15:25:36 2020 | 
Andrey Starodumov | Full test | FT of M1548, M1549, M1550, M1551 | M1548: Grade B due to mean noise >200e for 
ROC11
 
M1549: Grade B due to mean noise >200e for | 
   | 
| 
  245  
 | 
Thu Apr 30 17:33:04 2020 | 
Andrey Starodumov | Software | MoReWeb empty DAC plots | [quote="Matej Roguljic"]Some of the DAC parameters 
plots were empty in the total production 
overview page. All the empty plots had the | 
   | 
| 
  247  
 | 
Mon May  4 14:13:39 2020 | 
Andrey Starodumov | Full test | FT of M1552, M1553, M1595, M1597 | FT on April 30th
 
M1552: Grade B due to mean noise >200e for 
ROC7,8
 | 
   | 
| 
  248  
 | 
Mon May  4 14:18:20 2020 | 
Andrey Starodumov | Full test | FT of M1540, 1549, 1571, 1598 | M1540: Grade A
 
M1549: Grade B due to mean noise >200e for 
ROC2 and 48 dead pixels in ROC5
 | 
   | 
| 
  249  
 | 
Mon May  4 15:28:14 2020 | 
Andrey Starodumov | General | M1660  | M1660 is taken from gel-pak and cabled for 
retest.
 
This module was graded C only at second FT | 
   | 
| 
  250  
 | 
Tue May  5 13:58:45 2020 | 
Andrey Starodumov | Full test | FT of M1582, M1649, M1667 | M1582: Grade C due to trimming failure in 
ROC1 for 189 pixels at +10C. This is third 
time module restesed:
 | 
   | 
| 
  251  
 | 
Wed May  6 13:20:28 2020 | 
Andrey Starodumov | Full test | FT of M1574, M1581, M1660, M1668 | Modules tested on May 5th
 
M1574: Grade B due to mean noise >200e in 
ROC10 and trimming failures for 89 pixels | 
   | 
| 
  252  
 | 
Wed May  6 16:24:21 2020 | 
Andrey Starodumov | Full test | FT of M1580, M1595, M1606, M1659 | M1580: Grade B due to mean noise >200e in 
ROC5/8 and trimming failures for 100+ pixels 
in the same ROCs at +10C, previous result | 
   | 
| 
  257  
 | 
Mon May 11 13:19:51 2020 | 
Andrey Starodumov | Cold box tests | M1539 | After several attempts including reconnecting 
the cable, M1539 had no readout if it's connected 
to TB3. When connected to TB1, M1539 did | 
   | 
| 
  263  
 | 
Tue May 12 13:29:27 2020 | 
Andrey Starodumov | Full test | FT of M1539, M1582, M1606 | M1539: Grade B due to mean noise >200e in 
few ROCs
 
M1582: Grade B due to mean noise >200e in | 
   | 
| 
  264  
 | 
Wed May 13 17:57:45 2020 | 
Andrey Starodumov | Other | L1_DATA backup | L1_DATA files are backed up to the LaCie disk | 
   | 
| 
  266  
 | 
Fri May 15 17:15:34 2020 | 
Andrey Starodumov | XRay HR tests | Analysis of HRT:  M1630, M1632, M1636, M1638 | Krunal proved test result of four modules 
and Dinko analised them.
 
M1630: Grade A, VCal calibration: Slope=43.5e-/Vcal, | 
   | 
| 
  267  
 | 
Mon May 18 14:05:01 2020 | 
Andrey Starodumov | Module transfer | 8 modules shipped to ETHZ | M1555, M1556, M1557, 
 
M1558, M1559, M1560,
 
M1561, M1564 | 
   | 
| 
  268  
 | 
Tue May 19 13:43:55 2020 | 
Andrey Starodumov | Module transfer | 9 modules shipped to PSI | Quick check: Leakage current, set Vana, VthrCompCalDel 
and PixelAlive
 
Module    Current@-150V    Programmable  | 
   | 
| 
  269  
 | 
Fri May 22 16:06:43 2020 | 
Andrey Starodumov | XRay HR tests | Analysis of HRT: M1623, M1632, M1634, M1636-M1639,M1640 | Module                HRtest              
  VCal calibration     Grade
 
           #defects      max #noisy pix
 | 
   | 
| 
  270  
 | 
Fri May 22 16:19:01 2020 | 
Andrey Starodumov | Software | Change in MoreWeb  GradingParameters.cfg | Xray noise:
 
grade B moved from 300e to 400e
 
grade C moved from 400e to 500e | 
   | 
| 
  271  
 | 
Fri May 22 17:09:37 2020 | 
Andrey Starodumov | FTs for ETHZ | Module list1 | [COLOR=green]green[/COLOR]: correct in Total 
production overview
 
black: to remove old entries/raws
 | 
   | 
| 
  272  
 | 
Mon May 25 16:58:23 2020 | 
Andrey Starodumov | XRay HR tests | a few commments | These is just to record the information:
 
1. measured hit rates at which Efficiency 
and Xray hits Maps are taken are 40-50% of | 
   | 
| 
  273  
 | 
Mon May 25 17:24:05 2020 | 
Andrey Starodumov | Software | Change in MoreWeb ColumnUniformityPerColumn.py | In file
 
~/L1_SW/MoReWeb/Analyse/TestResultClasses/CMSPixel/QualificationGroup/XRayHRQualification$ 
emacs Chips/Chip/ColumnUniformityPerColumn/ColumnUniformityPerColumn.py
 | 
   | 
| 
  276  
 | 
Thu May 28 14:38:43 2020 | 
Andrey Starodumov | Module transfer | 18 Modules shipped to ETHZ | 1536, 1537, 1539, 1540, 1541,
 
1543, 1545, 1547, 1548, 1550,
 
1551, 1552, 1553, 1554, 1565,
 | 
   | 
| 
  277  
 | 
Thu May 28 14:40:57 2020 | 
Andrey Starodumov | Module transfer | 8 modules shipped to PSI | Quick check: Leakage current, set Vana, VthrCompCalDel 
and PixelAlive
 
Module Current@-150V Programmable Readout
 | 
   | 
| 
  278  
 | 
Fri May 29 13:56:35 2020 | 
Andrey Starodumov | Re-grading | M1630 | In ROC1 of M1630 gain calibration failed massively 
(3883 pixels) at +10C with CtrlReg 9.
 
A special test of M1630 only at +10C and | 
   | 
| 
  279  
 | 
Fri May 29 15:04:04 2020 | 
Andrey Starodumov | XRay HR tests | Analysis of HRT: M1555-M1561 and M1564 | Module            HRtest                VCal 
calibration     Grade
 
          #defects        max #noisy pix
 | 
   | 
| 
  280  
 | 
Fri May 29 15:41:40 2020 | 
Andrey Starodumov | General | M1546 | ROC10 of M1546 has 107 pixels with trimming 
problems:
 
in a VCal threshold scan after trimming 81 | 
      | 
| 
  281  
 | 
Fri May 29 15:56:27 2020 | 
Andrey Starodumov | FTs for ETHZ | Module list2 | [COLOR=green]green:[/COLOR] correct in Total 
production overview
 
black: to remove old entries/rows
 | 
   | 
| 
  284  
 | 
Thu Jun  4 15:32:50 2020 | 
Andrey Starodumov | Module transfer | 18 Modules shipped to PSI | Quick check: Leakage current, set Vana, VthrCompCalDel 
and PixelAlive
 
T=+24C
 | 
   | 
| 
  285  
 | 
Fri Jun  5 13:47:11 2020 | 
Andrey Starodumov | Module grading | M1613 | FT of this modules has been done twice: March 
23 and March 25, in both cases with the final 
test SW. On March 23 module was graded C | 
   | 
| 
  286  
 | 
Fri Jun  5 16:22:19 2020 | 
Andrey Starodumov | General | Cleaning L1_DATA directory | To be able to analyse Xray data and keep Total 
Production overview in a proper state we 
need to clean L1_DATA directory.
 | 
   | 
| 
  288  
 | 
Mon Jun 15 10:36:45 2020 | 
Andrey Starodumov | FTs for ETHZ | Module list 3 | M1596 2020-04-28 
 
M1597 2020-04-30 
 
M1598 2020-05-04 
 | 
   | 
| 
  296  
 | 
Fri Aug 14 13:47:26 2020 | 
Andrey Starodumov | General | new PH optimisation test and Total Overview | New PH optimisation is done at -20C as a FT, 
hence the results of this test are added 
to "DB" file as the second m20_1 test.
 | 
   | 
| 
  297  
 | 
Fri Aug 28 11:13:33 2020 | 
Andrey Starodumov | Module grading | M1615 | M1615: one pixel in ROC10 unmaskable hence 
should be graded C. Otherwise the module 
is of grade A
 | 
   | 
| 
  298  
 | 
Fri Aug 28 11:53:23 2020 | 
Andrey Starodumov | PhQualification | M1555 | There is no new PH optimisation for this module?!
 
To be checked! | 
   | 
| 
  299  
 | 
Fri Aug 28 12:02:48 2020 | 
Andrey Starodumov | XRay HR tests | M1599 | ROC5 has eff=93.65% and should be graded C. 
Somehow efficiency was not taken into account 
for HR test grading??? | 
   | 
| 
  300  
 | 
Fri Aug 28 14:07:24 2020 | 
Andrey Starodumov | PhQualification | M1539 | There is no new PH optimisation for this module?!
 
To be checked! | 
   | 
| 
  303  
 | 
Fri Sep 18 15:45:21 2020 | 
Andrey Starodumov | Other | M2211 and M2122 | I made a mistake and instead M2122 used ID 
M2211 in the .ini file.
 
Hence now we do not have entry for M2122 | 
   | 
| 
  307  
 | 
Mon Jan 18 13:53:44 2021 | 
Andrey Starodumov | Other | DTB tests | M2217
 
--->DTB 154 (one of the red cold box setup):
 
- flat cable (with HV):
 | 
   | 
| 
  33  
 | 
Tue Nov 19 14:10:10 2019 | 
Andrey  | Cold box tests | new modules M1533 and M1534 | Yesterday Silvan wire bonded two new modules 
M1533 and M1534 that are both grade C due 
to high leakage current and a few ROCs with | 
   | 
| 
  34  
 | 
Wed Nov 20 16:53:50 2019 | 
Andrey  | Full test | M1533 and M1534 FullQualification | FullQualification of two modules M1533 and 
M1534 has been done. Full time of the test 
is about 7hrs.
 | 
   |